{"id":1894189,"date":"2026-04-21T05:51:02","date_gmt":"2026-04-21T02:51:02","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1894189"},"modified":"2026-04-21T05:51:02","modified_gmt":"2026-04-21T02:51:02","slug":"bate-vantul-peste-pasajul-de-la-fabrica-de-zahar-la-timisoara-la-un-an-de-la-semnarea-contractului-cu-constructorul-modernizarea-e-inca-pe-hartie-primaria-i-a-dat-sa-faca-si-podul-solventul","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1894189","title":{"rendered":"Bate v\u00e2ntul peste Pasajul de la Fabrica de Zah\u0103r la Timi\u0219oara. La un an de la semnarea contractului cu constructorul, modernizarea e \u00eenc\u0103 pe h\u00e2rtie. Primaria i-a dat s\u0103 fac\u0103 si Podul Solventul"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.opiniatimisoarei.ro\/wp-content\/uploads\/2024\/09\/pasaj-slavici-polona-fabrica-de-zahar-2-728&#215;336.jpghttps:\/\/www.opiniatimisoarei.ro\/wp-content\/uploads\/2024\/09\/pasaj-slavici-polona-fabrica-de-zahar-2.jpg&#8221;]<\/p>\n<div class=\"the_content\">\n<p><strong>TIMI\u0218OARA<\/strong>. \u00cen urm\u0103 cu exact un an, \u00een aprilie 2025, <a href=\"https:\/\/www.opiniatimisoarei.ro\/avem-constructor-pentru-pasajul-slavici-polona-la-timisoara-unde-vor-fi-puse-si-linii-pentru-tramvaiul-3-modernizarea-de-aproape-12-milioane-de-euro-trebuie-sa-dureze-un-an-si-jumatate\/07\/04\/2025\"><strong>Prim\u0103ria Timi\u0219oara anun\u021b\u0103 c\u0103 a semnat contractul cu constructorul<\/strong><\/a> care va moderniza Pasajul Ioan Slavici, care leag\u0103 zona Polon\u0103 de ora\u0219 la Fabrica de Zah\u0103r.<\/p>\n<p>Pentru aceast\u0103 investi\u021bie de aproape 12 milioane de euro, asocierea care a c\u00e2\u0219tigat licita\u021bia, condusa de FREYROM SA, are termen 18 luni, proiectare + execu\u021bie din momentul ordinului de \u00eencepere a lucr\u0103rilor.<\/p>\n<p>La un an distan\u021b\u0103 de la isc\u0103lirea contractului, \u00eenc\u0103 se adun\u0103 avize. Prim\u0103ria Timi\u0219oara n-a emis nici acum Autoriza\u021bia de Construire pentru proiect.<\/p>\n<p><span class=\"dia_suggestion w0\">Mai<\/span><span class=\"dia_suggestion w1\">mult<\/span>, luni, <span class=\"dia_suggestion w3\">administra\u021bia<\/span> Fritz a <span class=\"dia_suggestion w6\">anun\u021bat<\/span><span class=\"dia_suggestion w7\">c\u0103<\/span> o asociere <span class=\"dia_suggestion w10\">condus\u0103<\/span><span class=\"dia_suggestion w11\">tot<\/span> de FREYROM <span class=\"dia_suggestion w14\">SA<\/span>\u00a0<a href=\"https:\/\/www.opiniatimisoarei.ro\/primaria-timisoara-anunta-constructorul-pentru-podul-solventul-si-o-parte-din-drumul-spre-cartierul-dambovita-in-2-ani-trebuie-sa-fie-gata\/20\/04\/2026\"><strong>a <span class=\"dia_suggestion w16\">c\u00e2\u0219tigat<\/span><span class=\"dia_suggestion w17\">\u0219i<\/span><span class=\"dia_suggestion w18\">licita\u021bia<\/span> pentru Podul Solventul<\/strong>.<\/a><\/p>\n<p>\u201c<strong>Suntem \u00een etap\u0103 final\u0103 de autorizare a lucr\u0103rilor pentru pasajul Slavici \u2013 Polon\u0103, dup\u0103 o serie de complet\u0103ri necesare pentru drumul provizoriu care va fi folosit pe durata \u0219antierului. Odat\u0103 emis\u0103 autoriza\u021bia, cel mai probabil spre final de lun\u0103, vor putea demara lucr\u0103rile de reconstruc\u021bie la cele trei pasaje care alc\u0103tuiesc nodul rutier<\/strong>\u201c, a spus pentru <span><strong>opiniatimisoarei.ro<\/strong><\/span> Silvana Andrea\u0219, purtator de cuv\u00e2nt al Prim\u0103riei Timisoara.<\/p>\n<p>\u00a0<\/p>\n<iframe loading=\"lazy\" title=\"Pasajul Slavici-Polon\u0103 (1982) - Stare tehnic\u0103 \u00een 2025\" width=\"728\" height=\"410\" src=\"https:\/\/www.youtube.com\/embed\/V9fblrRhfeQ?feature=oembed&amp;wmode=opaque&amp;rel=0\" frameborder allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<p>Potrivit proiectului, practic, 3 segmente de pasaj rutier trebuie reabilitate, suprastructurile actuale demolate \u0219i reconstruite. Este vorba de cel cu o singur\u0103 deschidere, pe strada Ovidiu Cotru\u015f, care supratraverseaz\u0103 linia de cale ferat\u0103, cel de pe strada Wilhelm Tell, tot cu o singur\u0103 deschidere, care supratraverseaz\u0103 strada Polon\u0103 \u00een zona buclei, \u0219i pasajul cu patru deschideri, situat tot pe strada Wilhelm Tell, care supratraverseaz\u0103 calea ferat\u0103 dezafectat\u0103.<\/p>\n<p>Constructorul trebuie s\u0103 reconfigureze carosabilul, s\u0103 instaleze linie dubl\u0103 de tramvai, pentru ca \u00een viitor s\u0103 poat\u0103 fi reluat transportul public spre Freidorf pe linia 3, s\u0103 realizeze trotuare \u0219i s\u0103 modernizeze re\u021belele de utilit\u0103\u021bi \u0219i iluminatul public \u0219i s\u0103 amenajeze piste de biciclete \u0219i spa\u021bii verzi. Pentru acestea este prev\u0103zut\u0103 plantarea de arbori \u00een zon\u0103, 330 de frasini de c\u00e2mp, 331 de exemplare de cer \u0219i al\u021bi 331 de ulmi de c\u00e2mp.<\/p>\n<p>Pentru lucr\u0103ri, asocierea Freyrom (lider), Procons Group, Inginerie Drumuri \u0219i Poduri \u0219i Integrated Road Solutions va primi 49.065.000 lei (f\u0103r\u0103 TVA), adic\u0103 aproape 12 milioane de euro cu TVA.<\/p>\n<p>***<\/p>\n<p><strong><span class=\"dia_suggestion w0\">Mai<\/span><span class=\"dia_suggestion w1\">multe<\/span><span class=\"dia_suggestion w2\">g\u0103si\u021bi<\/span> pe <span class=\"dia_suggestion w4\">pagina noastr<span class=\"dia_suggestion w0\">\u0103<\/span><\/span>\u00a0de <a href=\"https:\/\/www.facebook.com\/OpiniaTM\/?ref=page_internal\" target=\"_blank\" rel=\"noopener\">Facebook opiniatimisoarei.ro<\/a>!<\/strong><\/p>\n<p><strong><span class=\"dia_suggestion w0\">Dac\u0103<\/span><span class=\"dia_suggestion w1\">a\u021bi<\/span> fost martorii unui eveniment <span class=\"dia_suggestion w6\">sau<\/span><span class=\"dia_suggestion w7\">ai<\/span> unei <span class=\"dia_suggestion w9\">situa\u021bii<\/span><span class=\"dia_suggestion w10\">neobi\u0219nuite<\/span><span class=\"dia_suggestion w11\">care<\/span> ar <span class=\"dia_suggestion w13\">putea<\/span> deveni subiect de <span class=\"dia_suggestion w17\">\u0219tire<\/span>, <span class=\"dia_suggestion w18\">contacta\u021bi<\/span>-ne <span class=\"dia_suggestion w20\">la<\/span><span><a href=\"https:\/\/www.opiniatimisoarei.ro\/cdn-cgi\/l\/email-protection\" class=\"__cf_email__\" data-cfemail=\"433126272220372a26032c332a2d2a22372a2e2a302c2231262a6d312c\">[email\u00a0protected]<\/a>,<\/span>\u00a0 pe <a href=\"https:\/\/www.facebook.com\/OpiniaTM\">FB<\/a><span>sau pe contul nostru de<\/span><a href=\"https:\/\/www.instagram.com\/opiniatimisoarei.ro\/\" target=\"_blank\" rel=\"noopener\">Instagram<\/a>!<\/strong><\/p>\n<p><strong><span>CITESTE SI<\/span>: <a href=\"https:\/\/www.opiniatimisoarei.ro\/afli-primul-tot-ceea-ce-se-intampla-cu-adevarat-important-in-timisoara-si-in-regiune-cu-aplicatia-de-stiri-opinia-timisoarei-3-tipuri-de-alerte-te-tin-mereu-conectat-la-evenimente-descarca-gratuit-a\/31\/10\/2022\">Afli primul tot ceea ce se intampla cu adevarat important in Timisoara si in regiune cu Aplicatia de stiri Opinia Timisoarei. 3 tipuri de alerte te tin mereu conectat la evenimente. Descarca gratuit Aplicatia OT aici!<\/a><\/strong><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.opiniatimisoarei.ro\/bate-vantul-peste-pasajul-de-la-fabrica-de-zahar-la-timisoara-la-un-an-de-la-semnarea-contractului-cu-constructorul-modernizarea-e-inca-pe-hartie-primaria-i-a-dat-sa-faca-si-podul-solventul\/21\/04\/2026&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.opiniatimisoarei.ro\/wp-content\/uploads\/2024\/09\/pasaj-slavici-polona-fabrica-de-zahar-2-728&#215;336.jpghttps:\/\/www.opiniatimisoarei.ro\/wp-content\/uploads\/2024\/09\/pasaj-slavici-polona-fabrica-de-zahar-2.jpg&#8221;] TIMI\u0218OARA. \u00cen urm\u0103 cu exact un an, \u00een aprilie 2025, Prim\u0103ria Timi\u0219oara anun\u021b\u0103 c\u0103 a semnat contractul cu constructorul care va moderniza Pasajul Ioan Slavici, care leag\u0103 zona Polon\u0103 de ora\u0219 la Fabrica de Zah\u0103r. Pentru aceast\u0103 investi\u021bie de aproape 12 milioane de euro, asocierea care a c\u00e2\u0219tigat licita\u021bia, condusa de FREYROM [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,190],"class_list":["post-1894189","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-opiniatimisoarei-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1894189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1894189"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1894189\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1894189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1894189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1894189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}