{"id":1964227,"date":"2026-05-30T02:19:27","date_gmt":"2026-05-29T23:19:27","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1964227"},"modified":"2026-05-30T02:19:27","modified_gmt":"2026-05-29T23:19:27","slug":"compania-de-apa-buzau-a-prezentat-evolutia-lucrarilor-din-contractul-de-investitii-cl10-in-cadrul-unei-intalniri-publice-organizata-la-patarlagele","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1964227","title":{"rendered":"Compania de Ap\u0103 Buz\u0103u a prezentat evolu\u021bia lucr\u0103rilor din contractul de investi\u021bii CL10 \u00een cadrul unei \u00eent\u00e2lniri publice organizat\u0103 la P\u0103t\u00e2rlagele"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-041827_Gmail.jpg&#8221;]<\/p>\n<div class=\"elementor-element elementor-element-22c955c elementor-widget elementor-widget-theme-post-content\" data-id=\"22c955c\" data-element_type=\"widget\" data-widget_type=\"theme-post-content.default\">\n<div class=\"elementor-widget-container\">\n<p>\u00cen data de 26 mai 2026, Compania de Ap\u0103 Buz\u0103u a organizat, \u00een Sala de \u0219edin\u021be a Consiliului Local al ora\u0219ului P\u0103t\u00e2rlagele, o \u00eent\u00e2lnire public\u0103 dedicat\u0103 prezent\u0103rii stadiului de implementare a Contractului de lucr\u0103ri CL10 \u2013 \u201eRe\u021bele de alimentare cu ap\u0103 \u00een localit\u0103\u021bile: R\u00e2mnicu S\u0103rat, P\u0103t\u00e2rlagele, Valea Sibiciului, Valea Lupului, Valea Viei, Muscel, M\u0103run\u021bi\u0219u \u0219i M\u0103gura \u0219i re\u021bele de canalizare \u00een localit\u0103\u021bile: R\u00e2mnicu S\u0103rat, Valea Lupului, Sibiciu de Sus, Lunca, Valea Viei, M\u0103run\u021bi\u0219u, Poienile \u0219i Muscel\u201d.<\/p>\n<p>Proiectul vizeaz\u0103 extinderea \u0219i modernizarea infrastructurii de ap\u0103 \u0219i canalizare \u00een mai multe localit\u0103\u021bi din jude\u021bul Buz\u0103u \u0219i reprezint\u0103 una dintre cele mai importante investi\u021bii \u00een utilit\u0103\u021bi publice derulate \u00een aceast\u0103 zon\u0103.<\/p>\n<p>Contractul este implementat de Asocierea Keyboard SRL \u2013 Hydrostroy AD \u0219i are o valoare de 89.474.911,75 lei f\u0103r\u0103 TVA. <\/p>\n<p>Lucr\u0103rile au \u00eenceput la data de 15.02.2024, termenul estimat pentru finalizare fiind 16.08.2026, iar perioada de garan\u021bie este de 3 ani de la recep\u021bia la terminarea lucr\u0103rilor.<\/p>\n<p>\u00cen cadrul \u00eent\u00e2lnirii au fost prezentate investi\u021biile realizate \u00een U.A.T. R\u00e2mnicu S\u0103rat, U.A.T. P\u0103t\u00e2rlagele \u0219i U.A.T. M\u0103gura, precum \u0219i stadiul actual al lucr\u0103rilor.<\/p>\n<p><a href=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-041844_Gmail.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-041844_Gmail-1024x600.jpg\" alt width=\"800\" height=\"469\" class=\"aligncenter size-large wp-image-75883\"><\/a><\/p>\n<p>Potrivit datelor prezentate, progresul fizic total al contractului este de 62,19%, iar \u00een unele localit\u0103\u021bi lucr\u0103rile sunt aproape finalizate:<br \/>\n\u2022 U.A.T. M\u0103gura \u2013 92,97%;<br \/>\n\u2022 U.A.T. R\u00e2mnicu S\u0103rat \u2013 88,42%;<br \/>\n\u2022 U.A.T. P\u0103t\u00e2rlagele \u2013 51,39%.<br \/>\nPrintre investi\u021biile realizate se num\u0103r\u0103 extinderea \u0219i reabilitarea re\u021belelor de ap\u0103 \u0219i canalizare, construirea de sta\u021bii de pompare \u0219i modernizarea infrastructurii necesare aliment\u0103rii cu ap\u0103 potabil\u0103 \u0219i colect\u0103rii apelor uzate.<\/p>\n<p><a href=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-042250_Gmail.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-042250_Gmail-1024x604.jpg\" alt width=\"800\" height=\"472\" class=\"aligncenter size-large wp-image-75884\"><\/a><\/p>\n<p>Reprezentan\u021bii proiectului au subliniat faptul c\u0103 aceste investi\u021bii vor contribui semnificativ la cre\u0219terea calit\u0103\u021bii vie\u021bii locuitorilor din comunit\u0103\u021bile beneficiare, prin acces la servicii moderne de ap\u0103 \u0219i canalizare \u0219i prin dezvoltarea infrastructurii publice din jude\u021b.<\/p>\n<\/div>\n<\/div>\n<div class=\"elementor-element elementor-element-22c955c elementor-widget elementor-widget-theme-post-content\" data-id=\"22c955c\" data-element_type=\"widget\" data-widget_type=\"theme-post-content.default\">\n<div class=\"elementor-widget-container\">\n<p>\u00cen data de 26 mai 2026, Compania de Ap\u0103 Buz\u0103u a organizat, \u00een Sala de \u0219edin\u021be a Consiliului Local al ora\u0219ului P\u0103t\u00e2rlagele, o \u00eent\u00e2lnire public\u0103 dedicat\u0103 prezent\u0103rii stadiului de implementare a Contractului de lucr\u0103ri CL10 \u2013 \u201eRe\u021bele de alimentare cu ap\u0103 \u00een localit\u0103\u021bile: R\u00e2mnicu S\u0103rat, P\u0103t\u00e2rlagele, Valea Sibiciului, Valea Lupului, Valea Viei, Muscel, M\u0103run\u021bi\u0219u \u0219i M\u0103gura \u0219i re\u021bele de canalizare \u00een localit\u0103\u021bile: R\u00e2mnicu S\u0103rat, Valea Lupului, Sibiciu de Sus, Lunca, Valea Viei, M\u0103run\u021bi\u0219u, Poienile \u0219i Muscel\u201d.<\/p>\n<p>Proiectul vizeaz\u0103 extinderea \u0219i modernizarea infrastructurii de ap\u0103 \u0219i canalizare \u00een mai multe localit\u0103\u021bi din jude\u021bul Buz\u0103u \u0219i reprezint\u0103 una dintre cele mai importante investi\u021bii \u00een utilit\u0103\u021bi publice derulate \u00een aceast\u0103 zon\u0103.<\/p>\n<p>Contractul este implementat de Asocierea Keyboard SRL \u2013 Hydrostroy AD \u0219i are o valoare de 89.474.911,75 lei f\u0103r\u0103 TVA. <\/p>\n<p>Lucr\u0103rile au \u00eenceput la data de 15.02.2024, termenul estimat pentru finalizare fiind 16.08.2026, iar perioada de garan\u021bie este de 3 ani de la recep\u021bia la terminarea lucr\u0103rilor.<\/p>\n<p>\u00cen cadrul \u00eent\u00e2lnirii au fost prezentate investi\u021biile realizate \u00een U.A.T. R\u00e2mnicu S\u0103rat, U.A.T. P\u0103t\u00e2rlagele \u0219i U.A.T. M\u0103gura, precum \u0219i stadiul actual al lucr\u0103rilor.<\/p>\n<p><a href=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-041844_Gmail.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-041844_Gmail-1024x600.jpg\" alt width=\"800\" height=\"469\" class=\"aligncenter size-large wp-image-75883\"><\/a><\/p>\n<p>Potrivit datelor prezentate, progresul fizic total al contractului este de 62,19%, iar \u00een unele localit\u0103\u021bi lucr\u0103rile sunt aproape finalizate:<br \/>\n\u2022 U.A.T. M\u0103gura \u2013 92,97%;<br \/>\n\u2022 U.A.T. R\u00e2mnicu S\u0103rat \u2013 88,42%;<br \/>\n\u2022 U.A.T. P\u0103t\u00e2rlagele \u2013 51,39%.<br \/>\nPrintre investi\u021biile realizate se num\u0103r\u0103 extinderea \u0219i reabilitarea re\u021belelor de ap\u0103 \u0219i canalizare, construirea de sta\u021bii de pompare \u0219i modernizarea infrastructurii necesare aliment\u0103rii cu ap\u0103 potabil\u0103 \u0219i colect\u0103rii apelor uzate.<\/p>\n<p><a href=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-042250_Gmail.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-042250_Gmail-1024x604.jpg\" alt width=\"800\" height=\"472\" class=\"aligncenter size-large wp-image-75884\"><\/a><\/p>\n<p>Reprezentan\u021bii proiectului au subliniat faptul c\u0103 aceste investi\u021bii vor contribui semnificativ la cre\u0219terea calit\u0103\u021bii vie\u021bii locuitorilor din comunit\u0103\u021bile beneficiare, prin acces la servicii moderne de ap\u0103 \u0219i canalizare \u0219i prin dezvoltarea infrastructurii publice din jude\u021b.<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/stiridebuzau.ro\/compania-de-apa-buzau-a-prezentat-evolutia-lucrarilor-din-contractul-de-investitii-cl10-in-cadrul-unei-intalniri-publice-organizata-la-patarlagele\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/stiridebuzau.ro\/wp-content\/uploads\/2026\/05\/Screenshot_20260530-041827_Gmail.jpg&#8221;] \u00cen data de 26 mai 2026, Compania de Ap\u0103 Buz\u0103u a organizat, \u00een Sala de \u0219edin\u021be a Consiliului Local al ora\u0219ului P\u0103t\u00e2rlagele, o \u00eent\u00e2lnire public\u0103 dedicat\u0103 prezent\u0103rii stadiului de implementare a Contractului de lucr\u0103ri CL10 \u2013 \u201eRe\u021bele de alimentare cu ap\u0103 \u00een localit\u0103\u021bile: R\u00e2mnicu S\u0103rat, P\u0103t\u00e2rlagele, Valea Sibiciului, Valea Lupului, Valea Viei, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[226,117],"class_list":["post-1964227","post","type-post","status-publish","format-standard","hentry","category-politics","tag-crawlmanager","tag-stiridebuzau-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1964227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1964227"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1964227\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1964227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1964227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1964227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}