{"id":1948162,"date":"2026-05-21T16:44:00","date_gmt":"2026-05-21T13:44:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1948162"},"modified":"2026-05-21T16:44:00","modified_gmt":"2026-05-21T13:44:00","slug":"proiect-major-deblocat-la-vadu-pasii-se-reiau-lucrarile-de-amenajare-a-retelei-de-gaze","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1948162","title":{"rendered":"Proiect major deblocat, la Vadu Pa\u0219ii. Se reiau lucr\u0103rile de amenajare a re\u021belei de gaze"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/gaze-vadu-pasii.jpghttps:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/gaze-vadu-pasii.jpg&#8221;]<\/p>\n<div class=\"entry-content\">\n<p><strong><em><mark class=\"has-inline-color has-maincolor-color\">Ve\u0219ti bune pentru locuitorii comunei Vadu Pa\u0219ii. Aflate \u00een impas din cauza lipsei fondurilor, lucr\u0103rile de amenajare a re\u021belei de gaze naturale din comun\u0103 vor fi reluate \u00een cur\u00e2nd.<\/mark><\/em><\/strong><\/p>\n<p>Primarul Gheorghe Firon anun\u021b\u0103 c\u0103 a fost efectuat\u0103 o nou\u0103 tran\u0219\u0103 de pl\u0103\u021bi c\u0103tre firma care execut\u0103 lucr\u0103rile, iar zilele trecute, Consiliul Local al comunei a aprobat contractarea unui credit necesar pentru finalizarea proiectului.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"860\" height=\"498\" src=\"https:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/FIRON.jpg\" alt class=\"wp-image-154077\"><\/figure>\n<p>Demarate \u00een urm\u0103 cu doi ani, lucr\u0103rile de extindere a re\u021belei de gaze naturale \u00een comuna Vadu Pa\u0219ii s-ar putea \u00eencheia \u00een toamna acestui an. Proiectul este derulat prin Programul Na\u021bional \u201eAnghel Saligny\u201d. Ini\u021bial, Ministerul Dezvolt\u0103rii a alocat aproximativ 13 milioane de euro pentru aceast\u0103 investi\u021bie, \u00eens\u0103 valoarea total\u0103 a proiectului a crescut considerabil pe parcurs.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"507\" src=\"https:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/gura-calnau.jpg\" alt class=\"wp-image-154075\"><\/figure>\n<p>Tot prin Programul Na\u021bional \u201eAnghel Saligny\u201d se desf\u0103\u0219oar\u0103 \u0219i proiectul de amenajare a re\u021belei de canalizare din comun\u0103. \u00cen prezent, lucr\u0103rile se afl\u0103 la un stadiu de execu\u021bie de aproximativ 40%. Gheorghe Firon, primarul comunei Vadu Pa\u0219ii, precizeaz\u0103 c\u0103 proiectul este structurat \u00een patru etape. <\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"508\" src=\"https:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/primaria-vadu-pasii.jpg\" alt class=\"wp-image-154076\"><\/figure>\n<p>Cele dou\u0103 mari investi\u021bii \u2013 extinderea re\u021belei de gaze naturale \u0219i realizarea re\u021belei de canalizare \u2013 vor cre\u0219te semnificativ confortul locuitorilor \u0219i vor contribui la majorarea valorii imobiliare a zonei, mai ales \u00een contextul apropierii de noua autostrad\u0103 A7, care leag\u0103 Muntenia de Moldova.<\/p>\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\">\n<div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"PROIECT MAJOR DEBLOCAT, LA VADU PA\u015eII\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/xwaoF3NJkOQ?feature=oembed\" frameborder allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div>\n<\/figure>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.campusbuzau.ro\/proiect-major-deblocat-se-reiau-lucrarile-de-amenajare-a-retelei-de-gaze-la-vadu-pasii\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/gaze-vadu-pasii.jpghttps:\/\/www.campusbuzau.ro\/wp-content\/uploads\/2026\/05\/gaze-vadu-pasii.jpg&#8221;] Ve\u0219ti bune pentru locuitorii comunei Vadu Pa\u0219ii. Aflate \u00een impas din cauza lipsei fondurilor, lucr\u0103rile de amenajare a re\u021belei de gaze naturale din comun\u0103 vor fi reluate \u00een cur\u00e2nd. Primarul Gheorghe Firon anun\u021b\u0103 c\u0103 a fost efectuat\u0103 o nou\u0103 tran\u0219\u0103 de pl\u0103\u021bi c\u0103tre firma care execut\u0103 lucr\u0103rile, iar zilele trecute, Consiliul Local [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[118,226],"class_list":["post-1948162","post","type-post","status-publish","format-standard","hentry","category-politics","tag-campusbuzau-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1948162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1948162"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1948162\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1948162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1948162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1948162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}