{"id":1902433,"date":"2026-04-23T11:16:26","date_gmt":"2026-04-23T08:16:26","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1902433"},"modified":"2026-04-23T11:16:26","modified_gmt":"2026-04-23T08:16:26","slug":"lugojul-investeste-in-energie-verde-orasul-va-avea-parc-fotovoltaic-pentru-institutiile-publice","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1902433","title":{"rendered":"Lugojul investe\u0219te \u00een energie verde. Ora\u0219ul va avea parc fotovoltaic pentru institu\u021biile publice"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2023\/01\/+otf\/1200&#215;630\/AKF9ZhtB2okWfehKCNMKkk5PVF9WRVJZX1NFQ9aZdIFSEhEBRgwKkmAQ8LARojubwakOwLqDPYxsZ+nAznqWg14NaNA4kC8FVemkNIOdT7Bgzl4Xj____R+oa+xVg=\/3878603panourisolare-scaled.jpg&#8221;]<\/p>\n<article id=\"post-2266123\" class>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Investi\u021bia, estimat\u0103 la 19 milioane de lei, va avea o capacitate instalat\u0103 de 3,7 MW \u0219i este g\u00e2ndit\u0103 pentru a acoperi o parte semnificativ\u0103 din consumul energetic al Prim\u0103riei, al unit\u0103\u021bilor de \u00eenv\u0103\u021b\u0103m\u00e2nt \u0219i al Spitalului Municipal din Lugoj.<\/p>\n<p>Proiectul va fi implementat \u00een mai multe etape. Prima faz\u0103 presupune construirea efectiv\u0103 a parcului fotovoltaic, urmat\u0103 de racordarea \u0219i punerea \u00een func\u021biune, realizate \u00een colaborare cu Re\u021bele Electrice Banat. \u00cen etapa final\u0103, autorit\u0103\u021bile locale inten\u021bioneaz\u0103 s\u0103 dezvolte sistemul prin integrarea unor solu\u021bii moderne de stocare a energiei.<\/p>\n<p>Potrivit edilului C\u0103lin Dobra, investi\u021bia va contribui la reducerea semnificativ\u0103 a cheltuielilor cu energia la nivelul administra\u021biei locale, prin compensarea consumului institu\u021biilor publice.<\/p>\n<p>Termenul de implementare este de maximum 12 luni, \u00eens\u0103 exist\u0103 posibilitatea ca lucr\u0103rile s\u0103 fie finalizate mai devreme, \u00een func\u021bie de mobilizarea constructorului. Banii vin de la Ministerul Energiei.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone  wp-image-2266282\" src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/6947522dobrasemnarecontract.jpg\" alt width=\"1283\" height=\"855\"><\/p>\n<p><strong>Pe aceea\u0219i tem\u0103:<\/strong><\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"QCQuBW9ctw\">\n<p><a href=\"https:\/\/www.tion.ro\/lugoj\/parc-fotovoltaic-cu-bani-de-la-minister-la-lugoj-licitatie-de-4-milioane-de-euro-2202781\/\">Parc fotovoltaic cu bani de la minister, la Lugoj. Licita\u021bie de 4 milioane de euro<\/a><\/p>\n<\/blockquote>\n\n<p>\u00a0<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/calin-dobra\" rel=\"tag\"><span class=\"link\">Calin Dobra<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/parc-fotovoltaic\" rel=\"tag\"><span class=\"link\">parc fotovoltaic<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/primar\" rel=\"tag\"><span class=\"link\">primar<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/lugoj\/lugojul-investeste-in-energie-verde-orasul-va-avea-parc-fotovoltaic-pentru-institutiile-publice-2266123\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Investi\u021bia, estimat\u0103 la 19 milioane de lei, va avea o capacitate instalat\u0103 de 3,7 MW \u0219i este g\u00e2ndit\u0103 pentru a acoperi o parte semnificativ\u0103 din consumul energetic al Prim\u0103riei, al unit\u0103\u021bilor de \u00eenv\u0103\u021b\u0103m\u00e2nt \u0219i al Spitalului Municipal din Lugoj.<\/p>\n<p>Proiectul va fi implementat \u00een mai multe etape. Prima faz\u0103 presupune construirea efectiv\u0103 a parcului fotovoltaic, urmat\u0103 de racordarea \u0219i punerea \u00een func\u021biune, realizate \u00een colaborare cu Re\u021bele Electrice Banat. \u00cen etapa final\u0103, autorit\u0103\u021bile locale inten\u021bioneaz\u0103 s\u0103 dezvolte sistemul prin integrarea unor solu\u021bii moderne de stocare a energiei.<\/p>\n<p>Potrivit edilului C\u0103lin Dobra, investi\u021bia va contribui la reducerea semnificativ\u0103 a cheltuielilor cu energia la nivelul administra\u021biei locale, prin compensarea consumului institu\u021biilor publice.<\/p>\n<p>Termenul de implementare este de maximum 12 luni, \u00eens\u0103 exist\u0103 posibilitatea ca lucr\u0103rile s\u0103 fie finalizate mai devreme, \u00een func\u021bie de mobilizarea constructorului. Banii vin de la Ministerul Energiei.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone  wp-image-2266282\" src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/6947522dobrasemnarecontract.jpg\" alt width=\"1283\" height=\"855\"><\/p>\n<p><strong>Pe aceea\u0219i tem\u0103:<\/strong><\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"QCQuBW9ctw\">\n<p><a href=\"https:\/\/www.tion.ro\/lugoj\/parc-fotovoltaic-cu-bani-de-la-minister-la-lugoj-licitatie-de-4-milioane-de-euro-2202781\/\">Parc fotovoltaic cu bani de la minister, la Lugoj. Licita\u021bie de 4 milioane de euro<\/a><\/p>\n<\/blockquote>\n\n<p>\u00a0<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/calin-dobra\" rel=\"tag\"><span class=\"link\">Calin Dobra<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/parc-fotovoltaic\" rel=\"tag\"><span class=\"link\">parc fotovoltaic<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/primar\" rel=\"tag\"><span class=\"link\">primar<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/lugoj\/lugojul-investeste-in-energie-verde-orasul-va-avea-parc-fotovoltaic-pentru-institutiile-publice-2266123\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.tion.ro\/lugoj\/lugojul-investeste-in-energie-verde-orasul-va-avea-parc-fotovoltaic-pentru-institutiile-publice-2266123\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2023\/01\/+otf\/1200&#215;630\/AKF9ZhtB2okWfehKCNMKkk5PVF9WRVJZX1NFQ9aZdIFSEhEBRgwKkmAQ8LARojubwakOwLqDPYxsZ+nAznqWg14NaNA4kC8FVemkNIOdT7Bgzl4Xj____R+oa+xVg=\/3878603panourisolare-scaled.jpg&#8221;] Investi\u021bia, estimat\u0103 la 19 milioane de lei, va avea o capacitate instalat\u0103 de 3,7 MW \u0219i este g\u00e2ndit\u0103 pentru a acoperi o parte semnificativ\u0103 din consumul energetic al Prim\u0103riei, al unit\u0103\u021bilor de \u00eenv\u0103\u021b\u0103m\u00e2nt \u0219i al Spitalului Municipal din Lugoj. Proiectul va fi implementat \u00een mai multe etape. Prima faz\u0103 presupune construirea efectiv\u0103 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,191],"class_list":["post-1902433","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-tion-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1902433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1902433"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1902433\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1902433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1902433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1902433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}