{"id":1922738,"date":"2026-05-05T21:00:00","date_gmt":"2026-05-05T18:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1922738"},"modified":"2026-05-05T21:00:00","modified_gmt":"2026-05-05T18:00:00","slug":"compania-nationala-de-investitii-rutiere-preia-cinci-proiecte-noi-de-infrastructura-rutiera","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1922738","title":{"rendered":"Compania Na\u021bional\u0103 de Investi\u021bii Rutiere preia cinci proiecte noi de infrastructur\u0103 rutier\u0103"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/05\/Compania-Nationala.jpg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_123 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_123\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p>Compania Na\u021bional\u0103 de Investi\u021bii Rutiere (CNIR) preia patru proiecte de drumuri de mare vitez\u0103 \u0219i noul pod peste Dun\u0103re de la Giurgiu-Ruse, proiecte majore ce \u00eensumeaz\u0103 aproximativ 300 de kilometri de autostrad\u0103 \u0219i drumuri expres. Potrivit unui comunicat al CNIR, transferul acestor obiective strategice este \u00een corelare cu prevederile OUG 55\/2016 \u0219i, \u00een acela\u0219i timp, necesar pentru accelerarea \u0219i finalizarea licita\u021biilor, corelarea cu proiectele deja \u00een implementare la CNIR \u0219i devansarea termenelor pentru \u00eenceperea lucr\u0103rilor. Proiectele preluate sunt: autostrada Bucure\u0219ti \u2013 Alexandria, noul pod peste Dun\u0103re Giurgiu-Ruse 2, Drumul Expres Arad \u2013 Oradea, autostrada F\u0103g\u0103ra\u0219 \u2013 Bra\u0219ov \u0219i Alternativa Techirghiol.<\/p>\n<p>\u00cen cazul autostr\u0103zii Bucure\u0219ti \u2013 Alexandria, preluarea va impulsiona proiectul at\u00e2t de necesar pentru reducerea accidentelor \u0219i a aglomera\u021biei de pe DN 6, un alt \u2018drum al mor\u021bii\u2019, c\u00e2t \u0219i pentru corelarea A6 cu Drumul de mare vitez\u0103 Bucure\u0219ti \u2013 Giurgiu, acum \u00een etapa realiz\u0103rii studiului de fezabilitate la CNIR. Sunt obiective care vor deservi un bazin semnificativ de popula\u021bie, inclusiv transporturile de marf\u0103 \u0219i vor aduce noi investi\u021bii \u00een sudul \u021b\u0103rii, subliniaz\u0103 reprezentan\u021bii CNIR.<\/p>\n<p>\u00cen ceea ce prive\u0219te noul pod peste Dun\u0103re Giurgiu-Ruse 2, CNIR subliniaz\u0103 c\u0103 este nevoie de un pod modern, la standarde europene, pe principala rut\u0103 de transport \u00eentre Rom\u00e2nia \u0219i Bulgaria \u0219i una dintre cele mai aglomerate \u00een sezonul estival, o conexiune strategic\u0103 \u00eentre Bucure\u0219ti, Sofia \u0219i Atena, capitale europene \u00eenc\u0103 nelegate prin drumuri de mare vitez\u0103. \u0218i acest obiectiv va fi derulat \u00een deplin\u0103 sincronizare cu viitoarele autostr\u0103zi Bucure\u0219ti-Giurgiu \u0219i Bucure\u0219ti-Alexandria, iar pentru etapa de execu\u021bie se poate avea \u00een vedere \u0219i o analiz\u0103 a finan\u021b\u0103rii prin parteneriat public-privat.<\/p>\n<p>\u2018Drumul Expres Arad \u2013 Oradea este un proiect strategic, parte a coridorului de transport Via Carpathia care ne-a dovedit implicarea \u0219i contribu\u021bia esen\u021bial\u0103 a autorit\u0103\u021bilor locale \u00een preg\u0103tirea solid\u0103 a investi\u021biei, iar obiectivul pe care \u00eel dorim este s\u0103 reu\u0219im \u00eenceperea lucr\u0103rilor \u00eenc\u0103 din acest an. Vom avea nu doar o leg\u0103tur\u0103 modern\u0103 \u00eentre cele dou\u0103 municipii sau \u00eentre Autostr\u0103zile A1 \u0219i A3, ci una \u00eentre nordul \u0219i sudul Europei, de la Marea Baltic\u0103 la Marea Neagr\u0103 \u0219i Mediteran\u0103. Pentru Autostrada F\u0103g\u0103ra\u0219 \u2013 Bra\u0219ov, segment al A13, vom asigura finalizarea rapid\u0103 a documenta\u021biei, baze solide \u0219i costuri justificate \u00een etapa de execu\u021bie, precum \u0219i realizarea efectului de coridor, dar \u0219i corelarea cu alte obiective de infrastructur\u0103 major\u0103 din zona Bra\u0219ovului, respectiv perspectivele de dezvoltare spre Ploie\u0219ti \u0219i Bac\u0103u\u2019, se arat\u0103 \u00een comunicat.<\/p>\n<p>Portul Constan\u021ba \u0219i sta\u021biunile de pe litoral sunt componente importante care sus\u021bin economia na\u021bional\u0103. Prin realizarea \u2018Autostr\u0103zii Litoralului\u2019 (Alternativa Techirghiol) se va asigura o infrastructur\u0103 modern\u0103, pentru timp redus de deplasare, siguran\u021b\u0103 \u00een trafic \u0219i \u00eencurajarea unor noi investi\u021bii. \u2018Transferul acestor cinci proiecte majore de infrastructur\u0103 rutier\u0103 este un pas important pentru accelerarea implement\u0103rii lor, \u00eembun\u0103t\u0103\u021birea controlului costurilor \u0219i asigurarea unei strategii integrate de dezvoltare\u2019, subliniaz\u0103 CNIR.<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.monitoruldevrancea.ro\/2026\/05\/06\/compania-nationala-de-investitii-rutiere-preia-cinci-proiecte-noi-de-infrastructura-rutiera\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/05\/Compania-Nationala.jpg&#8221;] Compania Na\u021bional\u0103 de Investi\u021bii Rutiere (CNIR) preia patru proiecte de drumuri de mare vitez\u0103 \u0219i noul pod peste Dun\u0103re de la Giurgiu-Ruse, proiecte majore ce \u00eensumeaz\u0103 aproximativ 300 de kilometri de autostrad\u0103 \u0219i drumuri expres. Potrivit unui comunicat al CNIR, transferul acestor obiective strategice este \u00een corelare cu prevederile OUG 55\/2016 \u0219i, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,209],"class_list":["post-1922738","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-monitoruldevrancea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1922738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1922738"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1922738\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1922738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1922738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1922738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}