{"id":1887097,"date":"2026-04-17T08:11:48","date_gmt":"2026-04-17T05:11:48","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1887097"},"modified":"2026-04-17T08:11:48","modified_gmt":"2026-04-17T05:11:48","slug":"a-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-linia-3-statia-recas-din-cadrul-lotului-2-lugoj-timisoara-est","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1887097","title":{"rendered":"A fost deschis circula\u021biei feroviare un nou tronson modernizat de 8,6 km + 900 m Linia 3 Sta\u021bia Reca\u0219, din cadrul LOTULUI 2 Lugoj -Timi\u0219oara Est"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-8.jpeg&#8221;]<\/p>\n<div class=\"entry-content\">\n<p>A fost deschis circula\u021biei feroviare un nou tronson modernizat de 8,6 km + 900 m Linia 3 Sta\u021bia Reca\u0219, din cadrul LOTULUI 2 Lugoj -Timi\u0219oara Est.<\/p>\n<p>Ieri, 16 aprilie, la ora 21.25, a fost dat \u00een exploatare por\u021biunea de linie proiectat\u0103 (fir II), \u00eentre km. 545+750 \u2013 550 +117 (interval Topolov\u0103\u021b \u2013 Reca\u0219), linia II , 3 \u0219i 4 ( tragere cap X) proiectate din sta\u021bia Reca\u0219 \u0219i fir II proiectat \u00eentre km. 552+354 \u2013 554+400 (interval Reca\u0219 \u2013 Remetea Mare).<\/p>\n<p>Pe acest tronson au fost realizate lucr\u0103ri complexe de infrastructur\u0103, incluz\u00e2nd 10 pode\u021be \u0219i 5 poduri construite, 7 schimb\u0103tori tip 60, peron fir II PO Izvin \u0219i peron linia 3-4 Sta\u021bia Reca\u0219, acestea urm\u00e2nd a fi finalizate \u00een viitorul apropiat, precum \u0219i instalarea \u0219i cablarea echipamentelor \u00een container CE \u0219i sala de relee CED Reca\u0219.<\/p>\n<p>Men\u021bion\u0103m c\u0103 acest tronson vine ca \u0219i continuitate a firului II dat \u00een exploatare \u00een data de 12.02.2026, ad\u0103ug\u00e2ndu-se celor aproximativ 30 de km fir modernizat pe care se circul\u0103 la ora actual\u0103.<\/p>\n<p>Reamintim c\u0103 modernizarea infrastructurii feroviare aduce beneficii importante \u00een ceea ce prive\u0219te siguran\u021ba, viteza de circula\u021bie \u0219i confortul c\u0103l\u0103torilor, fiind un pas semnificativ \u00een dezvoltarea transportului feroviar \u00een regiune.<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"176090\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-9-1024x682.jpeg\" alt class=\"wp-image-176090\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176089\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-8-1024x682.jpeg\" alt class=\"wp-image-176089\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176088\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-7-1024x682.jpeg\" alt class=\"wp-image-176088\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176087\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-6-1024x682.jpeg\" alt class=\"wp-image-176087\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176086\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-5-1024x682.jpeg\" alt class=\"wp-image-176086\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176082\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-1-1024x682.jpeg\" alt class=\"wp-image-176082\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176083\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-2-1024x682.jpeg\" alt class=\"wp-image-176083\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"176084\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-3-1024x682.jpeg\" alt class=\"wp-image-176084\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"682\" height=\"1024\" data-id=\"176085\" src=\"https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-4-682x1024.jpeg\" alt class=\"wp-image-176085\"><\/figure>\n<\/figure>\n<div class=\"relpost-thumb-wrapper\">\n<div class=\"relpost-thumb-container\">\n<h3>Cite\u0219te \u0219i:<\/h3>\n<div class=\"relpost-block-container relpost-block-column-layout\"><a href=\"https:\/\/www.observatordetimis.ro\/2026\/03\/17\/alfred-simonis-construim-primul-adapost-pentru-animale-al-consiliului-judetan-timis\/\" class=\"relpost-block-single\"><\/p>\n<div class=\"relpost-custom-block-single\">\n<div class=\"relpost-block-single-text\">\n<h3 class=\"relpost_card_title\">Alfred Simonis: Construim primul ad\u0103post pentru animale al Consiliului Jude\u021ban Timi\u0219<\/h3>\n<\/div>\n<\/div>\n<p><\/a><a href=\"https:\/\/www.observatordetimis.ro\/2025\/10\/23\/elevii-liceului-tehnologic-energetic-regele-ferdinand-i-timisoara-in-vizita-la-cj-timis\/\" class=\"relpost-block-single\"><\/p>\n<div class=\"relpost-custom-block-single\">\n<div class=\"relpost-block-single-text\">\n<h3 class=\"relpost_card_title\">Elevii Liceului Tehnologic Energetic \u201eRegele Ferdinand I\u201d Timi\u0219oara, \u00een vizit\u0103 la CJ Timi\u0219<\/h3>\n<\/div>\n<\/div>\n<p><\/a><a href=\"https:\/\/www.observatordetimis.ro\/2026\/01\/13\/primaria-timisoara-anunta-eliberarea-atestatelor-pentru-administratorii-de-condominii\/\" class=\"relpost-block-single\"><\/p>\n<div class=\"relpost-custom-block-single\">\n<div class=\"relpost-block-single-text\">\n<h3 class=\"relpost_card_title\">Prim\u0103ria Timi\u0219oara anun\u021b\u0103 eliberarea atestatelor pentru administratorii de condominii<\/h3>\n<\/div>\n<\/div>\n<p><\/a><a href=\"https:\/\/www.observatordetimis.ro\/2026\/02\/26\/incep-lucrarile-de-regenerare-urbana-a-pietei-traian\/\" class=\"relpost-block-single\"><\/p>\n<div class=\"relpost-custom-block-single\">\n<div class=\"relpost-block-single-text\">\n<h3 class=\"relpost_card_title\">\u00cencep lucr\u0103rile de regenerare urban\u0103 a Pie\u021bei Traian<\/h3>\n<\/div>\n<\/div>\n<p><\/a><a href=\"https:\/\/www.observatordetimis.ro\/2025\/11\/22\/intalnire-de-lucru-ara-maviz-la-mako-ungaria\/\" class=\"relpost-block-single\"><\/p>\n<div class=\"relpost-custom-block-single\">\n<div class=\"relpost-block-single-text\">\n<h3 class=\"relpost_card_title\">\u00cent\u00e2lnire de lucru ARA \u2013 MaV\u00edz la Mako, Ungaria<\/h3>\n<\/div>\n<\/div>\n<p><\/a><a href=\"https:\/\/www.observatordetimis.ro\/2025\/06\/10\/retea-inteligenta-de-distributie-a-gazelor-naturale-in-mai-multe-localitati-din-timis-licitatia-pentru-executia-lucrarilor-lansata-in-sicap\/\" class=\"relpost-block-single\"><\/p>\n<div class=\"relpost-custom-block-single\">\n<div class=\"relpost-block-single-text\">\n<h3 class=\"relpost_card_title\">Re\u021bea inteligent\u0103 de distribu\u021bie a gazelor naturale, \u00een mai multe localit\u0103\u021bi din Timi\u0219. Licita\u021bia pe&#8230;<\/h3>\n<\/div>\n<\/div>\n<p><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"social-sharing ss-social-sharing\"><a rel=\"external nofollow\" class=\"ss-button-facebook\" href=\"http:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.observatordetimis.ro%2F2026%2F04%2F17%2Fa-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-linia-3-statia-recas-din-cadrul-lotului-2-lugoj-timisoara-est%2F\" target=\"_blank\">Share on Facebook<\/a><a rel=\"external nofollow\" class=\"ss-button-twitter\" href=\"http:\/\/twitter.com\/intent\/tweet\/?text=A+fost+deschis+circula%C8%9Biei+feroviare+un+nou+tronson+modernizat+de+8%2C6+km+%2B+900+m+Linia+3+Sta%C8%9Bia+Reca%C8%99%2C+din+cadrul+LOTULUI+2+Lugoj+-Timi%C8%99oara+Est&amp;url=https%3A%2F%2Fwww.observatordetimis.ro%2F2026%2F04%2F17%2Fa-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-linia-3-statia-recas-din-cadrul-lotului-2-lugoj-timisoara-est%2F\" target=\"_blank\">Share on Twitter<\/a><a rel=\"external nofollow\" class=\"ss-button-linkedin\" href=\"http:\/\/www.linkedin.com\/shareArticle?mini=true&amp;url=https%3A%2F%2Fwww.observatordetimis.ro%2F2026%2F04%2F17%2Fa-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-linia-3-statia-recas-din-cadrul-lotului-2-lugoj-timisoara-est%2F&amp;title=A+fost+deschis+circula%C8%9Biei+feroviare+un+nou+tronson+modernizat+de+8%2C6+km+%2B+900+m+Linia+3+Sta%C8%9Bia+Reca%C8%99%2C+din+cadrul+LOTULUI+2+Lugoj+-Timi%C8%99oara+Est\" target=\"_blank\">Share on Linkedin<\/a><\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.observatordetimis.ro\/2026\/04\/17\/a-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-linia-3-statia-recas-din-cadrul-lotului-2-lugoj-timisoara-est\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.observatordetimis.ro\/wp-content\/uploads\/2026\/04\/A-fost-deschis-circulatiei-feroviare-un-nou-tronson-modernizat-de-86-km-900-m-Linia-3-Statia-Recas-din-cadrul-LOTULUI-2-Lugoj-Timisoara-Est-8.jpeg&#8221;] A fost deschis circula\u021biei feroviare un nou tronson modernizat de 8,6 km + 900 m Linia 3 Sta\u021bia Reca\u0219, din cadrul LOTULUI 2 Lugoj -Timi\u0219oara Est. Ieri, 16 aprilie, la ora 21.25, a fost dat \u00een exploatare por\u021biunea de linie proiectat\u0103 (fir II), \u00eentre km. 545+750 \u2013 550 +117 (interval Topolov\u0103\u021b \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,186],"class_list":["post-1887097","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-observatordetimis-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1887097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1887097"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1887097\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1887097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1887097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1887097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}