{"id":1901946,"date":"2026-04-24T16:41:44","date_gmt":"2026-04-24T13:41:44","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1901946"},"modified":"2026-04-24T16:41:44","modified_gmt":"2026-04-24T13:41:44","slug":"primarul-din-stoenesti-despre-dispensar-drumuri-si-buget-nici-nu-ma-gandesc-la-investitii-din-bugetul-local-anul-acesta","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1901946","title":{"rendered":"Primarul din Stoene\u0219ti, despre dispensar, drumuri \u0219i buget: \u201eNici nu m\u0103 g\u00e2ndesc la investi\u021bii din bugetul local anul acesta\u201d"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2017\/02\/FOTO-PRIMAR-DUMBRAVA-scaled.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2017\/02\/FOTO-PRIMAR-DUMBRAVA-scaled.jpg\" class=\"img-responsive wp-post-image\" alt=\"Primarul din Stoene\u0219ti, despre dispensar, drumuri \u0219i buget: \u201eNici nu m\u0103 g\u00e2ndesc la investi\u021bii din bugetul local anul acesta\u201d\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/04\/24\/primarul-din-stoenesti-despre-dispensar-drumuri-si-buget-nici-nu-ma-gandesc-la-investitii-din-bugetul-local-anul-acesta\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2026-04-24T19:41:44+03:00\">24 aprilie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/stoenesti-o-comoara-ascunsa-in-inima-romaniei\/\" rel=\"category tag\">Stoene\u0219ti<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Stoene\u0219ti, prim\u0103ria are proiecte importante pe mas\u0103, dar are \u0219i datorii care apas\u0103 bugetul local. Cea mai avansat\u0103 lucrare este modernizarea dispensarului, un proiect realizat cu bani europeni, aflat acum \u00een procedur\u0103 de licita\u021bie. Cl\u0103direa va fi consolidat\u0103, va primi o structur\u0103 mai sigur\u0103, un acoperi\u0219 nou, panouri fotovoltaice \u0219i spa\u021bii mai bine a\u0219ezate pentru serviciile medicale.<\/p>\n<p>Lucrarea este una necesar\u0103 pentru sat, deoarece dispensarul este folosit de cei doi medici de familie care \u00ee\u0219i desf\u0103\u0219oar\u0103 activitatea \u00een localitate. Administra\u021bia local\u0103 vrea ca, dup\u0103 modernizare, \u00een cl\u0103dire s\u0103 existe \u0219i un cabinet de stomatologie, deoarece oamenii au cerut un astfel de serviciu mai aproape de cas\u0103:<\/p>\n<p>\u201e<strong><em>La proiectul de modernizare a dispensarului suntem \u00een procedur\u0103 de licita\u021bie. Este vorba despre o lucrare pe risc seismic, cu o cofinan\u021bare de 300.000 de lei, bani pe care trebuie s\u0103 \u00eei punem de la noi. Proiectul se face cu fonduri europene. Vorbim despre consolidarea cl\u0103dirii, despre o lucrare serioas\u0103 \u0219i necesar\u0103. Se sap\u0103 pe l\u00e2ng\u0103 temelie, se consolideaz\u0103 \u0219i interiorul, se d\u0103 jos acoperi\u0219ul, se toarn\u0103 o plac\u0103. Cl\u0103direa va avea \u0219i panouri fotovoltaice. \u00cen localitate avem doi medici de familie, iar dup\u0103 modernizare vrem s\u0103 facem loc \u0219i pentru stomatologie, pentru c\u0103 exist\u0103 aceast\u0103 cerere din partea oamenilor<\/em><\/strong>\u201d, a declarat primarul Gheorghe Dumbrav\u0103.<\/p>\n<p>Lucrarea de la dispensar este, \u00een acest an, unul dintre pu\u021binele proiecte care pot fi duse mai departe, deoarece finan\u021barea vine din fonduri externe. Prim\u0103ria trebuie s\u0103 asigure partea sa de contribu\u021bie, \u00eens\u0103 grosul banilor nu vine din bugetul local. Acest lucru conteaz\u0103 mult, deoarece resursele proprii sunt limitate, iar administra\u021bia are de pl\u0103tit datorii r\u0103mase din anul trecut.<\/p>\n<p>Primarul spune c\u0103 \u0219i-ar fi dorit s\u0103 mai poat\u0103 prinde c\u00e2teva str\u0103du\u021be pentru betonare, dar anul acesta bugetul nu permite lucr\u0103ri noi din bani locali. Prioritatea este plata obliga\u021biilor vechi \u0219i asigurarea func\u021bion\u0103rii serviciilor de baz\u0103:\u201e<strong>Noi ne-am mai fi dorit \u0219i alte lucr\u0103ri. Mai avem c\u00e2teva str\u0103du\u021be de betonat, dar anul acesta nu ne putem \u00eentinde mai mult dec\u00e2t ne permite bugetul. Proiectul de la dispensar se va face pentru c\u0103 are finan\u021bare extern\u0103. Din bugetul local nu pot s\u0103 pun acum investi\u021bii noi, pentru c\u0103 trebuie s\u0103 v\u0103d cum achit\u0103m datoriile care s-au str\u00e2ns<\/strong>\u201d, a spus Gheorghe Dumbrav\u0103.<\/p>\n<p><strong><u>Drumul spre M\u0103n\u0103stirea Jgheaburi, \u00een c\u0103utarea unei finan\u021b\u0103ri pentru modernizare<\/u><\/strong><\/p>\n<p>O alt\u0103 problem\u0103 mare pentru Stoene\u0219ti este <strong><u>drumul care urc\u0103 din Dealul Crucii spre M\u0103n\u0103stirea Jgheaburi<\/u><\/strong>. Este vorba despre un traseu de 3,4 kilometri, trecut \u00een administrarea Prim\u0103riei Stoene\u0219ti de aproximativ doi ani. Drumul a fost clasificat anterior ca drum forestier \u0219i a ajuns la prim\u0103rie dup\u0103 ce finan\u021barea prin Anghel Saligny fusese deja \u00eenchis\u0103. Din acest motiv, administra\u021bia local\u0103 nu a mai putut s\u0103 \u00eel includ\u0103 la timp \u00eentr-un proiect de asfaltare sau betonare.<\/p>\n<p>Drumul are acum denumirea DC 208. El este folosit de m\u0103icu\u021bele de la m\u0103n\u0103stire, de oamenii care merg la slujbe \u0219i de utilaje grele din zona de exploatare forestier\u0103. Tocmai aceste utilaje fac lucrurile mai dificile. Chiar dac\u0103 prim\u0103ria niveleaz\u0103 traseul cu autogrederul, dup\u0103 trecerea ma\u0219inilor mari, drumul se stric\u0103 din nou.<\/p>\n<p>\u201e<strong><em>Avem de vreo doi ani \u00een administrare \u0219i drumul din Dealul Crucii p\u00e2n\u0103 la M\u0103n\u0103stirea Jgheaburi, pe o lungime de 3,4 kilometri. A fost un drum clasificat ca forestier. A trecut din administrarea Consiliului Jude\u021bean \u00een administrarea prim\u0103riei, dar l-am primit dup\u0103 ce s-a \u00eenchis finan\u021barea prin Anghel Saligny. Acum trebuie s\u0103 g\u0103sim alt\u0103 surs\u0103 de bani. Drumul este foarte greu. Am \u00eencercat s\u0103 \u00eel amenaj\u0103m c\u00e2t de c\u00e2t, dar acolo este o problem\u0103 mare. Dac\u0103 \u00eel aranj\u0103m ast\u0103zi cu autogrederul, trec ma\u0219inile mari cu lemne, pentru c\u0103 \u00een zon\u0103 se exploateaz\u0103 lemn, \u0219i utilajele grele \u00eel stric\u0103 din nou<\/em><\/strong>\u201d, a explicat primarul.<\/p>\n<p>Gheorghe Dumbrav\u0103 spune c\u0103 \u00een\u021belege nemul\u021bumirile oamenilor \u0219i ale celor care merg la M\u0103n\u0103stirea Jgheaburi, dar sus\u021bine c\u0103 solu\u021bia real\u0103 nu poate veni f\u0103r\u0103 o finan\u021bare solid\u0103. O interven\u021bie simpl\u0103 nu rezist\u0103 prea mult, deoarece traficul greu rupe repede drumul.<\/p>\n<p>\u201e<strong><em>Mie \u00eemi pare r\u0103u de m\u0103icu\u021bele care slujesc la aceast\u0103 m\u0103n\u0103stire, dar \u0219i de credincio\u0219ii care merg acolo, pentru c\u0103 drumul nu este bun. Eu sunt un om care nu las\u0103 lucrurile, dar cu acest drum nu \u0219tiu c\u00e2t de repede pot rezolva problema. Finan\u021b\u0103rile s-au \u00eenchis. \u0218tiu c\u0103 nevoile sunt mari. \u0218tiu c\u0103 sunt \u0219i critici. Dac\u0103 reu\u0219eam s\u0103 \u00eel lu\u0103m \u00een administrare odat\u0103 cu deschiderea programului Anghel Saligny, ast\u0103zi era altfel. Puteam s\u0103 \u00eel asfalt\u0103m sau s\u0103 \u00eel beton\u0103m. I-am dat denumirea de drum comunal DC 208, dar acum trebuie s\u0103 g\u0103sim o surs\u0103 de finan\u021bare<\/em><\/strong>\u201d, a mai spus primarul comunei Stoene\u0219ti.<\/p>\n<p><strong><u>Gaze: aviz primit, traseu nou stabilit<\/u><\/strong><\/p>\n<p>Pe lista proiectelor importante r\u0103m\u00e2ne \u0219i introducerea gazelor. Prim\u0103ria a primit avizul de la Transgaz, iar solu\u021bia tehnic\u0103 indic\u0103 o racordare din zona Tom\u0219ani, de la limita dintre Tom\u0219ani \u0219i Coste\u0219ti. Ini\u021bial, varianta luat\u0103 \u00een calcul era conectarea dinspre P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, dar traseul trebuie modificat \u00een func\u021bie de noua solu\u021bie transmis\u0103 de Transgaz;<\/p>\n<p>\u201e<strong><em>Am primit avizul \u0219i de la Transgaz pentru proiectul de gaze. Cu ADI suntem \u00een c\u0103r\u021bi, a\u0219 putea spune. Ne vom lega de la Tom\u0219ani, de la limita dintre Tom\u0219ani \u0219i Coste\u0219ti. Aceasta este solu\u021bia pe care ne-a dat-o Transgaz. Noi am avut la \u00eenceput conectarea de la P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, dar acum proiectantul lucreaz\u0103 la schimbarea traseului<\/em><\/strong>\u201d, a precizat Gheorghe Dumbrav\u0103.<\/p>\n<p><strong><u>Buget sub presiune<\/u><\/strong><\/p>\n<p>Dincolo de proiecte, marea problem\u0103 a administra\u021biei din Stoene\u0219ti r\u0103m\u00e2ne bugetul. Primarul spune c\u0103 sumele primite nu pot acoperi datoriile existente. Cea mai grea restan\u021b\u0103 vine de la plata drepturilor pentru persoanele cu dizabilit\u0103\u021bi. Reamintim c\u0103 Prim\u0103ria are de achitat 600.000 de lei din anul trecut, dup\u0103 ce num\u0103rul beneficiarilor a crescut mult fa\u021b\u0103 de situa\u021bia transmis\u0103 \u00een luna septembrie.<\/p>\n<p>Acesta spune c\u0103 situa\u021bia s-a schimbat mult \u00eentre luna septembrie \u0219i finalul anului trecut. Num\u0103rul persoanelor cu dizabilit\u0103\u021bi a crescut, dar alocarea a r\u0103mas la nivelul vechi.<\/p>\n<p>\u201e<strong><em>\u00cen luna septembrie, c\u00e2nd am transmis ce datorii avem \u0219i c\u00e2te persoane cu dizabilit\u0103\u021bi sunt \u00een comun\u0103, aveam 72 de persoane. Numai c\u0103 anul 2025 s-a \u00eencheiat cu 96 de persoane. A\u0219a am r\u0103mas cu datorie. Suma primit\u0103 anul acesta pentru persoanele cu dizabilit\u0103\u021bi este ca anul trecut, tot de 25 de miliarde de lei vechi, chiar dac\u0103 acum avem 96 de persoane. Mai mult dec\u00e2t at\u00e2t, anul acesta avem deja patru cereri pentru asisten\u021bi personali. P\u00e2n\u0103 acum nu am avut asisten\u021bi personali \u00eenregistra\u021bi la prim\u0103rie, dar de anul acesta nu mai pot evita aceast\u0103 situa\u021bie, pentru c\u0103 sunt persoane care au cu adev\u0103rat nevoie de ajutor. Ace\u0219ti asisten\u021bi vor avea contract de munc\u0103 \u0219i toate drepturile prev\u0103zute de lege<\/em><\/strong>\u201d, a mai spus Gheorghe Dumbrav\u0103.<\/p>\n<p>A\u0219adar, la Stoene\u0219ti, dispensarul medical poate intra \u00een modernizare datorit\u0103 fondurilor europene. Drumul spre M\u0103n\u0103stirea Jgheaburi are nevoie de o finan\u021bare separat\u0103, deoarece lucr\u0103rile simple nu rezist\u0103 traficului greu. Proiectul de gaze are aviz de la Transgaz \u0219i intr\u0103 \u00eentr-o etap\u0103 tehnic\u0103 nou\u0103, prin schimbarea traseului.<\/p>\n<p>\u00cen acela\u0219i timp, prim\u0103ria trebuie s\u0103 achite datorii vechi \u0219i s\u0103 asigure bani pentru persoanele cu dizabilit\u0103\u021bi, \u00eentr-un an \u00een care fondurile primite nu \u021bin ritmul cu nevoile reale din localitate.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Stoene\u0219ti, prim\u0103ria are proiecte importante pe mas\u0103, dar are \u0219i datorii care apas\u0103 bugetul local. Cea mai avansat\u0103 lucrare este modernizarea dispensarului, un proiect realizat cu bani europeni, aflat acum \u00een procedur\u0103 de licita\u021bie. Cl\u0103direa va fi consolidat\u0103, va primi o structur\u0103 mai sigur\u0103, un acoperi\u0219 nou, panouri fotovoltaice \u0219i spa\u021bii mai bine a\u0219ezate pentru serviciile medicale.<\/p>\n<p>Lucrarea este una necesar\u0103 pentru sat, deoarece dispensarul este folosit de cei doi medici de familie care \u00ee\u0219i desf\u0103\u0219oar\u0103 activitatea \u00een localitate. Administra\u021bia local\u0103 vrea ca, dup\u0103 modernizare, \u00een cl\u0103dire s\u0103 existe \u0219i un cabinet de stomatologie, deoarece oamenii au cerut un astfel de serviciu mai aproape de cas\u0103:<\/p>\n<p>\u201e<strong><em>La proiectul de modernizare a dispensarului suntem \u00een procedur\u0103 de licita\u021bie. Este vorba despre o lucrare pe risc seismic, cu o cofinan\u021bare de 300.000 de lei, bani pe care trebuie s\u0103 \u00eei punem de la noi. Proiectul se face cu fonduri europene. Vorbim despre consolidarea cl\u0103dirii, despre o lucrare serioas\u0103 \u0219i necesar\u0103. Se sap\u0103 pe l\u00e2ng\u0103 temelie, se consolideaz\u0103 \u0219i interiorul, se d\u0103 jos acoperi\u0219ul, se toarn\u0103 o plac\u0103. Cl\u0103direa va avea \u0219i panouri fotovoltaice. \u00cen localitate avem doi medici de familie, iar dup\u0103 modernizare vrem s\u0103 facem loc \u0219i pentru stomatologie, pentru c\u0103 exist\u0103 aceast\u0103 cerere din partea oamenilor<\/em><\/strong>\u201d, a declarat primarul Gheorghe Dumbrav\u0103.<\/p>\n<p>Lucrarea de la dispensar este, \u00een acest an, unul dintre pu\u021binele proiecte care pot fi duse mai departe, deoarece finan\u021barea vine din fonduri externe. Prim\u0103ria trebuie s\u0103 asigure partea sa de contribu\u021bie, \u00eens\u0103 grosul banilor nu vine din bugetul local. Acest lucru conteaz\u0103 mult, deoarece resursele proprii sunt limitate, iar administra\u021bia are de pl\u0103tit datorii r\u0103mase din anul trecut.<\/p>\n<p>Primarul spune c\u0103 \u0219i-ar fi dorit s\u0103 mai poat\u0103 prinde c\u00e2teva str\u0103du\u021be pentru betonare, dar anul acesta bugetul nu permite lucr\u0103ri noi din bani locali. Prioritatea este plata obliga\u021biilor vechi \u0219i asigurarea func\u021bion\u0103rii serviciilor de baz\u0103:\u201e<strong>Noi ne-am mai fi dorit \u0219i alte lucr\u0103ri. Mai avem c\u00e2teva str\u0103du\u021be de betonat, dar anul acesta nu ne putem \u00eentinde mai mult dec\u00e2t ne permite bugetul. Proiectul de la dispensar se va face pentru c\u0103 are finan\u021bare extern\u0103. Din bugetul local nu pot s\u0103 pun acum investi\u021bii noi, pentru c\u0103 trebuie s\u0103 v\u0103d cum achit\u0103m datoriile care s-au str\u00e2ns<\/strong>\u201d, a spus Gheorghe Dumbrav\u0103.<\/p>\n<p><strong><u>Drumul spre M\u0103n\u0103stirea Jgheaburi, \u00een c\u0103utarea unei finan\u021b\u0103ri pentru modernizare<\/u><\/strong><\/p>\n<p>O alt\u0103 problem\u0103 mare pentru Stoene\u0219ti este <strong><u>drumul care urc\u0103 din Dealul Crucii spre M\u0103n\u0103stirea Jgheaburi<\/u><\/strong>. Este vorba despre un traseu de 3,4 kilometri, trecut \u00een administrarea Prim\u0103riei Stoene\u0219ti de aproximativ doi ani. Drumul a fost clasificat anterior ca drum forestier \u0219i a ajuns la prim\u0103rie dup\u0103 ce finan\u021barea prin Anghel Saligny fusese deja \u00eenchis\u0103. Din acest motiv, administra\u021bia local\u0103 nu a mai putut s\u0103 \u00eel includ\u0103 la timp \u00eentr-un proiect de asfaltare sau betonare.<\/p>\n<p>Drumul are acum denumirea DC 208. El este folosit de m\u0103icu\u021bele de la m\u0103n\u0103stire, de oamenii care merg la slujbe \u0219i de utilaje grele din zona de exploatare forestier\u0103. Tocmai aceste utilaje fac lucrurile mai dificile. Chiar dac\u0103 prim\u0103ria niveleaz\u0103 traseul cu autogrederul, dup\u0103 trecerea ma\u0219inilor mari, drumul se stric\u0103 din nou.<\/p>\n<p>\u201e<strong><em>Avem de vreo doi ani \u00een administrare \u0219i drumul din Dealul Crucii p\u00e2n\u0103 la M\u0103n\u0103stirea Jgheaburi, pe o lungime de 3,4 kilometri. A fost un drum clasificat ca forestier. A trecut din administrarea Consiliului Jude\u021bean \u00een administrarea prim\u0103riei, dar l-am primit dup\u0103 ce s-a \u00eenchis finan\u021barea prin Anghel Saligny. Acum trebuie s\u0103 g\u0103sim alt\u0103 surs\u0103 de bani. Drumul este foarte greu. Am \u00eencercat s\u0103 \u00eel amenaj\u0103m c\u00e2t de c\u00e2t, dar acolo este o problem\u0103 mare. Dac\u0103 \u00eel aranj\u0103m ast\u0103zi cu autogrederul, trec ma\u0219inile mari cu lemne, pentru c\u0103 \u00een zon\u0103 se exploateaz\u0103 lemn, \u0219i utilajele grele \u00eel stric\u0103 din nou<\/em><\/strong>\u201d, a explicat primarul.<\/p>\n<p>Gheorghe Dumbrav\u0103 spune c\u0103 \u00een\u021belege nemul\u021bumirile oamenilor \u0219i ale celor care merg la M\u0103n\u0103stirea Jgheaburi, dar sus\u021bine c\u0103 solu\u021bia real\u0103 nu poate veni f\u0103r\u0103 o finan\u021bare solid\u0103. O interven\u021bie simpl\u0103 nu rezist\u0103 prea mult, deoarece traficul greu rupe repede drumul.<\/p>\n<p>\u201e<strong><em>Mie \u00eemi pare r\u0103u de m\u0103icu\u021bele care slujesc la aceast\u0103 m\u0103n\u0103stire, dar \u0219i de credincio\u0219ii care merg acolo, pentru c\u0103 drumul nu este bun. Eu sunt un om care nu las\u0103 lucrurile, dar cu acest drum nu \u0219tiu c\u00e2t de repede pot rezolva problema. Finan\u021b\u0103rile s-au \u00eenchis. \u0218tiu c\u0103 nevoile sunt mari. \u0218tiu c\u0103 sunt \u0219i critici. Dac\u0103 reu\u0219eam s\u0103 \u00eel lu\u0103m \u00een administrare odat\u0103 cu deschiderea programului Anghel Saligny, ast\u0103zi era altfel. Puteam s\u0103 \u00eel asfalt\u0103m sau s\u0103 \u00eel beton\u0103m. I-am dat denumirea de drum comunal DC 208, dar acum trebuie s\u0103 g\u0103sim o surs\u0103 de finan\u021bare<\/em><\/strong>\u201d, a mai spus primarul comunei Stoene\u0219ti.<\/p>\n<p><strong><u>Gaze: aviz primit, traseu nou stabilit<\/u><\/strong><\/p>\n<p>Pe lista proiectelor importante r\u0103m\u00e2ne \u0219i introducerea gazelor. Prim\u0103ria a primit avizul de la Transgaz, iar solu\u021bia tehnic\u0103 indic\u0103 o racordare din zona Tom\u0219ani, de la limita dintre Tom\u0219ani \u0219i Coste\u0219ti. Ini\u021bial, varianta luat\u0103 \u00een calcul era conectarea dinspre P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, dar traseul trebuie modificat \u00een func\u021bie de noua solu\u021bie transmis\u0103 de Transgaz;<\/p>\n<p>\u201e<strong><em>Am primit avizul \u0219i de la Transgaz pentru proiectul de gaze. Cu ADI suntem \u00een c\u0103r\u021bi, a\u0219 putea spune. Ne vom lega de la Tom\u0219ani, de la limita dintre Tom\u0219ani \u0219i Coste\u0219ti. Aceasta este solu\u021bia pe care ne-a dat-o Transgaz. Noi am avut la \u00eenceput conectarea de la P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, dar acum proiectantul lucreaz\u0103 la schimbarea traseului<\/em><\/strong>\u201d, a precizat Gheorghe Dumbrav\u0103.<\/p>\n<p><strong><u>Buget sub presiune<\/u><\/strong><\/p>\n<p>Dincolo de proiecte, marea problem\u0103 a administra\u021biei din Stoene\u0219ti r\u0103m\u00e2ne bugetul. Primarul spune c\u0103 sumele primite nu pot acoperi datoriile existente. Cea mai grea restan\u021b\u0103 vine de la plata drepturilor pentru persoanele cu dizabilit\u0103\u021bi. Reamintim c\u0103 Prim\u0103ria are de achitat 600.000 de lei din anul trecut, dup\u0103 ce num\u0103rul beneficiarilor a crescut mult fa\u021b\u0103 de situa\u021bia transmis\u0103 \u00een luna septembrie.<\/p>\n<p>Acesta spune c\u0103 situa\u021bia s-a schimbat mult \u00eentre luna septembrie \u0219i finalul anului trecut. Num\u0103rul persoanelor cu dizabilit\u0103\u021bi a crescut, dar alocarea a r\u0103mas la nivelul vechi.<\/p>\n<p>\u201e<strong><em>\u00cen luna septembrie, c\u00e2nd am transmis ce datorii avem \u0219i c\u00e2te persoane cu dizabilit\u0103\u021bi sunt \u00een comun\u0103, aveam 72 de persoane. Numai c\u0103 anul 2025 s-a \u00eencheiat cu 96 de persoane. A\u0219a am r\u0103mas cu datorie. Suma primit\u0103 anul acesta pentru persoanele cu dizabilit\u0103\u021bi este ca anul trecut, tot de 25 de miliarde de lei vechi, chiar dac\u0103 acum avem 96 de persoane. Mai mult dec\u00e2t at\u00e2t, anul acesta avem deja patru cereri pentru asisten\u021bi personali. P\u00e2n\u0103 acum nu am avut asisten\u021bi personali \u00eenregistra\u021bi la prim\u0103rie, dar de anul acesta nu mai pot evita aceast\u0103 situa\u021bie, pentru c\u0103 sunt persoane care au cu adev\u0103rat nevoie de ajutor. Ace\u0219ti asisten\u021bi vor avea contract de munc\u0103 \u0219i toate drepturile prev\u0103zute de lege<\/em><\/strong>\u201d, a mai spus Gheorghe Dumbrav\u0103.<\/p>\n<p>A\u0219adar, la Stoene\u0219ti, dispensarul medical poate intra \u00een modernizare datorit\u0103 fondurilor europene. Drumul spre M\u0103n\u0103stirea Jgheaburi are nevoie de o finan\u021bare separat\u0103, deoarece lucr\u0103rile simple nu rezist\u0103 traficului greu. Proiectul de gaze are aviz de la Transgaz \u0219i intr\u0103 \u00eentr-o etap\u0103 tehnic\u0103 nou\u0103, prin schimbarea traseului.<\/p>\n<p>\u00cen acela\u0219i timp, prim\u0103ria trebuie s\u0103 achite datorii vechi \u0219i s\u0103 asigure bani pentru persoanele cu dizabilit\u0103\u021bi, \u00eentr-un an \u00een care fondurile primite nu \u021bin ritmul cu nevoile reale din localitate.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Stoene\u0219ti, prim\u0103ria are proiecte importante pe mas\u0103, dar are \u0219i datorii care apas\u0103 bugetul local. Cea mai avansat\u0103 lucrare este modernizarea dispensarului, un proiect realizat cu bani europeni, aflat acum \u00een procedur\u0103 de licita\u021bie. Cl\u0103direa va fi consolidat\u0103, va primi o structur\u0103 mai sigur\u0103, un acoperi\u0219 nou, panouri fotovoltaice \u0219i spa\u021bii mai bine a\u0219ezate pentru serviciile medicale.<\/p>\n<p>Lucrarea este una necesar\u0103 pentru sat, deoarece dispensarul este folosit de cei doi medici de familie care \u00ee\u0219i desf\u0103\u0219oar\u0103 activitatea \u00een localitate. Administra\u021bia local\u0103 vrea ca, dup\u0103 modernizare, \u00een cl\u0103dire s\u0103 existe \u0219i un cabinet de stomatologie, deoarece oamenii au cerut un astfel de serviciu mai aproape de cas\u0103:<\/p>\n<p>\u201e<strong><em>La proiectul de modernizare a dispensarului suntem \u00een procedur\u0103 de licita\u021bie. Este vorba despre o lucrare pe risc seismic, cu o cofinan\u021bare de 300.000 de lei, bani pe care trebuie s\u0103 \u00eei punem de la noi. Proiectul se face cu fonduri europene. Vorbim despre consolidarea cl\u0103dirii, despre o lucrare serioas\u0103 \u0219i necesar\u0103. Se sap\u0103 pe l\u00e2ng\u0103 temelie, se consolideaz\u0103 \u0219i interiorul, se d\u0103 jos acoperi\u0219ul, se toarn\u0103 o plac\u0103. Cl\u0103direa va avea \u0219i panouri fotovoltaice. \u00cen localitate avem doi medici de familie, iar dup\u0103 modernizare vrem s\u0103 facem loc \u0219i pentru stomatologie, pentru c\u0103 exist\u0103 aceast\u0103 cerere din partea oamenilor<\/em><\/strong>\u201d, a declarat primarul Gheorghe Dumbrav\u0103.<\/p>\n<p>Lucrarea de la dispensar este, \u00een acest an, unul dintre pu\u021binele proiecte care pot fi duse mai departe, deoarece finan\u021barea vine din fonduri externe. Prim\u0103ria trebuie s\u0103 asigure partea sa de contribu\u021bie, \u00eens\u0103 grosul banilor nu vine din bugetul local. Acest lucru conteaz\u0103 mult, deoarece resursele proprii sunt limitate, iar administra\u021bia are de pl\u0103tit datorii r\u0103mase din anul trecut.<\/p>\n<p>Primarul spune c\u0103 \u0219i-ar fi dorit s\u0103 mai poat\u0103 prinde c\u00e2teva str\u0103du\u021be pentru betonare, dar anul acesta bugetul nu permite lucr\u0103ri noi din bani locali. Prioritatea este plata obliga\u021biilor vechi \u0219i asigurarea func\u021bion\u0103rii serviciilor de baz\u0103:\u201e<strong>Noi ne-am mai fi dorit \u0219i alte lucr\u0103ri. Mai avem c\u00e2teva str\u0103du\u021be de betonat, dar anul acesta nu ne putem \u00eentinde mai mult dec\u00e2t ne permite bugetul. Proiectul de la dispensar se va face pentru c\u0103 are finan\u021bare extern\u0103. Din bugetul local nu pot s\u0103 pun acum investi\u021bii noi, pentru c\u0103 trebuie s\u0103 v\u0103d cum achit\u0103m datoriile care s-au str\u00e2ns<\/strong>\u201d, a spus Gheorghe Dumbrav\u0103.<\/p>\n<p><strong><u>Drumul spre M\u0103n\u0103stirea Jgheaburi, \u00een c\u0103utarea unei finan\u021b\u0103ri pentru modernizare<\/u><\/strong><\/p>\n<p>O alt\u0103 problem\u0103 mare pentru Stoene\u0219ti este <strong><u>drumul care urc\u0103 din Dealul Crucii spre M\u0103n\u0103stirea Jgheaburi<\/u><\/strong>. Este vorba despre un traseu de 3,4 kilometri, trecut \u00een administrarea Prim\u0103riei Stoene\u0219ti de aproximativ doi ani. Drumul a fost clasificat anterior ca drum forestier \u0219i a ajuns la prim\u0103rie dup\u0103 ce finan\u021barea prin Anghel Saligny fusese deja \u00eenchis\u0103. Din acest motiv, administra\u021bia local\u0103 nu a mai putut s\u0103 \u00eel includ\u0103 la timp \u00eentr-un proiect de asfaltare sau betonare.<\/p>\n<p>Drumul are acum denumirea DC 208. El este folosit de m\u0103icu\u021bele de la m\u0103n\u0103stire, de oamenii care merg la slujbe \u0219i de utilaje grele din zona de exploatare forestier\u0103. Tocmai aceste utilaje fac lucrurile mai dificile. Chiar dac\u0103 prim\u0103ria niveleaz\u0103 traseul cu autogrederul, dup\u0103 trecerea ma\u0219inilor mari, drumul se stric\u0103 din nou.<\/p>\n<p>\u201e<strong><em>Avem de vreo doi ani \u00een administrare \u0219i drumul din Dealul Crucii p\u00e2n\u0103 la M\u0103n\u0103stirea Jgheaburi, pe o lungime de 3,4 kilometri. A fost un drum clasificat ca forestier. A trecut din administrarea Consiliului Jude\u021bean \u00een administrarea prim\u0103riei, dar l-am primit dup\u0103 ce s-a \u00eenchis finan\u021barea prin Anghel Saligny. Acum trebuie s\u0103 g\u0103sim alt\u0103 surs\u0103 de bani. Drumul este foarte greu. Am \u00eencercat s\u0103 \u00eel amenaj\u0103m c\u00e2t de c\u00e2t, dar acolo este o problem\u0103 mare. Dac\u0103 \u00eel aranj\u0103m ast\u0103zi cu autogrederul, trec ma\u0219inile mari cu lemne, pentru c\u0103 \u00een zon\u0103 se exploateaz\u0103 lemn, \u0219i utilajele grele \u00eel stric\u0103 din nou<\/em><\/strong>\u201d, a explicat primarul.<\/p>\n<p>Gheorghe Dumbrav\u0103 spune c\u0103 \u00een\u021belege nemul\u021bumirile oamenilor \u0219i ale celor care merg la M\u0103n\u0103stirea Jgheaburi, dar sus\u021bine c\u0103 solu\u021bia real\u0103 nu poate veni f\u0103r\u0103 o finan\u021bare solid\u0103. O interven\u021bie simpl\u0103 nu rezist\u0103 prea mult, deoarece traficul greu rupe repede drumul.<\/p>\n<p>\u201e<strong><em>Mie \u00eemi pare r\u0103u de m\u0103icu\u021bele care slujesc la aceast\u0103 m\u0103n\u0103stire, dar \u0219i de credincio\u0219ii care merg acolo, pentru c\u0103 drumul nu este bun. Eu sunt un om care nu las\u0103 lucrurile, dar cu acest drum nu \u0219tiu c\u00e2t de repede pot rezolva problema. Finan\u021b\u0103rile s-au \u00eenchis. \u0218tiu c\u0103 nevoile sunt mari. \u0218tiu c\u0103 sunt \u0219i critici. Dac\u0103 reu\u0219eam s\u0103 \u00eel lu\u0103m \u00een administrare odat\u0103 cu deschiderea programului Anghel Saligny, ast\u0103zi era altfel. Puteam s\u0103 \u00eel asfalt\u0103m sau s\u0103 \u00eel beton\u0103m. I-am dat denumirea de drum comunal DC 208, dar acum trebuie s\u0103 g\u0103sim o surs\u0103 de finan\u021bare<\/em><\/strong>\u201d, a mai spus primarul comunei Stoene\u0219ti.<\/p>\n<p><strong><u>Gaze: aviz primit, traseu nou stabilit<\/u><\/strong><\/p>\n<p>Pe lista proiectelor importante r\u0103m\u00e2ne \u0219i introducerea gazelor. Prim\u0103ria a primit avizul de la Transgaz, iar solu\u021bia tehnic\u0103 indic\u0103 o racordare din zona Tom\u0219ani, de la limita dintre Tom\u0219ani \u0219i Coste\u0219ti. Ini\u021bial, varianta luat\u0103 \u00een calcul era conectarea dinspre P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, dar traseul trebuie modificat \u00een func\u021bie de noua solu\u021bie transmis\u0103 de Transgaz;<\/p>\n<p>\u201e<strong><em>Am primit avizul \u0219i de la Transgaz pentru proiectul de gaze. Cu ADI suntem \u00een c\u0103r\u021bi, a\u0219 putea spune. Ne vom lega de la Tom\u0219ani, de la limita dintre Tom\u0219ani \u0219i Coste\u0219ti. Aceasta este solu\u021bia pe care ne-a dat-o Transgaz. Noi am avut la \u00eenceput conectarea de la P\u0103u\u0219e\u0219ti M\u0103gla\u0219i, dar acum proiectantul lucreaz\u0103 la schimbarea traseului<\/em><\/strong>\u201d, a precizat Gheorghe Dumbrav\u0103.<\/p>\n<p><strong><u>Buget sub presiune<\/u><\/strong><\/p>\n<p>Dincolo de proiecte, marea problem\u0103 a administra\u021biei din Stoene\u0219ti r\u0103m\u00e2ne bugetul. Primarul spune c\u0103 sumele primite nu pot acoperi datoriile existente. Cea mai grea restan\u021b\u0103 vine de la plata drepturilor pentru persoanele cu dizabilit\u0103\u021bi. Reamintim c\u0103 Prim\u0103ria are de achitat 600.000 de lei din anul trecut, dup\u0103 ce num\u0103rul beneficiarilor a crescut mult fa\u021b\u0103 de situa\u021bia transmis\u0103 \u00een luna septembrie.<\/p>\n<p>Acesta spune c\u0103 situa\u021bia s-a schimbat mult \u00eentre luna septembrie \u0219i finalul anului trecut. Num\u0103rul persoanelor cu dizabilit\u0103\u021bi a crescut, dar alocarea a r\u0103mas la nivelul vechi.<\/p>\n<p>\u201e<strong><em>\u00cen luna septembrie, c\u00e2nd am transmis ce datorii avem \u0219i c\u00e2te persoane cu dizabilit\u0103\u021bi sunt \u00een comun\u0103, aveam 72 de persoane. Numai c\u0103 anul 2025 s-a \u00eencheiat cu 96 de persoane. A\u0219a am r\u0103mas cu datorie. Suma primit\u0103 anul acesta pentru persoanele cu dizabilit\u0103\u021bi este ca anul trecut, tot de 25 de miliarde de lei vechi, chiar dac\u0103 acum avem 96 de persoane. Mai mult dec\u00e2t at\u00e2t, anul acesta avem deja patru cereri pentru asisten\u021bi personali. P\u00e2n\u0103 acum nu am avut asisten\u021bi personali \u00eenregistra\u021bi la prim\u0103rie, dar de anul acesta nu mai pot evita aceast\u0103 situa\u021bie, pentru c\u0103 sunt persoane care au cu adev\u0103rat nevoie de ajutor. Ace\u0219ti asisten\u021bi vor avea contract de munc\u0103 \u0219i toate drepturile prev\u0103zute de lege<\/em><\/strong>\u201d, a mai spus Gheorghe Dumbrav\u0103.<\/p>\n<p>A\u0219adar, la Stoene\u0219ti, dispensarul medical poate intra \u00een modernizare datorit\u0103 fondurilor europene. Drumul spre M\u0103n\u0103stirea Jgheaburi are nevoie de o finan\u021bare separat\u0103, deoarece lucr\u0103rile simple nu rezist\u0103 traficului greu. Proiectul de gaze are aviz de la Transgaz \u0219i intr\u0103 \u00eentr-o etap\u0103 tehnic\u0103 nou\u0103, prin schimbarea traseului.<\/p>\n<p>\u00cen acela\u0219i timp, prim\u0103ria trebuie s\u0103 achite datorii vechi \u0219i s\u0103 asigure bani pentru persoanele cu dizabilit\u0103\u021bi, \u00eentr-un an \u00een care fondurile primite nu \u021bin ritmul cu nevoile reale din localitate.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/04\/24\/primarul-din-stoenesti-despre-dispensar-drumuri-si-buget-nici-nu-ma-gandesc-la-investitii-din-bugetul-local-anul-acesta\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2017\/02\/FOTO-PRIMAR-DUMBRAVA-scaled.jpg&#8221;] 24 aprilie 2026Claudia SchiopuAdministra\u0163ieStoene\u0219ti La Stoene\u0219ti, prim\u0103ria are proiecte importante pe mas\u0103, dar are \u0219i datorii care apas\u0103 bugetul local. Cea mai avansat\u0103 lucrare este modernizarea dispensarului, un proiect realizat cu bani europeni, aflat acum \u00een procedur\u0103 de licita\u021bie. Cl\u0103direa va fi consolidat\u0103, va primi o structur\u0103 mai sigur\u0103, un acoperi\u0219 nou, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-1901946","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1901946","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1901946"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1901946\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1901946"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1901946"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1901946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}