{"id":1953250,"date":"2026-05-23T14:19:00","date_gmt":"2026-05-23T11:19:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1953250"},"modified":"2026-05-23T14:19:00","modified_gmt":"2026-05-23T11:19:00","slug":"bolojan-suna-mobilizarea-generala-nu-ne-permitem-sa-pierdem-bani","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1953250","title":{"rendered":"Bolojan sun\u0103 mobilizarea general\u0103: &#8220;Nu ne permitem s\u0103 pierdem bani&#8221;"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.observatornews.ro\/?u=https%3A%2F%2Fobservatornews.ro%2Fuploads%2Fmodules%2Fnews%2F0%2F2026%2F5%2F23%2F655418%2Filie-bolojan-fd75ee93.jpg&amp;w=1200&amp;h=630&amp;c=1&#8243;]<\/p>\n<div class=\"articleBody\" data-key=\"articleBody\">To\u021bi primarii din \u021bar\u0103 au fost convoca\u021bi luni diminea\u021b\u0103 pentru un inventar de urgen\u021b\u0103 al proiectelor PNRR. Bolojan a explicat c\u0103 exist\u0103 \u00een derulare peste 15.000 de proiecte \u00een administra\u021biile publice din Rom\u00e2nia. Cele care pot fi terminate p\u00e2n\u0103 la 31 august trebuie s\u0103 r\u0103m\u00e2n\u0103 pe componenta de grant. Un proiect finalizat \u00een propor\u021bie de 90%, dar r\u0103mas pe grant f\u0103r\u0103 a fi terminat la termen, atrage pierderea integral\u0103 a sumei alocate.<\/p>\n<p>Ministerele vor depune s\u0103pt\u0103m\u00e2na viitoare \u00een Parlament proiecte de lege esen\u021biale pentru deblocarea a peste 7,5 miliarde de euro<\/p>\n<p>Proiectele care nu pot fi finalizate la timp urmeaz\u0103 s\u0103 fie transferate pe componenta de \u00eemprumut. \u00cen acest caz, Rom\u00e2nia pierde doar suma aferent\u0103 lucr\u0103rilor nerealizate, diferen\u021ba urm\u00e2nd s\u0103 fie acoperit\u0103 din bugetul na\u021bional sau local. Premierul a cerut ca, pentru toate lucr\u0103rile cu risc de nefinalizare, s\u0103 fie \u00eentocmite note de constatare de c\u0103tre supervizori sau dirigin\u021bi de \u0219antier. Constructorii trebuie s\u0103 prezinte angajamente ferme cu grafice de lucr\u0103ri care s\u0103 garanteze finalizarea p\u00e2n\u0103 la 31 august. Termenul pentru aceast\u0103 procedur\u0103 este primele trei zile ale s\u0103pt\u0103m\u00e2nii viitoare.<\/p>\n<p>Un alt punct sensibil al negocierilor cu Bruxellesul vizeaz\u0103 jaloanele asumate \u0219i ne\u00eendeplinite. Bolojan a dat exemplul vitezei pe calea ferat\u0103. Angajamentul de reducere a \u00eent\u00e2rzierilor nu a fost \u00eendeplinit. Motivele: lucr\u0103ri nefinalizate \u0219i lips\u0103 de locomotive noi. Guvernul negociaz\u0103 cu Comisia European\u0103 cobor\u00e2rea acestor standarde pentru a nu bloca absorb\u021bia.<\/p>\n<p>Bolojan a anun\u021bat c\u0103 toate ministerele vor depune s\u0103pt\u0103m\u00e2na viitoare \u00een Parlament proiecte de lege esen\u021biale pentru deblocarea a peste 7,5 miliarde de euro. Guvernul nu mai are competen\u021ba legal\u0103 de a adopta ordonan\u021be, astfel c\u0103 procedura parlamentar\u0103 devine singura cale. Premierul a apelat la partidele politice s\u0103 sus\u021bin\u0103 adoptarea acestor legi p\u00e2n\u0103 la sf\u00e2r\u0219itul lunii iunie, pentru ca tragerile din fonduri s\u0103 poat\u0103 fi f\u0103cute \u00een iulie-august. Bolojan a reamintit c\u0103 Rom\u00e2nia are \u00een 2026 cel mai mare buget de investi\u021bii, reprezent\u00e2nd 8% din PIB &#8211; fonduri europene \u0219i na\u021bionale combinate.\n<\/p><\/div>\n<p>[analyse_source url=&#8221;https:\/\/observatornews.ro\/politic\/bolojan-suna-mobilizarea-generala-nu-ne-permitem-sa-pierdem-bani-655418.html&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.observatornews.ro\/?u=https%3A%2F%2Fobservatornews.ro%2Fuploads%2Fmodules%2Fnews%2F0%2F2026%2F5%2F23%2F655418%2Filie-bolojan-fd75ee93.jpg&amp;w=1200&amp;h=630&amp;c=1&#8243;] To\u021bi primarii din \u021bar\u0103 au fost convoca\u021bi luni diminea\u021b\u0103 pentru un inventar de urgen\u021b\u0103 al proiectelor PNRR. Bolojan a explicat c\u0103 exist\u0103 \u00een derulare peste 15.000 de proiecte \u00een administra\u021biile publice din Rom\u00e2nia. Cele care pot fi terminate p\u00e2n\u0103 la 31 august trebuie s\u0103 r\u0103m\u00e2n\u0103 pe componenta de grant. Un proiect finalizat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[226,30],"class_list":["post-1953250","post","type-post","status-publish","format-standard","hentry","category-politics","tag-crawlmanager","tag-observatornews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1953250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1953250"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1953250\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1953250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1953250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1953250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}