{"id":1913908,"date":"2026-05-01T08:47:17","date_gmt":"2026-05-01T05:47:17","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1913908"},"modified":"2026-05-01T08:47:17","modified_gmt":"2026-05-01T05:47:17","slug":"administratia-din-pausesti-maglasi-intre-asfalt-gaze-lucrari-in-teren-si-planuri-multe-cu-un-buget-care-nu-tine-pasul","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1913908","title":{"rendered":"Administra\u021bia din P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, \u00eentre asfalt, gaze, lucr\u0103ri \u00een teren \u0219i planuri multe, cu un buget care nu \u021bine pasul"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-011.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2040\" height=\"1530\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-011.jpg\" class=\"img-responsive wp-post-image\" alt=\"Administra\u021bia din P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, \u00eentre asfalt, gaze, lucr\u0103ri \u00een teren \u0219i planuri multe, cu un buget care nu \u021bine pasul\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/05\/01\/administratia-din-pausesti-maglasi-intre-asfalt-gaze-lucrari-in-teren-si-planuri-multe-cu-un-buget-care-nu-tine-pasul\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2026-05-01T11:47:17+03:00\">1 mai 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/stiri-pausesti-maglasi-un-loc-unde-traditiile-si-obiceiurile-sunt-inca-pastrate-si-respectate\/\" rel=\"category tag\">Pausesti Maglasi<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Primarul Marcel Radi a verificat stadiul lucr\u0103rilor aflate \u00een derulare pe drumurile din comun\u0103, analiz\u00e2nd interven\u021biile realizate p\u00e2n\u0103 acum \u0219i modul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile \u00een teren. Concluzia: ritmul exist\u0103, utilajele sunt prezente, dar totul depinde de banii care vin de la centru.<\/p>\n<p>Prin Programul Na\u021bional de Investi\u021bii Anghel Saligny se lucreaz\u0103 simultan la asfaltare \u0219i la introducerea re\u021belei de gaze. Stadiul este diferit de la o lucrare la alta: drumurile sunt realizate \u00een propor\u021bie de aproximativ 30%, iar re\u021beaua de gaze a ajuns la 20%. Lucr\u0103rile continu\u0103 \u00een func\u021bie de aloc\u0103rile primite, ceea ce \u00eenseamn\u0103 c\u0103 fiecare etap\u0103 depinde strict de finan\u021bare.<\/p>\n<p>Un exemplu \u00a0este strada Valea Viei, o zon\u0103 care a fost recent introdus\u0103 \u00een intravilan \u0219i care \u00eencepe s\u0103 se transforme. Pe o lungime de 1.300 de metri a fost deja introdus\u0103 conducta de gaze, iar \u00een zona unde sunt gospod\u0103rii s-au asfaltat aproximativ 400 de metri. Restul tronsonului este preg\u0103tit pentru asfaltare, lucr\u0103rile fiind corelate cu introducerea utilit\u0103\u021bilor.<\/p>\n<p><strong><u>Primarul Marcel Radi a explicat situa\u021bia<\/u><\/strong>: \u201e<strong><em>Pe strada Valea Viei avem 1.300 de metri care au fost introdu\u0219i \u00een intravilan. Acolo am introdus deja conducta de gaze pe toat\u0103 lungimea, am asfaltat unde sunt gospod\u0103rii, aproximativ 400 de metri, \u0219i urmeaz\u0103 \u0219i restul. Toat\u0103 strada este preg\u0103tit\u0103 pentru asfaltare. Urmeaz\u0103 extinderea re\u021belei de energie electric\u0103, pentru c\u0103 zona este acum intravilan \u0219i trebuie s\u0103 asigur\u0103m toate utilit\u0103\u021bile<\/em><\/strong>.\u201d<\/p>\n<p>Lucrurile nu sunt simple, mai ales c\u00e2nd vine vorba de partea financiar\u0103. Pentru extinderea re\u021belei electrice exist\u0103 deja aprobarea de la CEZ, dar contribu\u021bia local\u0103 ridic\u0103 probleme serioase: \u201e<strong><em>Avem adres\u0103 de la CEZ prin care ni se aprob\u0103 cererea, dar este trecut\u0103 \u0219i partea noastr\u0103 de finan\u021bare, care este de 600.000 de lei. Ace\u0219ti bani nu \u00eei avem. Valoarea total\u0103 a lucr\u0103rii este de 1.200.000 de lei. \u00cen prim\u0103 faz\u0103 trebuie s\u0103 pl\u0103tim studiul de fezabilitate, aproximativ 15.000 de lei, \u0219i \u00eel vom face s\u0103pt\u0103m\u00e2na viitoare. Costul este mare pentru c\u0103 pe traseu trebuie montat un transformator, care va fi pus pe proprietatea unui cet\u0103\u021bean, cu acord notarial. Nu am avut alt\u0103 solu\u021bie. Toat\u0103 instala\u021bia va fi subteran\u0103<\/em><\/strong>.\u201d \u00cen \u00a0zon\u0103 urmeaz\u0103 introducerea sistemului de alimentare cu ap\u0103, investi\u021bie aflat\u0103 pe lista primarului Marcel Radi \u0219i finan\u021bat\u0103 din bugetul local.<\/p>\n<p><strong><u>Bugetul nu \u021bine pasul cu lista de investi\u021bii<\/u><\/strong><\/p>\n<p>Situa\u021bia bugetului pe acest an nu se potrive\u0219te cu lista de investi\u021bii pe care primarul Marcel Radi o are pe birou, o list\u0103 lung\u0103, trecut\u0103 \u00een agenda sa, despre care spune c\u0103 nu poate renun\u021ba la nimic. Din bugetul actual, cheltuielile de func\u021bionare sunt acoperite, \u00eens\u0103 la investi\u021bii apar probleme serioase. Nu sunt bani suficien\u021bi pentru toate proiectele, ceea ce \u00eenseamn\u0103 c\u0103 multe dintre ele nu pot fi realizate:<\/p>\n<p>\u201e<strong><em>Pentru cheltuielile de func\u021bionare reu\u0219im s\u0103 ne descurc\u0103m, dar la investi\u021bii avem probleme. Nu reu\u0219im s\u0103 acoperim tot ce ne-am propus. Am o list\u0103 a necesit\u0103\u021bilor \u0219i nu \u0219tiu cum le voi rezolva pe toate, pentru c\u0103 bugetul nu permite<\/em><\/strong>.\u201d<\/p>\n<p>\u00cen aceste condi\u021bii, administra\u021bia local\u0103 caut\u0103 sprijin acolo unde este posibil. Un rol important \u00eel are Consiliul Jude\u021bean, care a intervenit \u0219i \u00een anii trecu\u021bi: \u201e<strong><em>Singura speran\u021b\u0103 este parteneriatul cu Consiliul Jude\u021bean. Ne-au ajutat de fiecare dat\u0103. Anul trecut am primit bani pentru baza sportiv\u0103 \u0219i pentru extinderea re\u021belei electrice \u00eentr-o alt\u0103 zon\u0103. Am convingerea c\u0103 ne vor sprijini \u0219i acum pentru amenajarea vestiarelor de la baza sportiv\u0103<\/em><\/strong>.\u201d<\/p>\n<p>Baza sportiv\u0103 este una dintre investi\u021biile care aduc deja rezultate. Condi\u021biile bune atrag echipe din \u021bar\u0103, care vin \u00een cantonament, ceea ce aduce venituri la bugetul local. Pentru a men\u021bine acest nivel, sunt necesare investi\u021bii noi, inclusiv montarea unor vestiare moderne, realizate din containere racordate la utilit\u0103\u021bi. \u00cen paralel, \u00een zona bazei sportive este preg\u0103tit un proiect pentru un parc fotovoltaic de 300 kW, finan\u021bat din fonduri europene.<\/p>\n<p><strong><u>Lista de investi\u021bii dep\u0103\u0219e\u0219te posibilit\u0103\u021bile bugetului<\/u><\/strong><\/p>\n<p>Lista investi\u021biilor pentru acest an este lung\u0103 \u0219i acoper\u0103 nevoi din mai multe zone ale localit\u0103\u021bii. Din bugetul local este prev\u0103zut un pod \u00een satul Valea Cheii, cu o lungime de 18 metri \u0219i o valoare de 1.200.000 de lei. \u00cen satul Coasta este programat\u0103 o extindere a re\u021belei de ap\u0103 pe 300 de metri, estimat\u0103 la 300.000 de lei. Este necesar\u0103 \u0219i reabilitarea remizei PSI, unde trebuie ob\u021binute documente \u0219i avize.<\/p>\n<p>Pe l\u00e2ng\u0103 acestea, sunt \u00een plan extinderi de re\u021bele electrice \u0219i de ap\u0103 \u00een Valea Viei, dar \u0219i o problem\u0103 major\u0103 legat\u0103 de canalizare. Proiectul, \u00een valoare de 18 milioane de euro, nu poate \u00eencepe f\u0103r\u0103 asigurarea cofinan\u021b\u0103rii: \u201d <strong><em>Pentru canalizare avem nevoie de aproximativ 400.000 de euro pentru cofinan\u021bare. Dac\u0103 nu facem dovada c\u0103 avem ace\u0219ti bani, proiectul nu porne\u0219te. Este un proiect mare, care se va derula prin Apavil, dar f\u0103r\u0103 contribu\u021bia noastr\u0103 nu se poate face nimic<\/em><\/strong>.\u201d<\/p>\n<p>Pe lista de investi\u021bii apare \u0219i extinderea re\u021belei de ap\u0103 \u00een zona Lacul Popii, unde costul este de aproximativ 1.300.000 de lei. Este o lucrare necesar\u0103, dar care nu poate fi realizat\u0103 anul acesta din lips\u0103 de fonduri.<\/p>\n<p>\u00cen paralel, administra\u021bia lucreaz\u0103 la documenta\u021bii pentru aproximativ 13 kilometri de drumuri comunale care nu sunt asfaltate. Scopul este ca proiectele s\u0103 fie gata pentru a fi depuse imediat ce apar noi linii de finan\u021bare. Pentru aceast\u0103 etap\u0103 sunt necesari bani pentru proiectare<\/p>\n<p>Printre planurile acestui an se reg\u0103sesc \u0219i reabilitarea sediului po\u0219tei din centrul localit\u0103\u021bii, precum \u0219i amenajarea unui loc de joac\u0103 \u00eentre centrul de zi \u0219i gr\u0103dini\u021b\u0103. Ziua localit\u0103\u021bii r\u0103m\u00e2ne \u00een discu\u021bie, cu inten\u021bia de a fi organizat\u0103 cu cheltuieli reduse.<\/p>\n<p><strong><u>Parcul auto se doteaz\u0103 cu utilaje noi<\/u><\/strong><\/p>\n<p>Un sprijin important vine din fonduri europene prin GAL, unde parcul auto al prim\u0103riei va fi modernizat. Este prev\u0103zut\u0103 achizi\u021bia unui tractor de aproximativ 70.000 de euro, cu remorc\u0103 \u0219i echipamente pentru desz\u0103pezire, o cistern\u0103 tip vidanj\u0103 dotat\u0103 pentru stingerea incendiilor \u0219i utilaje pentru \u00eentre\u021binerea spa\u021biilor verzi.<\/p>\n<p><em><u>A\u0219adar, la P\u0103u\u0219e\u0219ti M\u0103gla\u0219i se lucreaz\u0103, exist\u0103 direc\u021bie \u0219i proiecte, dar fiecare metru de asfalt \u0219i fiecare re\u021bea depind de banii care vin greu \u0219i insuficient de la centru<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-56575\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0000-radi-300x225.jpg\" alt width=\"300\" height=\"225\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-56576\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0pp-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56577\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-01-300x225.jpg\" alt width=\"300\" height=\"225\"> \u00a0<img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56579\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-01kk-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56580\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-444-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56581\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-MM-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56582\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0133-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56583\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0123-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Primarul Marcel Radi a verificat stadiul lucr\u0103rilor aflate \u00een derulare pe drumurile din comun\u0103, analiz\u00e2nd interven\u021biile realizate p\u00e2n\u0103 acum \u0219i modul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile \u00een teren. Concluzia: ritmul exist\u0103, utilajele sunt prezente, dar totul depinde de banii care vin de la centru.<\/p>\n<p>Prin Programul Na\u021bional de Investi\u021bii Anghel Saligny se lucreaz\u0103 simultan la asfaltare \u0219i la introducerea re\u021belei de gaze. Stadiul este diferit de la o lucrare la alta: drumurile sunt realizate \u00een propor\u021bie de aproximativ 30%, iar re\u021beaua de gaze a ajuns la 20%. Lucr\u0103rile continu\u0103 \u00een func\u021bie de aloc\u0103rile primite, ceea ce \u00eenseamn\u0103 c\u0103 fiecare etap\u0103 depinde strict de finan\u021bare.<\/p>\n<p>Un exemplu \u00a0este strada Valea Viei, o zon\u0103 care a fost recent introdus\u0103 \u00een intravilan \u0219i care \u00eencepe s\u0103 se transforme. Pe o lungime de 1.300 de metri a fost deja introdus\u0103 conducta de gaze, iar \u00een zona unde sunt gospod\u0103rii s-au asfaltat aproximativ 400 de metri. Restul tronsonului este preg\u0103tit pentru asfaltare, lucr\u0103rile fiind corelate cu introducerea utilit\u0103\u021bilor.<\/p>\n<p><strong><u>Primarul Marcel Radi a explicat situa\u021bia<\/u><\/strong>: \u201e<strong><em>Pe strada Valea Viei avem 1.300 de metri care au fost introdu\u0219i \u00een intravilan. Acolo am introdus deja conducta de gaze pe toat\u0103 lungimea, am asfaltat unde sunt gospod\u0103rii, aproximativ 400 de metri, \u0219i urmeaz\u0103 \u0219i restul. Toat\u0103 strada este preg\u0103tit\u0103 pentru asfaltare. Urmeaz\u0103 extinderea re\u021belei de energie electric\u0103, pentru c\u0103 zona este acum intravilan \u0219i trebuie s\u0103 asigur\u0103m toate utilit\u0103\u021bile<\/em><\/strong>.\u201d<\/p>\n<p>Lucrurile nu sunt simple, mai ales c\u00e2nd vine vorba de partea financiar\u0103. Pentru extinderea re\u021belei electrice exist\u0103 deja aprobarea de la CEZ, dar contribu\u021bia local\u0103 ridic\u0103 probleme serioase: \u201e<strong><em>Avem adres\u0103 de la CEZ prin care ni se aprob\u0103 cererea, dar este trecut\u0103 \u0219i partea noastr\u0103 de finan\u021bare, care este de 600.000 de lei. Ace\u0219ti bani nu \u00eei avem. Valoarea total\u0103 a lucr\u0103rii este de 1.200.000 de lei. \u00cen prim\u0103 faz\u0103 trebuie s\u0103 pl\u0103tim studiul de fezabilitate, aproximativ 15.000 de lei, \u0219i \u00eel vom face s\u0103pt\u0103m\u00e2na viitoare. Costul este mare pentru c\u0103 pe traseu trebuie montat un transformator, care va fi pus pe proprietatea unui cet\u0103\u021bean, cu acord notarial. Nu am avut alt\u0103 solu\u021bie. Toat\u0103 instala\u021bia va fi subteran\u0103<\/em><\/strong>.\u201d \u00cen \u00a0zon\u0103 urmeaz\u0103 introducerea sistemului de alimentare cu ap\u0103, investi\u021bie aflat\u0103 pe lista primarului Marcel Radi \u0219i finan\u021bat\u0103 din bugetul local.<\/p>\n<p><strong><u>Bugetul nu \u021bine pasul cu lista de investi\u021bii<\/u><\/strong><\/p>\n<p>Situa\u021bia bugetului pe acest an nu se potrive\u0219te cu lista de investi\u021bii pe care primarul Marcel Radi o are pe birou, o list\u0103 lung\u0103, trecut\u0103 \u00een agenda sa, despre care spune c\u0103 nu poate renun\u021ba la nimic. Din bugetul actual, cheltuielile de func\u021bionare sunt acoperite, \u00eens\u0103 la investi\u021bii apar probleme serioase. Nu sunt bani suficien\u021bi pentru toate proiectele, ceea ce \u00eenseamn\u0103 c\u0103 multe dintre ele nu pot fi realizate:<\/p>\n<p>\u201e<strong><em>Pentru cheltuielile de func\u021bionare reu\u0219im s\u0103 ne descurc\u0103m, dar la investi\u021bii avem probleme. Nu reu\u0219im s\u0103 acoperim tot ce ne-am propus. Am o list\u0103 a necesit\u0103\u021bilor \u0219i nu \u0219tiu cum le voi rezolva pe toate, pentru c\u0103 bugetul nu permite<\/em><\/strong>.\u201d<\/p>\n<p>\u00cen aceste condi\u021bii, administra\u021bia local\u0103 caut\u0103 sprijin acolo unde este posibil. Un rol important \u00eel are Consiliul Jude\u021bean, care a intervenit \u0219i \u00een anii trecu\u021bi: \u201e<strong><em>Singura speran\u021b\u0103 este parteneriatul cu Consiliul Jude\u021bean. Ne-au ajutat de fiecare dat\u0103. Anul trecut am primit bani pentru baza sportiv\u0103 \u0219i pentru extinderea re\u021belei electrice \u00eentr-o alt\u0103 zon\u0103. Am convingerea c\u0103 ne vor sprijini \u0219i acum pentru amenajarea vestiarelor de la baza sportiv\u0103<\/em><\/strong>.\u201d<\/p>\n<p>Baza sportiv\u0103 este una dintre investi\u021biile care aduc deja rezultate. Condi\u021biile bune atrag echipe din \u021bar\u0103, care vin \u00een cantonament, ceea ce aduce venituri la bugetul local. Pentru a men\u021bine acest nivel, sunt necesare investi\u021bii noi, inclusiv montarea unor vestiare moderne, realizate din containere racordate la utilit\u0103\u021bi. \u00cen paralel, \u00een zona bazei sportive este preg\u0103tit un proiect pentru un parc fotovoltaic de 300 kW, finan\u021bat din fonduri europene.<\/p>\n<p><strong><u>Lista de investi\u021bii dep\u0103\u0219e\u0219te posibilit\u0103\u021bile bugetului<\/u><\/strong><\/p>\n<p>Lista investi\u021biilor pentru acest an este lung\u0103 \u0219i acoper\u0103 nevoi din mai multe zone ale localit\u0103\u021bii. Din bugetul local este prev\u0103zut un pod \u00een satul Valea Cheii, cu o lungime de 18 metri \u0219i o valoare de 1.200.000 de lei. \u00cen satul Coasta este programat\u0103 o extindere a re\u021belei de ap\u0103 pe 300 de metri, estimat\u0103 la 300.000 de lei. Este necesar\u0103 \u0219i reabilitarea remizei PSI, unde trebuie ob\u021binute documente \u0219i avize.<\/p>\n<p>Pe l\u00e2ng\u0103 acestea, sunt \u00een plan extinderi de re\u021bele electrice \u0219i de ap\u0103 \u00een Valea Viei, dar \u0219i o problem\u0103 major\u0103 legat\u0103 de canalizare. Proiectul, \u00een valoare de 18 milioane de euro, nu poate \u00eencepe f\u0103r\u0103 asigurarea cofinan\u021b\u0103rii: \u201d <strong><em>Pentru canalizare avem nevoie de aproximativ 400.000 de euro pentru cofinan\u021bare. Dac\u0103 nu facem dovada c\u0103 avem ace\u0219ti bani, proiectul nu porne\u0219te. Este un proiect mare, care se va derula prin Apavil, dar f\u0103r\u0103 contribu\u021bia noastr\u0103 nu se poate face nimic<\/em><\/strong>.\u201d<\/p>\n<p>Pe lista de investi\u021bii apare \u0219i extinderea re\u021belei de ap\u0103 \u00een zona Lacul Popii, unde costul este de aproximativ 1.300.000 de lei. Este o lucrare necesar\u0103, dar care nu poate fi realizat\u0103 anul acesta din lips\u0103 de fonduri.<\/p>\n<p>\u00cen paralel, administra\u021bia lucreaz\u0103 la documenta\u021bii pentru aproximativ 13 kilometri de drumuri comunale care nu sunt asfaltate. Scopul este ca proiectele s\u0103 fie gata pentru a fi depuse imediat ce apar noi linii de finan\u021bare. Pentru aceast\u0103 etap\u0103 sunt necesari bani pentru proiectare<\/p>\n<p>Printre planurile acestui an se reg\u0103sesc \u0219i reabilitarea sediului po\u0219tei din centrul localit\u0103\u021bii, precum \u0219i amenajarea unui loc de joac\u0103 \u00eentre centrul de zi \u0219i gr\u0103dini\u021b\u0103. Ziua localit\u0103\u021bii r\u0103m\u00e2ne \u00een discu\u021bie, cu inten\u021bia de a fi organizat\u0103 cu cheltuieli reduse.<\/p>\n<p><strong><u>Parcul auto se doteaz\u0103 cu utilaje noi<\/u><\/strong><\/p>\n<p>Un sprijin important vine din fonduri europene prin GAL, unde parcul auto al prim\u0103riei va fi modernizat. Este prev\u0103zut\u0103 achizi\u021bia unui tractor de aproximativ 70.000 de euro, cu remorc\u0103 \u0219i echipamente pentru desz\u0103pezire, o cistern\u0103 tip vidanj\u0103 dotat\u0103 pentru stingerea incendiilor \u0219i utilaje pentru \u00eentre\u021binerea spa\u021biilor verzi.<\/p>\n<p><em><u>A\u0219adar, la P\u0103u\u0219e\u0219ti M\u0103gla\u0219i se lucreaz\u0103, exist\u0103 direc\u021bie \u0219i proiecte, dar fiecare metru de asfalt \u0219i fiecare re\u021bea depind de banii care vin greu \u0219i insuficient de la centru<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-56575\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0000-radi-300x225.jpg\" alt width=\"300\" height=\"225\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-56576\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0pp-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56577\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-01-300x225.jpg\" alt width=\"300\" height=\"225\"> \u00a0<img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56579\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-01kk-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56580\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-444-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56581\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-MM-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56582\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0133-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56583\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0123-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Primarul Marcel Radi a verificat stadiul lucr\u0103rilor aflate \u00een derulare pe drumurile din comun\u0103, analiz\u00e2nd interven\u021biile realizate p\u00e2n\u0103 acum \u0219i modul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile \u00een teren. Concluzia: ritmul exist\u0103, utilajele sunt prezente, dar totul depinde de banii care vin de la centru.<\/p>\n<p>Prin Programul Na\u021bional de Investi\u021bii Anghel Saligny se lucreaz\u0103 simultan la asfaltare \u0219i la introducerea re\u021belei de gaze. Stadiul este diferit de la o lucrare la alta: drumurile sunt realizate \u00een propor\u021bie de aproximativ 30%, iar re\u021beaua de gaze a ajuns la 20%. Lucr\u0103rile continu\u0103 \u00een func\u021bie de aloc\u0103rile primite, ceea ce \u00eenseamn\u0103 c\u0103 fiecare etap\u0103 depinde strict de finan\u021bare.<\/p>\n<p>Un exemplu \u00a0este strada Valea Viei, o zon\u0103 care a fost recent introdus\u0103 \u00een intravilan \u0219i care \u00eencepe s\u0103 se transforme. Pe o lungime de 1.300 de metri a fost deja introdus\u0103 conducta de gaze, iar \u00een zona unde sunt gospod\u0103rii s-au asfaltat aproximativ 400 de metri. Restul tronsonului este preg\u0103tit pentru asfaltare, lucr\u0103rile fiind corelate cu introducerea utilit\u0103\u021bilor.<\/p>\n<p><strong><u>Primarul Marcel Radi a explicat situa\u021bia<\/u><\/strong>: \u201e<strong><em>Pe strada Valea Viei avem 1.300 de metri care au fost introdu\u0219i \u00een intravilan. Acolo am introdus deja conducta de gaze pe toat\u0103 lungimea, am asfaltat unde sunt gospod\u0103rii, aproximativ 400 de metri, \u0219i urmeaz\u0103 \u0219i restul. Toat\u0103 strada este preg\u0103tit\u0103 pentru asfaltare. Urmeaz\u0103 extinderea re\u021belei de energie electric\u0103, pentru c\u0103 zona este acum intravilan \u0219i trebuie s\u0103 asigur\u0103m toate utilit\u0103\u021bile<\/em><\/strong>.\u201d<\/p>\n<p>Lucrurile nu sunt simple, mai ales c\u00e2nd vine vorba de partea financiar\u0103. Pentru extinderea re\u021belei electrice exist\u0103 deja aprobarea de la CEZ, dar contribu\u021bia local\u0103 ridic\u0103 probleme serioase: \u201e<strong><em>Avem adres\u0103 de la CEZ prin care ni se aprob\u0103 cererea, dar este trecut\u0103 \u0219i partea noastr\u0103 de finan\u021bare, care este de 600.000 de lei. Ace\u0219ti bani nu \u00eei avem. Valoarea total\u0103 a lucr\u0103rii este de 1.200.000 de lei. \u00cen prim\u0103 faz\u0103 trebuie s\u0103 pl\u0103tim studiul de fezabilitate, aproximativ 15.000 de lei, \u0219i \u00eel vom face s\u0103pt\u0103m\u00e2na viitoare. Costul este mare pentru c\u0103 pe traseu trebuie montat un transformator, care va fi pus pe proprietatea unui cet\u0103\u021bean, cu acord notarial. Nu am avut alt\u0103 solu\u021bie. Toat\u0103 instala\u021bia va fi subteran\u0103<\/em><\/strong>.\u201d \u00cen \u00a0zon\u0103 urmeaz\u0103 introducerea sistemului de alimentare cu ap\u0103, investi\u021bie aflat\u0103 pe lista primarului Marcel Radi \u0219i finan\u021bat\u0103 din bugetul local.<\/p>\n<p><strong><u>Bugetul nu \u021bine pasul cu lista de investi\u021bii<\/u><\/strong><\/p>\n<p>Situa\u021bia bugetului pe acest an nu se potrive\u0219te cu lista de investi\u021bii pe care primarul Marcel Radi o are pe birou, o list\u0103 lung\u0103, trecut\u0103 \u00een agenda sa, despre care spune c\u0103 nu poate renun\u021ba la nimic. Din bugetul actual, cheltuielile de func\u021bionare sunt acoperite, \u00eens\u0103 la investi\u021bii apar probleme serioase. Nu sunt bani suficien\u021bi pentru toate proiectele, ceea ce \u00eenseamn\u0103 c\u0103 multe dintre ele nu pot fi realizate:<\/p>\n<p>\u201e<strong><em>Pentru cheltuielile de func\u021bionare reu\u0219im s\u0103 ne descurc\u0103m, dar la investi\u021bii avem probleme. Nu reu\u0219im s\u0103 acoperim tot ce ne-am propus. Am o list\u0103 a necesit\u0103\u021bilor \u0219i nu \u0219tiu cum le voi rezolva pe toate, pentru c\u0103 bugetul nu permite<\/em><\/strong>.\u201d<\/p>\n<p>\u00cen aceste condi\u021bii, administra\u021bia local\u0103 caut\u0103 sprijin acolo unde este posibil. Un rol important \u00eel are Consiliul Jude\u021bean, care a intervenit \u0219i \u00een anii trecu\u021bi: \u201e<strong><em>Singura speran\u021b\u0103 este parteneriatul cu Consiliul Jude\u021bean. Ne-au ajutat de fiecare dat\u0103. Anul trecut am primit bani pentru baza sportiv\u0103 \u0219i pentru extinderea re\u021belei electrice \u00eentr-o alt\u0103 zon\u0103. Am convingerea c\u0103 ne vor sprijini \u0219i acum pentru amenajarea vestiarelor de la baza sportiv\u0103<\/em><\/strong>.\u201d<\/p>\n<p>Baza sportiv\u0103 este una dintre investi\u021biile care aduc deja rezultate. Condi\u021biile bune atrag echipe din \u021bar\u0103, care vin \u00een cantonament, ceea ce aduce venituri la bugetul local. Pentru a men\u021bine acest nivel, sunt necesare investi\u021bii noi, inclusiv montarea unor vestiare moderne, realizate din containere racordate la utilit\u0103\u021bi. \u00cen paralel, \u00een zona bazei sportive este preg\u0103tit un proiect pentru un parc fotovoltaic de 300 kW, finan\u021bat din fonduri europene.<\/p>\n<p><strong><u>Lista de investi\u021bii dep\u0103\u0219e\u0219te posibilit\u0103\u021bile bugetului<\/u><\/strong><\/p>\n<p>Lista investi\u021biilor pentru acest an este lung\u0103 \u0219i acoper\u0103 nevoi din mai multe zone ale localit\u0103\u021bii. Din bugetul local este prev\u0103zut un pod \u00een satul Valea Cheii, cu o lungime de 18 metri \u0219i o valoare de 1.200.000 de lei. \u00cen satul Coasta este programat\u0103 o extindere a re\u021belei de ap\u0103 pe 300 de metri, estimat\u0103 la 300.000 de lei. Este necesar\u0103 \u0219i reabilitarea remizei PSI, unde trebuie ob\u021binute documente \u0219i avize.<\/p>\n<p>Pe l\u00e2ng\u0103 acestea, sunt \u00een plan extinderi de re\u021bele electrice \u0219i de ap\u0103 \u00een Valea Viei, dar \u0219i o problem\u0103 major\u0103 legat\u0103 de canalizare. Proiectul, \u00een valoare de 18 milioane de euro, nu poate \u00eencepe f\u0103r\u0103 asigurarea cofinan\u021b\u0103rii: \u201d <strong><em>Pentru canalizare avem nevoie de aproximativ 400.000 de euro pentru cofinan\u021bare. Dac\u0103 nu facem dovada c\u0103 avem ace\u0219ti bani, proiectul nu porne\u0219te. Este un proiect mare, care se va derula prin Apavil, dar f\u0103r\u0103 contribu\u021bia noastr\u0103 nu se poate face nimic<\/em><\/strong>.\u201d<\/p>\n<p>Pe lista de investi\u021bii apare \u0219i extinderea re\u021belei de ap\u0103 \u00een zona Lacul Popii, unde costul este de aproximativ 1.300.000 de lei. Este o lucrare necesar\u0103, dar care nu poate fi realizat\u0103 anul acesta din lips\u0103 de fonduri.<\/p>\n<p>\u00cen paralel, administra\u021bia lucreaz\u0103 la documenta\u021bii pentru aproximativ 13 kilometri de drumuri comunale care nu sunt asfaltate. Scopul este ca proiectele s\u0103 fie gata pentru a fi depuse imediat ce apar noi linii de finan\u021bare. Pentru aceast\u0103 etap\u0103 sunt necesari bani pentru proiectare<\/p>\n<p>Printre planurile acestui an se reg\u0103sesc \u0219i reabilitarea sediului po\u0219tei din centrul localit\u0103\u021bii, precum \u0219i amenajarea unui loc de joac\u0103 \u00eentre centrul de zi \u0219i gr\u0103dini\u021b\u0103. Ziua localit\u0103\u021bii r\u0103m\u00e2ne \u00een discu\u021bie, cu inten\u021bia de a fi organizat\u0103 cu cheltuieli reduse.<\/p>\n<p><strong><u>Parcul auto se doteaz\u0103 cu utilaje noi<\/u><\/strong><\/p>\n<p>Un sprijin important vine din fonduri europene prin GAL, unde parcul auto al prim\u0103riei va fi modernizat. Este prev\u0103zut\u0103 achizi\u021bia unui tractor de aproximativ 70.000 de euro, cu remorc\u0103 \u0219i echipamente pentru desz\u0103pezire, o cistern\u0103 tip vidanj\u0103 dotat\u0103 pentru stingerea incendiilor \u0219i utilaje pentru \u00eentre\u021binerea spa\u021biilor verzi.<\/p>\n<p><em><u>A\u0219adar, la P\u0103u\u0219e\u0219ti M\u0103gla\u0219i se lucreaz\u0103, exist\u0103 direc\u021bie \u0219i proiecte, dar fiecare metru de asfalt \u0219i fiecare re\u021bea depind de banii care vin greu \u0219i insuficient de la centru<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-56575\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0000-radi-300x225.jpg\" alt width=\"300\" height=\"225\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-56576\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0pp-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56577\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-01-300x225.jpg\" alt width=\"300\" height=\"225\"> \u00a0<img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56579\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-01kk-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56580\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-444-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56581\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-MM-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56582\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0133-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-56583\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-0123-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/05\/01\/administratia-din-pausesti-maglasi-intre-asfalt-gaze-lucrari-in-teren-si-planuri-multe-cu-un-buget-care-nu-tine-pasul\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/05\/pausesti-m-011.jpg&#8221;] 1 mai 2026Claudia SchiopuAdministra\u0163iePausesti Maglasi Primarul Marcel Radi a verificat stadiul lucr\u0103rilor aflate \u00een derulare pe drumurile din comun\u0103, analiz\u00e2nd interven\u021biile realizate p\u00e2n\u0103 acum \u0219i modul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile \u00een teren. Concluzia: ritmul exist\u0103, utilajele sunt prezente, dar totul depinde de banii care vin de la centru. Prin Programul Na\u021bional [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-1913908","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1913908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1913908"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1913908\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1913908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1913908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1913908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}