{"id":1942605,"date":"2026-05-18T21:07:00","date_gmt":"2026-05-18T18:07:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1942605"},"modified":"2026-05-18T21:07:00","modified_gmt":"2026-05-18T18:07:00","slug":"debut-de-an-foarte-modest-pentru-proiectele-noi-din-energie-instalarile-sub-inchiderile-din-termo-noroc","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1942605","title":{"rendered":"Debut de an foarte modest pentru proiectele noi din energie. Instal\u0103rile, sub \u00eenchiderile din termo. Noroc"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23154234\/1\/6-eoliene-si-solare-123rf.jpghttps:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23154234\/1\/6-eoliene-si-solare-123rf.jpg&#8221;]<\/p>\n<div class=\"articleIntro mainP text-content\">\n<p>Primul trimestru al anului a adus o u\u015foar\u0103 sc\u0103dere a puterii instalate \u00een sistemul energetic local. De\u015fi cifra nu este mare, un minus de numai 32 MW, ea arat\u0103 c\u0103 \u00een perioada analizat\u0103 \u00eenchiderile din termo au devansat instal\u0103rile din solare, \u00een timp ce restul tehnologiilor pur \u015fi simplu au b\u0103tut pasul pe loc. Odat\u0103 cu oprirea temporar\u0103 total\u0103 a centralei de la Cernavod\u0103 \u015fi cu acest ritm anemic de puneri \u00een func\u0163iune, devine \u00eenc\u0103 o dat\u0103 foarte clar\u0103 nevoia de investi\u0163ii \u00een sistemul energetic local.<\/p>\n<p>Datale Transelectrica privind puterea instalat\u0103 \u00een produc\u0163ia de energie din primul trimestru al anului dau pu\u0163ine motive de bucurie mai ales \u00een actualul context de pia\u0163\u0103. Astfel, din produc\u0163ia de c\u0103rbuni au mai disp\u0103rut 285 MW, doar \u00een zona de parcuri solare fiind instala\u0163i 245 MW. Restul surselor de energie au b\u0103tut pasul pe loc fa\u0163\u0103 de prima zi a anului. Pe zona de prosumatori, au fost monta\u0163i 162 MW, o sc\u0103dere de ritm fa\u0163\u0103 de anii anteriori, iar pe stocare s-au finalizat numai 105 MW de capacitate.<\/p>\n<p>A\u015ftept\u0103rile privind punerile \u00een func\u0163iune pentru 2026 sunt foarte mari, iar dincolo de energia verde, proiecte majore din surse conven\u0163ionale, cum este cazul centralei Mintia, sunt a\u015fteptate s\u0103 fie cuplate la sistemul energetic na\u0163ional.<\/p>\n<div>\n<div><span>Te-ar putea interesa \u0219i:<\/span><\/div>\n<\/div>\n<p>P\u00e2n\u0103 atunci \u00eens\u0103, sistemul energetic trece printr-o perioad\u0103 extrem de delicat\u0103 cauzat\u0103 de oprirea temporar\u0103 a celor dou\u0103 reactoare de la Cernavod\u0103.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.zf.ro\/companii\/energie\/debut-de-an-foarte-modest-pentru-proiectele-noi-din-energie-23154234&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23154234\/1\/6-eoliene-si-solare-123rf.jpghttps:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23154234\/1\/6-eoliene-si-solare-123rf.jpg&#8221;] Primul trimestru al anului a adus o u\u015foar\u0103 sc\u0103dere a puterii instalate \u00een sistemul energetic local. De\u015fi cifra nu este mare, un minus de numai 32 MW, ea arat\u0103 c\u0103 \u00een perioada analizat\u0103 \u00eenchiderile din termo au devansat instal\u0103rile din solare, \u00een timp ce restul tehnologiilor pur \u015fi simplu au b\u0103tut pasul [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,28],"class_list":["post-1942605","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-zf-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1942605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1942605"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1942605\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1942605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1942605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1942605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}