{"id":1893250,"date":"2026-04-20T12:24:51","date_gmt":"2026-04-20T09:24:51","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1893250"},"modified":"2026-04-20T12:24:51","modified_gmt":"2026-04-20T09:24:51","slug":"podul-solventul-are-constructor-desemnat-urmeaza-semnarea-contractului","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1893250","title":{"rendered":"Podul Solventul are constructor desemnat! Urmeaza semnarea contractului"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-1-e1776688944650.jpg&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Avanseaz\u0103 unul dintre cele mai importante proiecte ale Prim\u0103riei Timi\u0219oara. Institu\u021bia anun\u021b\u0103 c\u0103 a desemnat asocierea de constructori care va realiza Podul Solventul, \u00een urma licita\u021biei. A\u0219adar, Prim\u0103ria Timi\u0219oara va semna contractul cu asocierea FREYROM SA (lider) \u0219i PROCONS GROUP SRL (asociat). Investi\u021bia include primul pod construit peste Bega de la zero dup\u0103 Revolu\u021bie care, \u00eempreun\u0103 cu Pasajul Solventul \u0219i un drum de leg\u0103tur\u0103 peste fosta platform\u0103 industrial\u0103, va conecta Bulevardul D\u00e2mbovi\u021ba de Calea Bogd\u0103ne\u0219tilor.<\/p>\n<p><em>\u201eE al doilea pod unde \u00eencepem lucr\u0103rile \u00een aceast\u0103 prim\u0103var\u0103, dup\u0103 podul de la fosta Fabric\u0103 de \u021big\u0103ri. A fost un drum lung, uneori exasperant \u0219i frustrant: documenta\u021bii complexe, mult\u0103 birocra\u021bie, perioade lungi de avizare, exproprieri ale unor terenuri private, atragerea de 18 milioane de euro bani europeni. O munc\u0103 uria\u0219\u0103, imposibil de f\u0103cut f\u0103r\u0103 efortul coordonat al echipelor din Prim\u0103rie, c\u0103rora le mul\u021bumesc. Leg\u0103tura de la Solventul \u2013 pasajul \u0219i podul \u2013 sunt a\u0219teptate de decenii de timi\u0219oreni \u0219i m\u0103 bucur c\u0103 \u00een sf\u00e2r\u0219it se \u00eent\u00e2mpl\u0103\u201d<\/em>, a afirmat primarul Dominic Fritz.<\/p>\n<p>Podul Solventul face parte din Inelul IV Vest, una dintre arterele esen\u021biale pentru fluidizarea traficului \u00een ora\u0219. Cu linie dubl\u0103 de tramvai, patru benzi de circula\u021bie, piste pentru biciclete, trotuare largi \u0219i spa\u021bii verzi, investi\u021bia Prim\u0103riei Timi\u0219oara va contribui la reducerea traficului din zona central\u0103 \u0219i la \u00eembun\u0103t\u0103\u021birea mobilit\u0103\u021bii urbane. Proiectul include \u0219i reconfigurarea intersec\u021biei cu Bulevardul D\u00e2mbovi\u021ba, precum \u0219i conectarea la pistele de biciclet\u0103 de pe malul Beg\u0103i.<\/p>\n<p>Contractul a fost atribuit pentru suma de 96 milioane lei, cu TVA, iar termenul de realizare a lucr\u0103rilor este de 24 de luni de la emiterea ordinului de \u00eencepere. Valoarea total\u0103 a investi\u021biei este de 133,5 milioane de lei, dintre care 93 de milioane de lei provin din fonduri europene nerambursabile, prin Programul Regional Vest 2021\u20132027.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-183394 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-2-e1776688917943.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-2-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-2-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-3-e1776688902796.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-4-e1776688883408.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-4-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-4-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-5-e1776688868818.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-5-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-5-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/podul-solventul-are-constructor-desemnat-urmeaza-semnarea-contractului\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/podul-solventul-1-e1776688944650.jpg&#8221;] Avanseaz\u0103 unul dintre cele mai importante proiecte ale Prim\u0103riei Timi\u0219oara. Institu\u021bia anun\u021b\u0103 c\u0103 a desemnat asocierea de constructori care va realiza Podul Solventul, \u00een urma licita\u021biei. A\u0219adar, Prim\u0103ria Timi\u0219oara va semna contractul cu asocierea FREYROM SA (lider) \u0219i PROCONS GROUP SRL (asociat). Investi\u021bia include primul pod construit peste Bega de la zero [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-1893250","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1893250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1893250"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1893250\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1893250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1893250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1893250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}