{"id":1892059,"date":"2026-04-20T09:00:02","date_gmt":"2026-04-20T06:00:02","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1892059"},"modified":"2026-04-20T09:00:02","modified_gmt":"2026-04-20T06:00:02","slug":"foto-podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1892059","title":{"rendered":"FOTO. Podul Solventul, \u201eprimul construit de la zero dup\u0103 Revolu\u021bie\u201d are constructor"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2022\/09\/+otf\/1200&#215;630\/qnfNojsBbneC7VJn9eg0ok5PVF9WRVJZX1NFQ9fmmPWDYsIHFOok3Nk7kgx2eY7DU7nFXq7HAboJeTCAiit8OjWs+f99OT+Ow2MPj6BkKaNgPJbB6qNmOaEBV6Y=\/2887125podsolventulproiect3.jpg&#8221;]<\/p>\n<article id=\"post-2264137\" class>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Podul Solventul, <em>\u201eprimul pod construit peste Bega de la zero dup\u0103 Revolu\u021bie\u201d<\/em> dup\u0103 cum se laud\u0103 prim\u0103ria, are constructor. \u00cen urma licita\u021biei, municipalitatea a desemnat asocierea FREYROM SA (lider) \u2013 PROCONS GROUP SRL (asociat) drept c\u00e2\u0219tig\u0103toare \u0219i urmeaz\u0103, dup\u0103 perioada \u00een care \u00eenc\u0103 se pot depune contesta\u021bii, s\u0103 semneze contractul.<\/p>\n<blockquote>\n<p>\u201eE al doilea pod unde \u00eencepem lucr\u0103rile \u00een aceast\u0103 prim\u0103var\u0103, dup\u0103 podul de la fosta Fabric\u0103 de \u021big\u0103ri. A fost un drum lung, uneori exasperant \u0219i frustrant: documenta\u021bii complexe, mult\u0103 birocra\u021bie, perioade lungi de avizare, exproprieri ale unor terenuri private, atragerea de 18 milioane de euro bani europeni. O munc\u0103 uria\u0219\u0103, imposibil de f\u0103cut f\u0103r\u0103 efortul coordonat al echipelor din Prim\u0103rie, c\u0103rora le mul\u021bumesc. Leg\u0103tura de la Solventul \u2013 pasajul \u0219i podul \u2013 sunt a\u0219teptate de decenii de timi\u0219oreni \u0219i m\u0103 bucur c\u0103 \u00een sf\u00e2r\u0219it se \u00eent\u00e2mpl\u0103\u201d, a spus primarul Dominic Fritz.<\/p>\n<\/blockquote>\n<p>Contractul a fost atribuit pentru suma de 96 de milioane de lei, cu TVA. Termenul de realizare a lucr\u0103rilor este de 24 de luni de la emiterea ordinului de \u00eencepere. Valoarea total\u0103 a investi\u021biei este de 133,5 milioane de lei, majoritatea, 93 de milioane de lei, provenind din fonduri europene nerambursabile, prin Programul Regional Vest 2021\u20132027.<\/p>\n<div class=\"enews_gallery_holder\">\n<div class=\"ml-gallery\"><a href=\"https:\/\/www.tion.ro\/galeria\/randari-solventul\/\" class=\"ml-gallery-link\"><img loading=\"lazy\" decoding=\"async\" class=\"hrrZaB lazyload ml-gallery-cover\" src=\"https:\/\/www.tion.ro\/wp-content\/plugins\/endless-core\/images\/1x1.png\" width=\"155\" height=\"100\" data-src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/66768136783655311485163872979091845794281883077830n.jpg\" data-srcset=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/+otf\/839x538\/HhuukC2+VRu+sSmlJnD6fE5PVF9WRVJZX1NFQ__5a1Q3H7bMqXCRTYjpF3WjWgsQVyIW__h7dUEjppTtfiwW7uDTTM6FpCwdR6CmfPRzOMU5Y__9y1O0mdFzXLdP1s=\/66768136783655311485163872979091845794281883077830n.jpg 839w,https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/+otf\/100w\/R5vRKgFGM5CNCVWX7d__cyE5PVF9WRVJZX1NFQ__5a1Q3H7bMqXCRTYjpF3WjWgN0bk96nj7YRQzQpfqf6gDe0VyzH715CwdR6CmfCRzOMU5Y__9y1O0mdFzXLdP1s=\/66768136783655311485163872979091845794281883077830n.jpg 100w\" data-sizes=\"auto\"><\/p>\n<p class=\"wp-caption-text-gallery\">Rand\u0103ri Solventul<\/p>\n<p><\/a><\/div>\n<\/div>\n<p>foto: Facebook\/Dominic Fritz<\/p>\n<h3><strong>Linie dubl\u0103 de tramvai, patru benzi de circula\u021bie, piste \u0219i trotuare<\/strong><\/h3>\n<p>\u00cempreun\u0103 cu Pasajul Solventul \u0219i drumul de leg\u0103tur\u0103 peste fosta platform\u0103 industrial\u0103, Podul va lega bulevardul D\u00e2mbovi\u021ba de Calea Bogd\u0103ne\u0219tilor, ca parte a din inelul IV de trafic.<\/p>\n<p>Proiectul prevede linie dubl\u0103 de tramvai, patru benzi de circula\u021bie, piste pentru biciclete, trotuare largi \u0219i spa\u021bii verzi. \u00cen plus, va fi reconfigurat\u0103 intersec\u021bia cu bulevardul D\u00e2mbovi\u021ba, iar pistele de pod vor fi contectate cu cele de pe malul Beg\u0103i.<\/p>\n<p>V\u0103 amintim, o bun\u0103 parte a terenului din zona fostului combinat Solventul este contaminat chimic, dup\u0103 cum <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/terenul-contaminat-de-la-solventul-un-obstacol-in-calea-pasajului-fritz-este-nevoie-de-solutii-si-actiuni-1703758\/\" target=\"_blank\" rel=\"noopener\">au anun\u021bat reprezentan\u021bii Agen\u021biei pentru Protec\u021bia Mediului \u00een aprilie 2023<\/a><\/strong>. Atunci, analiza fusese cerut\u0103 de un dezvoltator imobiliar, dar era afectat\u0103 inclusiv por\u021biunea pe care dorea prim\u0103ria s\u0103 fac\u0103 podul. \u00cen august 2024, \u00eens\u0103, reprezentan\u021bii prim\u0103riei au anun\u021bat c\u0103 <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/incep-exproprierile-terenurilor-de-la-viitorul-pod-solventul-1918566\/\" target=\"_blank\" rel=\"noopener\">a fost g\u0103sit\u0103 o solu\u021bie<\/a><\/strong> \u0219i au \u00eenceput exproprierile.<\/p>\n<p><em>\u201ePrimul pod construit peste Bega dup\u0103 mai bine de 30 de ani\u201d<\/em>, are studiul de fezabilitate aprobat <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/valoarea-podului-solventul-necesar-pentru-inchiderea-inelului-iv-vest-estimata-la-peste-40-de-milioane-de-euro-1747024\/\" target=\"_blank\" rel=\"noopener\">din august 2024<\/a><\/strong>. \u00cen iulie 2025, Prim\u0103ria Timi\u0219oara <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/finantare-europeana-de-aproape-20-de-milioane-de-euro-pentru-podul-solventul-2095494\/\" target=\"_blank\" rel=\"noopener\">a ob\u021binut \u0219i finan\u021barea european\u0103 pentru noul proiect<\/a><\/strong>. \u00cen septembrie, municipalitatea a lansat \u0219i licita\u021bia pentru<strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/start-la-licitatie-podul-solventul-va-lega-strada-garii-de-bulevardul-dambovita-pentru-peste-100-de-milioane-de-lei-2135280\/\" target=\"_blank\" rel=\"noopener\"><em> \u201eExecu\u021bie lucr\u0103ri aferente obiectivului de investi\u0163ii \u00abC9b Inelul IV Vest: conexiunea Str. G\u0103rii \u2013 Bd. D\u00e2mbovi\u0163a, ETAPA 1- Lucr\u0103ri de drumuri, poduri, linii de tramvai\u00bb\u201d <\/em><\/a><\/strong>la o valoare estimat\u0103 de peste 120 de milioane de lei, cu TVA.<\/p>\n<p>Practic, lucr\u0103rile din aceast\u0103 etap\u0103 includ construc\u021bia unui drum nou \u00eentre str. G\u0103rii \u015fi Bd. D\u00e2mbovi\u0163a, pe terenul fostei platforme industriale Solventul, \u2013 construc\u0163ia noului Pod Solventul, l\u0103rgirea \u0219i dotarea cu linie de tramvai a bulevardului D\u00e2mbovi\u0163a pe o lungime de aproximativ 200 de metri \u0219i construirea de piste pentru biciclete \u0219i trotuare, pe toat\u0103 lungimea drumului nou construit, adic\u0103 de la Pasajul Solventul p\u00e2n\u0103 la strada Ion Barac.<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/licitatie-pmt\" rel=\"tag\"><span class=\"link\">licitatie pmt<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/podul-solventul\" rel=\"tag\"><span class=\"link\">podul solventul<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/pr-vest-2021-2027\" rel=\"tag\"><span class=\"link\">PR VEST 2021 &#8211; 2027<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">3<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<div id=\"forum\">\n<li class=\"comment even thread-even depth-1 parent\" id=\"comment-971359\">\n<div id=\"div-comment-971359\" class=\"comment-body\">\n<div class=\"comment-author vcard\"><img decoding=\"async\" alt src=\"https:\/\/secure.gravatar.com\/avatar\/cc546afc242f2453193a60d3e5b30d30?s=32&amp;d=mm&amp;r=g\" class=\"avatar avatar-32 photo\" height=\"32\" width=\"32\" loading=\"lazy\"><cite class=\"fn\">Alexander<\/cite><span class=\"says\">says:<\/span><\/div>\n<div class=\"comment-meta commentmetadata\"><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971359\">April 20, 2026 at 12:21 pm<\/a><\/div>\n<p>Sta\u021bi c\u0103 urmeaz\u0103 contesta\u021biile<\/p>\n<div class=\"reply\"><a rel=\"nofollow\" class=\"comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971359\" data-commentid=\"971359\" data-postid=\"2264137\" data-belowelement=\"div-comment-971359\" data-respondelement=\"respond\" data-replyto=\"Reply to Alexander\" aria-label=\"Reply to Alexander\">Reply<\/a><\/div>\n<\/div>\n<ul class=\"children\">\n<li class=\"comment odd alt depth-2\" id=\"comment-971437\">\n<div id=\"div-comment-971437\" class=\"comment-body\">\n<div class=\"comment-author vcard\"><img decoding=\"async\" alt src=\"https:\/\/secure.gravatar.com\/avatar\/d71f5711f058f90917a193a1cddb25c1?s=32&amp;d=mm&amp;r=g\" class=\"avatar avatar-32 photo\" height=\"32\" width=\"32\" loading=\"lazy\"><cite class=\"fn\">Romania<\/cite><span class=\"says\">says:<\/span><\/div>\n<div class=\"comment-meta commentmetadata\"><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971437\">April 20, 2026 at 12:58 pm<\/a><\/div>\n<p>@Alexander: alea se judeca rapid! Mai mult dureaza pana se depun (daca se depun)!<\/p>\n<div class=\"reply\"><a rel=\"nofollow\" class=\"comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971437\" data-commentid=\"971437\" data-postid=\"2264137\" data-belowelement=\"div-comment-971437\" data-respondelement=\"respond\" data-replyto=\"Reply to Romania\" aria-label=\"Reply to Romania\">Reply<\/a><\/div>\n<\/div>\n<\/li>\n<\/ul>\n<\/li>\n<li class=\"comment even thread-odd thread-alt depth-1\" id=\"comment-971407\">\n<div id=\"div-comment-971407\" class=\"comment-body\">\n<div class=\"comment-author vcard\"><img decoding=\"async\" alt src=\"https:\/\/secure.gravatar.com\/avatar\/b41c98f1eca833a730943900772d99fc?s=32&amp;d=mm&amp;r=g\" class=\"avatar avatar-32 photo\" height=\"32\" width=\"32\" loading=\"lazy\"><cite class=\"fn\">MARIA<\/cite><span class=\"says\">says:<\/span><\/div>\n<div class=\"comment-meta commentmetadata\"><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971407\">April 20, 2026 at 12:45 pm<\/a><\/div>\n<p>treziti-v\u0103 la realitate. nu suntem capabili de a\u015fa ceva. Noi doar d\u0103r\u00e2m\u0103m ce au construit p\u0103rin\u0163ii no\u015ftrii pentru c\u0103 nu suntem capabili nici s\u0103 zugr\u0103vim ce au f\u0103cut ei.<\/p>\n<div class=\"reply\"><a rel=\"nofollow\" class=\"comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971407\" data-commentid=\"971407\" data-postid=\"2264137\" data-belowelement=\"div-comment-971407\" data-respondelement=\"respond\" data-replyto=\"Reply to MARIA\" aria-label=\"Reply to MARIA\">Reply<\/a><\/div>\n<\/div>\n<\/li>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Podul Solventul, <em>\u201eprimul pod construit peste Bega de la zero dup\u0103 Revolu\u021bie\u201d<\/em> dup\u0103 cum se laud\u0103 prim\u0103ria, are constructor. \u00cen urma licita\u021biei, municipalitatea a desemnat asocierea FREYROM SA (lider) \u2013 PROCONS GROUP SRL (asociat) drept c\u00e2\u0219tig\u0103toare \u0219i urmeaz\u0103, dup\u0103 perioada \u00een care \u00eenc\u0103 se pot depune contesta\u021bii, s\u0103 semneze contractul.<\/p>\n<blockquote>\n<p>\u201eE al doilea pod unde \u00eencepem lucr\u0103rile \u00een aceast\u0103 prim\u0103var\u0103, dup\u0103 podul de la fosta Fabric\u0103 de \u021big\u0103ri. A fost un drum lung, uneori exasperant \u0219i frustrant: documenta\u021bii complexe, mult\u0103 birocra\u021bie, perioade lungi de avizare, exproprieri ale unor terenuri private, atragerea de 18 milioane de euro bani europeni. O munc\u0103 uria\u0219\u0103, imposibil de f\u0103cut f\u0103r\u0103 efortul coordonat al echipelor din Prim\u0103rie, c\u0103rora le mul\u021bumesc. Leg\u0103tura de la Solventul \u2013 pasajul \u0219i podul \u2013 sunt a\u0219teptate de decenii de timi\u0219oreni \u0219i m\u0103 bucur c\u0103 \u00een sf\u00e2r\u0219it se \u00eent\u00e2mpl\u0103\u201d, a spus primarul Dominic Fritz.<\/p>\n<\/blockquote>\n<p>Contractul a fost atribuit pentru suma de 96 de milioane de lei, cu TVA. Termenul de realizare a lucr\u0103rilor este de 24 de luni de la emiterea ordinului de \u00eencepere. Valoarea total\u0103 a investi\u021biei este de 133,5 milioane de lei, majoritatea, 93 de milioane de lei, provenind din fonduri europene nerambursabile, prin Programul Regional Vest 2021\u20132027.<\/p>\n<div class=\"enews_gallery_holder\">\n<div class=\"ml-gallery\"><a href=\"https:\/\/www.tion.ro\/galeria\/randari-solventul\/\" class=\"ml-gallery-link\"><img loading=\"lazy\" decoding=\"async\" class=\"hrrZaB lazyload ml-gallery-cover\" src=\"https:\/\/www.tion.ro\/wp-content\/plugins\/endless-core\/images\/1x1.png\" width=\"155\" height=\"100\" data-src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/66768136783655311485163872979091845794281883077830n.jpg\" data-srcset=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/+otf\/839x538\/HhuukC2+VRu+sSmlJnD6fE5PVF9WRVJZX1NFQ__5a1Q3H7bMqXCRTYjpF3WjWgsQVyIW__h7dUEjppTtfiwW7uDTTM6FpCwdR6CmfPRzOMU5Y__9y1O0mdFzXLdP1s=\/66768136783655311485163872979091845794281883077830n.jpg 839w,https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/+otf\/100w\/R5vRKgFGM5CNCVWX7d__cyE5PVF9WRVJZX1NFQ__5a1Q3H7bMqXCRTYjpF3WjWgN0bk96nj7YRQzQpfqf6gDe0VyzH715CwdR6CmfCRzOMU5Y__9y1O0mdFzXLdP1s=\/66768136783655311485163872979091845794281883077830n.jpg 100w\" data-sizes=\"auto\"><\/p>\n<p class=\"wp-caption-text-gallery\">Rand\u0103ri Solventul<\/p>\n<p><\/a><\/div>\n<\/div>\n<p>foto: Facebook\/Dominic Fritz<\/p>\n<h3><strong>Linie dubl\u0103 de tramvai, patru benzi de circula\u021bie, piste \u0219i trotuare<\/strong><\/h3>\n<p>\u00cempreun\u0103 cu Pasajul Solventul \u0219i drumul de leg\u0103tur\u0103 peste fosta platform\u0103 industrial\u0103, Podul va lega bulevardul D\u00e2mbovi\u021ba de Calea Bogd\u0103ne\u0219tilor, ca parte a din inelul IV de trafic.<\/p>\n<p>Proiectul prevede linie dubl\u0103 de tramvai, patru benzi de circula\u021bie, piste pentru biciclete, trotuare largi \u0219i spa\u021bii verzi. \u00cen plus, va fi reconfigurat\u0103 intersec\u021bia cu bulevardul D\u00e2mbovi\u021ba, iar pistele de pod vor fi contectate cu cele de pe malul Beg\u0103i.<\/p>\n<p>V\u0103 amintim, o bun\u0103 parte a terenului din zona fostului combinat Solventul este contaminat chimic, dup\u0103 cum <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/terenul-contaminat-de-la-solventul-un-obstacol-in-calea-pasajului-fritz-este-nevoie-de-solutii-si-actiuni-1703758\/\" target=\"_blank\" rel=\"noopener\">au anun\u021bat reprezentan\u021bii Agen\u021biei pentru Protec\u021bia Mediului \u00een aprilie 2023<\/a><\/strong>. Atunci, analiza fusese cerut\u0103 de un dezvoltator imobiliar, dar era afectat\u0103 inclusiv por\u021biunea pe care dorea prim\u0103ria s\u0103 fac\u0103 podul. \u00cen august 2024, \u00eens\u0103, reprezentan\u021bii prim\u0103riei au anun\u021bat c\u0103 <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/incep-exproprierile-terenurilor-de-la-viitorul-pod-solventul-1918566\/\" target=\"_blank\" rel=\"noopener\">a fost g\u0103sit\u0103 o solu\u021bie<\/a><\/strong> \u0219i au \u00eenceput exproprierile.<\/p>\n<p><em>\u201ePrimul pod construit peste Bega dup\u0103 mai bine de 30 de ani\u201d<\/em>, are studiul de fezabilitate aprobat <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/valoarea-podului-solventul-necesar-pentru-inchiderea-inelului-iv-vest-estimata-la-peste-40-de-milioane-de-euro-1747024\/\" target=\"_blank\" rel=\"noopener\">din august 2024<\/a><\/strong>. \u00cen iulie 2025, Prim\u0103ria Timi\u0219oara <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/finantare-europeana-de-aproape-20-de-milioane-de-euro-pentru-podul-solventul-2095494\/\" target=\"_blank\" rel=\"noopener\">a ob\u021binut \u0219i finan\u021barea european\u0103 pentru noul proiect<\/a><\/strong>. \u00cen septembrie, municipalitatea a lansat \u0219i licita\u021bia pentru<strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/start-la-licitatie-podul-solventul-va-lega-strada-garii-de-bulevardul-dambovita-pentru-peste-100-de-milioane-de-lei-2135280\/\" target=\"_blank\" rel=\"noopener\"><em> \u201eExecu\u021bie lucr\u0103ri aferente obiectivului de investi\u0163ii \u00abC9b Inelul IV Vest: conexiunea Str. G\u0103rii \u2013 Bd. D\u00e2mbovi\u0163a, ETAPA 1- Lucr\u0103ri de drumuri, poduri, linii de tramvai\u00bb\u201d <\/em><\/a><\/strong>la o valoare estimat\u0103 de peste 120 de milioane de lei, cu TVA.<\/p>\n<p>Practic, lucr\u0103rile din aceast\u0103 etap\u0103 includ construc\u021bia unui drum nou \u00eentre str. G\u0103rii \u015fi Bd. D\u00e2mbovi\u0163a, pe terenul fostei platforme industriale Solventul, \u2013 construc\u0163ia noului Pod Solventul, l\u0103rgirea \u0219i dotarea cu linie de tramvai a bulevardului D\u00e2mbovi\u0163a pe o lungime de aproximativ 200 de metri \u0219i construirea de piste pentru biciclete \u0219i trotuare, pe toat\u0103 lungimea drumului nou construit, adic\u0103 de la Pasajul Solventul p\u00e2n\u0103 la strada Ion Barac.<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/licitatie-pmt\" rel=\"tag\"><span class=\"link\">licitatie pmt<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/podul-solventul\" rel=\"tag\"><span class=\"link\">podul solventul<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/pr-vest-2021-2027\" rel=\"tag\"><span class=\"link\">PR VEST 2021 &#8211; 2027<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">3<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<div id=\"forum\">\n<li class=\"comment even thread-even depth-1 parent\" id=\"comment-971359\">\n<div id=\"div-comment-971359\" class=\"comment-body\">\n<div class=\"comment-author vcard\"><img decoding=\"async\" alt src=\"https:\/\/secure.gravatar.com\/avatar\/cc546afc242f2453193a60d3e5b30d30?s=32&amp;d=mm&amp;r=g\" class=\"avatar avatar-32 photo\" height=\"32\" width=\"32\" loading=\"lazy\"><cite class=\"fn\">Alexander<\/cite><span class=\"says\">says:<\/span><\/div>\n<div class=\"comment-meta commentmetadata\"><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971359\">April 20, 2026 at 12:21 pm<\/a><\/div>\n<p>Sta\u021bi c\u0103 urmeaz\u0103 contesta\u021biile<\/p>\n<div class=\"reply\"><a rel=\"nofollow\" class=\"comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971359\" data-commentid=\"971359\" data-postid=\"2264137\" data-belowelement=\"div-comment-971359\" data-respondelement=\"respond\" data-replyto=\"Reply to Alexander\" aria-label=\"Reply to Alexander\">Reply<\/a><\/div>\n<\/div>\n<ul class=\"children\">\n<li class=\"comment odd alt depth-2\" id=\"comment-971437\">\n<div id=\"div-comment-971437\" class=\"comment-body\">\n<div class=\"comment-author vcard\"><img decoding=\"async\" alt src=\"https:\/\/secure.gravatar.com\/avatar\/d71f5711f058f90917a193a1cddb25c1?s=32&amp;d=mm&amp;r=g\" class=\"avatar avatar-32 photo\" height=\"32\" width=\"32\" loading=\"lazy\"><cite class=\"fn\">Romania<\/cite><span class=\"says\">says:<\/span><\/div>\n<div class=\"comment-meta commentmetadata\"><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971437\">April 20, 2026 at 12:58 pm<\/a><\/div>\n<p>@Alexander: alea se judeca rapid! Mai mult dureaza pana se depun (daca se depun)!<\/p>\n<div class=\"reply\"><a rel=\"nofollow\" class=\"comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971437\" data-commentid=\"971437\" data-postid=\"2264137\" data-belowelement=\"div-comment-971437\" data-respondelement=\"respond\" data-replyto=\"Reply to Romania\" aria-label=\"Reply to Romania\">Reply<\/a><\/div>\n<\/div>\n<\/li>\n<\/ul>\n<\/li>\n<li class=\"comment even thread-odd thread-alt depth-1\" id=\"comment-971407\">\n<div id=\"div-comment-971407\" class=\"comment-body\">\n<div class=\"comment-author vcard\"><img decoding=\"async\" alt src=\"https:\/\/secure.gravatar.com\/avatar\/b41c98f1eca833a730943900772d99fc?s=32&amp;d=mm&amp;r=g\" class=\"avatar avatar-32 photo\" height=\"32\" width=\"32\" loading=\"lazy\"><cite class=\"fn\">MARIA<\/cite><span class=\"says\">says:<\/span><\/div>\n<div class=\"comment-meta commentmetadata\"><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971407\">April 20, 2026 at 12:45 pm<\/a><\/div>\n<p>treziti-v\u0103 la realitate. nu suntem capabili de a\u015fa ceva. Noi doar d\u0103r\u00e2m\u0103m ce au construit p\u0103rin\u0163ii no\u015ftrii pentru c\u0103 nu suntem capabili nici s\u0103 zugr\u0103vim ce au f\u0103cut ei.<\/p>\n<div class=\"reply\"><a rel=\"nofollow\" class=\"comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/#comment-971407\" data-commentid=\"971407\" data-postid=\"2264137\" data-belowelement=\"div-comment-971407\" data-respondelement=\"respond\" data-replyto=\"Reply to MARIA\" aria-label=\"Reply to MARIA\">Reply<\/a><\/div>\n<\/div>\n<\/li>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.tion.ro\/stirile-judetului-timis\/podul-solventul-primul-construit-de-la-zero-dupa-revolutie-are-constructor-2264137\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2022\/09\/+otf\/1200&#215;630\/qnfNojsBbneC7VJn9eg0ok5PVF9WRVJZX1NFQ9fmmPWDYsIHFOok3Nk7kgx2eY7DU7nFXq7HAboJeTCAiit8OjWs+f99OT+Ow2MPj6BkKaNgPJbB6qNmOaEBV6Y=\/2887125podsolventulproiect3.jpg&#8221;] Podul Solventul, \u201eprimul pod construit peste Bega de la zero dup\u0103 Revolu\u021bie\u201d dup\u0103 cum se laud\u0103 prim\u0103ria, are constructor. \u00cen urma licita\u021biei, municipalitatea a desemnat asocierea FREYROM SA (lider) \u2013 PROCONS GROUP SRL (asociat) drept c\u00e2\u0219tig\u0103toare \u0219i urmeaz\u0103, dup\u0103 perioada \u00een care \u00eenc\u0103 se pot depune contesta\u021bii, s\u0103 semneze contractul. \u201eE al [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,191],"class_list":["post-1892059","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-tion-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1892059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1892059"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1892059\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1892059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1892059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1892059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}