{"id":1935080,"date":"2026-05-14T13:32:09","date_gmt":"2026-05-14T10:32:09","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1935080"},"modified":"2026-05-14T13:32:09","modified_gmt":"2026-05-14T10:32:09","slug":"avanseaza-demolarea-podului-muncii-din-timisoara-circulatia-in-zona-reorganizata-temporar-foto","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1935080","title":{"rendered":"Avanseaz\u0103 demolarea Podului Muncii din Timi\u0219oara! Circula\u021bia \u00een zon\u0103, reorganizat\u0103 temporar FOTO"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-2-e1778767830573.jpg&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Au avansat lucr\u0103rile de demolare a Podului Muncii din Timi\u0219oara. Dup\u0103 demontarea tablierului central peste Bega \u0219i a celui dinspre Splaiul Nicolae Titulescu, investi\u021bia Prim\u0103riei Timi\u0219oara continu\u0103 cu interven\u021biile la tablierul dinspre Splaiul Tudor Vladimirescu.<\/p>\n<p><em>\u201eObiectivul este clar: s\u0103 avans\u0103m c\u00e2t mai rapid pentru ca timi\u0219orenii s\u0103 poat\u0103 traversa din nou Bega pe un pod mai sigur, cu c\u00e2te dou\u0103 benzi pe sens, cu piste pentru biciclete \u0219i mai mult spa\u021biu pentru pietoni. Avans\u0103m \u00een etape care vin temporar cu reorganiz\u0103ri de trafic, necesare pentru ca executantul s\u0103 men\u021bin\u0103 ritmul lucr\u0103rilor. Este o leg\u0103tur\u0103 rutier\u0103 important\u0103 \u0219i m\u0103 a\u0219tept la o mobilizare constant\u0103 din partea constructorului<\/em>\u201d, a declarat viceprimarul Ruben La\u021bc\u0103u.<\/p>\n<p>Pentru execu\u021bia lucr\u0103rilor, \u00eencep\u00e2nd de luni, 18 mai, circula\u021bia \u00een zon\u0103 va fi reorganizat\u0103 temporar astfel \u00eenc\u00e2t s\u0103 fie men\u021binut accesul \u0219i preluate fluxurile de trafic deviate de \u0219antier. Astfel, traficul pe bulevardul Regele Carol I va fi organizat provizoriu \u00een dublu sens. Totodat\u0103, la intersec\u021bia bulevardului Dragalina cu Regele Carol I se modific\u0103 prioritatea de circula\u021bie \u0219i va fi montat indicatorul \u201cCedeaz\u0103 trecerea\u201d. \u00cen plus, de pe strada Preyer se va putea circula at\u00e2t la dreapta spre strada Iuliu Maniu, c\u00e2t \u0219i \u00eenainte spre strada Regele Carol I.<\/p>\n<p><em>\u201ePodul Iuliu Maniu (Muncii) este \u00eenchis pentru reabilitare, cu fonduri europene atrase de Prim\u0103ria Timi\u0219oara \u0219i cu finan\u021bare de bugetul local. Investi\u021bia include consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii cu o structur\u0103 mixt\u0103 o\u021bel-beton, cu p\u0103strarea a c\u00e2te dou\u0103 benzi pe sens. Proiectul include \u0219i reabilitarea rampelor, refacerea sc\u0103rilor, consolidarea malului Canalului Bega \u0219i plantarea de arbori. Pentru pietoni, trotuarele vor fi l\u0103rgite p\u00e2n\u0103 la 1,75 metri, pentru bicicli\u0219ti vor fi amenajate piste, iar noua structur\u0103 va permite reintroducerea circula\u021biei troleibuzelor pe pod<\/em>\u201d, a informat Prim\u0103ria Timi\u0219oara.<\/p>\n<p>Valoarea total\u0103 a proiectului este de aproape 10 milioane de euro, din care aproximativ 7,4 milioane de euro reprezint\u0103 fonduri europene nerambursabile, prin Programul Regional Vest 2021 \u2013 2027.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-184704 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-1-e1778767805494.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-1-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-1-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-3-e1778767788548.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/avanseaza-lucrarile-de-reabilitare-a-podului-muncii-din-timisoara-circulatia-in-zona-reorganizata-temporar-foto\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/05\/Muncii-2-e1778767830573.jpg&#8221;] Au avansat lucr\u0103rile de demolare a Podului Muncii din Timi\u0219oara. Dup\u0103 demontarea tablierului central peste Bega \u0219i a celui dinspre Splaiul Nicolae Titulescu, investi\u021bia Prim\u0103riei Timi\u0219oara continu\u0103 cu interven\u021biile la tablierul dinspre Splaiul Tudor Vladimirescu. \u201eObiectivul este clar: s\u0103 avans\u0103m c\u00e2t mai rapid pentru ca timi\u0219orenii s\u0103 poat\u0103 traversa din nou Bega [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-1935080","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1935080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1935080"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1935080\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1935080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1935080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1935080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}