{"id":1902308,"date":"2026-04-25T08:43:00","date_gmt":"2026-04-25T05:43:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1902308"},"modified":"2026-04-25T08:43:00","modified_gmt":"2026-04-25T05:43:00","slug":"energie-pe-hartie-zeci-de-mii-de-mw-tinuti-pe-loc-de-firme-fara-angajati-si-fara-venituri","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1902308","title":{"rendered":"Energie pe h\u00e2rtie: zeci de mii de MW, \u021binu\u021bi pe loc de firme f\u0103r\u0103 angaja\u021bi \u0219i f\u0103r\u0103 venituri"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.observatornews.ro\/?u=https%3A%2F%2Fobservatornews.ro%2Fuploads%2Fmodules%2Fnews%2F0%2F2026%2F4%2F25%2F652687%2Fprofimedia-1093261467-362e266b.jpg&amp;w=1200&amp;h=630&amp;c=1&#8243;]<\/p>\n<div class=\"articleBody\" data-key=\"articleBody\">&#8220;Peste 1400 de avize tehnice de racordare (ATR) apar\u0163in, \u00een prezent, unui num\u0103r de peste 1000 de titulari \u2013 companii private \u015fi cu capital de stat, municipalit\u0103\u0163i, administra\u0163ii publice \u015fi alte entit\u0103\u0163i \u2013 care de\u0163in cumulat cel pu\u0163in 1 MW.\u00a0 Aceste avize tehnice de racordare valabile corespund unor proiecte energetice cu o putere total\u0103 planificat\u0103 de peste 80.000 MW &#8211; de aproape zece ori puterea actual\u0103 necesar\u0103 &#8211; dispropor\u0163ie accentuat\u0103 de faptul c\u0103 o parte \u00eensemnat\u0103 a capacit\u0103\u0163ilor rezervate nu progreseaz\u0103 \u00een mod efectiv c\u0103tre implementare&#8221;, anun\u0163\u0103 s\u00e2mb\u0103t\u0103 Executivul, preciz\u00e2nd c\u0103 informa\u0163iile rezult\u0103 din radiografia realizat\u0103 pe baza datelor furnizate de Compania Na\u0163ional\u0103 de Transport al Energiei Electrice &#8220;Transelectrica&#8221; SA, care a consolidat \u015fi informa\u0163iile transmise de ceilal\u0163i operatori de distribu\u0163ie.<\/p>\n<p>Cine de\u021bine avizele pentru racordare \u00een re\u021bea<\/p>\n<p>Guvernul prezint\u0103 \u015fi\u00a0lista beneficiarilor de ATR, sublinind c\u0103\u00a0 urm\u0103re\u015fte s\u0103 asigure un nivel mai ridicat de transparen\u0163\u0103 privind rezerv\u0103rile de capacitate \u00een re\u0163ea, \u00een contextul reformei cadrului de emitere a ATR-urilor.<\/p>\n<p>&#8220;Lista celor peste 1400 de ATR-uri reprezint\u0103 o selec\u0163ie, nu o list\u0103 exhaustiv\u0103, deoarece\u00a0 include entit\u0103\u0163ile care de\u0163in cumulat cel pu\u0163in 1 MW (o entitate poate figura cu unul sau mai multe ATR-uri; pragul se aplic\u0103 la nivel de titular, nu per aviz). De asemenea, aceast\u0103 list\u0103 reflect\u0103 o situa\u0163ie de moment, care poate fi modificat\u0103, \u015fi include proiecte aflate \u00een toate etapele procesuale &#8211; de la avize recent emise, la contracte de racordare semnate, lucr\u0103ri \u00een execu\u0163ie \u015fi puneri \u00een func\u0163iune recente.\u00a0 Sunt incluse, deopotriv\u0103, capacit\u0103\u0163i opera\u0163ionale reale, proiecte \u00een curs de realizare \u015fi ATR-uri aflate \u00eenc\u0103 \u00een faze de \u00eenceput ale procesului de dezvoltare&#8221;, anun\u0163\u0103 Guvernul \u00eentr-un comunicat.<\/p>\n<p>\u00cen paralel, a fost realizat\u0103 o interogare la Oficiul Na\u0163ional al Registrului Comer\u0163ului pentru un e\u015fantion aleatoriu de 722 firme din list\u0103 ~ 72 000 MW capacitate aprobat\u0103.\u00a0<\/p>\n<p>Datele rezultate arat\u0103 c\u0103 cele mai multe dintre aceste firme, respectiv 437, au fost \u00eenfiin\u0163ate \u00een perioada 2020-2023, 105 firme \u00een perioada 2010-2019, 100 \u00eenainte de anul 2010 \u015fi 59 dup\u0103 anul 2024.<\/p>\n<p>Din perspectiva analizei cifrei de afaceri, la nivelul anului 2024, 76% dintre aceste firme aveau cifr\u0103 de afaceri zero, \u015fi doar 37 aveau cifr\u0103 de afaceri de peste 100 de milioane de lei.<\/p>\n<p>De asemenea, 78% din firmele care au rezultat ca urmare a interog\u0103rii ONRC nu aveau niciun angajat \u00een anul 2024 \u015fi doar 15 firme aveau peste 250 de angaja\u0163i.<\/p>\n<p>Analizate din punctul de vedere al capitalului social, peste jum\u0103tate din companii, respectiv 387, aveau capital social mai mic de 10.000 de lei, dintre care 318 firme aveau capital social sub 1.000 de lei. Doar 14%, adic\u0103 101 firme, aveau capital social \u00eentre 100.000 de lei \u015fi 1 milion de lei.<\/p>\n<p>Bolojan anun\u021b\u0103 m\u0103suri \u00eempotriva speculatorilor din energie<\/p>\n<p>Premierul Ilie Bolojan anun\u0163\u0103, vineri, dup\u0103 \u00eent\u00e2lnirea cu pre\u015fedintele ANRE,oprirea speculatorilor \u015fi deblocarea accesului produc\u0103torilor de energie la re\u0163ele electrice. El precizeaz\u0103 c\u0103 luni vor fi publicate \u00een dezbatere public\u0103 dou\u0103 regulamente, privind racordarea \u015fi ob\u0163inerea autoriza\u0163iei de \u00eenfiin\u0163are.<\/p>\n<p>&#8220;Oprim speculatorii \u015fi debloc\u0103m accesul produc\u0103torilor de energie la re\u0163elele electrice&#8221;, a anun\u0163at premierul pe Facebook.\u00a0<\/p>\n<p>El precizeaz\u0103 c\u0103, &#8220;pentru a reduce pre\u0163ul energiei, avem nevoie de mai mult\u0103 capacitate de stocare, de cre\u015fterea produc\u0163iei, at\u00e2t \u00een band\u0103, prin finalizarea investi\u0163iilor aflate \u00een curs, c\u00e2t \u015fi prin permiterea accesului pe pia\u0163\u0103 al noilor produc\u0103tori pe fotovoltaic \u015fi eolian, care s\u0103 investeasc\u0103 \u015fi s\u0103 injecteze energie \u00een sistem \u015fi astfel, printr-o ofert\u0103 mai mare, pre\u0163urile pot sc\u0103dea&#8221;.<\/p>\n<p>80.000 MW pe h\u00e2rtie, mult peste necesar<\/p>\n<p>&#8220;Din p\u0103cate, \u00een ultimii ani accesul la re\u0163ele a fost blocat \u015fi scumpit prin emiterea unui num\u0103r prea mare de autoriza\u0163ii tehnice de racordare (ATR), ce dep\u0103\u015fec cu mult necesit\u0103\u0163ile economiei noastre. Astfel, s-au emis ATR-uri de peste 80.000 MW, fa\u0163\u0103 de circa 9.000 MW necesari, la care se adaug\u0103 \u00eenc\u0103 30.000 MW afla\u0163i \u00een procesare.\u00a0 F\u0103r\u0103 deblocarea accesului la re\u0163ele, toate discu\u0163iile legate de reducerea pre\u0163urilor la energie nu au niciun fundament. Vom \u00eendrepta lucrurile&#8221;, a subliniat prim-ministrul.\u00a0\n<\/p><\/div>\n<p>[analyse_source url=&#8221;https:\/\/observatornews.ro\/politic\/energie-pe-hartie-zeci-de-mii-de-mw-tinuti-pe-loc-de-firme-fara-angajati-si-fara-venituri-652687.html&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.observatornews.ro\/?u=https%3A%2F%2Fobservatornews.ro%2Fuploads%2Fmodules%2Fnews%2F0%2F2026%2F4%2F25%2F652687%2Fprofimedia-1093261467-362e266b.jpg&amp;w=1200&amp;h=630&amp;c=1&#8243;] &#8220;Peste 1400 de avize tehnice de racordare (ATR) apar\u0163in, \u00een prezent, unui num\u0103r de peste 1000 de titulari \u2013 companii private \u015fi cu capital de stat, municipalit\u0103\u0163i, administra\u0163ii publice \u015fi alte entit\u0103\u0163i \u2013 care de\u0163in cumulat cel pu\u0163in 1 MW.\u00a0 Aceste avize tehnice de racordare valabile corespund unor proiecte energetice cu o [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[226,30],"class_list":["post-1902308","post","type-post","status-publish","format-standard","hentry","category-politics","tag-crawlmanager","tag-observatornews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1902308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1902308"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1902308\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1902308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1902308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1902308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}