{"id":1884089,"date":"2026-04-14T16:11:02","date_gmt":"2026-04-14T13:11:02","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1884089"},"modified":"2026-04-14T16:11:02","modified_gmt":"2026-04-14T13:11:02","slug":"la-muereasca-buget-de-supravietuire-suficient-pentru-cheltuieli-prea-mic-pentru-investitii-si-dezvoltare","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1884089","title":{"rendered":"La Muereasca, buget de supravie\u021buire, suficient pentru cheltuieli, prea mic pentru investi\u021bii \u0219i dezvoltare"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2024\/03\/muereasca-ion-ungureanu-05.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2288\" height=\"1280\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2024\/03\/muereasca-ion-ungureanu-05.jpg\" class=\"img-responsive wp-post-image\" alt=\"La Muereasca, buget de supravie\u021buire, suficient pentru cheltuieli, prea mic pentru investi\u021bii \u0219i dezvoltare\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/04\/14\/la-muereasca-buget-de-supravietuire-suficient-pentru-cheltuieli-prea-mic-pentru-investitii-si-dezvoltare\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2026-04-14T19:11:02+03:00\">14 aprilie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/muereasca\/\" rel=\"category tag\">Muereasca<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Muereasca, calculele pentru anul \u00een curs au fost f\u0103cute cu grij\u0103 \u0219i cu mult\u0103 aten\u021bie la fiecare leu, pentru c\u0103 veniturile locale sunt limitate, iar sumele primite de la bugetul central nu ofer\u0103 spa\u021biu pentru investi\u021bii noi. Situa\u021bia pune administra\u021bia \u00een fa\u021ba unei alegeri dificile, aceea de a acoperi cheltuielile curente \u0219i de a am\u00e2na dezvoltarea, chiar dac\u0103 proiectele exist\u0103 \u0219i sunt preg\u0103tite.<\/p>\n<p>Primarul comunei Muereasca, Ion Ungureanu, ne a explicat \u00a0c\u0103 bugetul din acest an este construit pe echilibru fragil, \u00een care prioritatea r\u0103m\u00e2ne func\u021bionarea institu\u021biei \u0219i plata obliga\u021biilor de baz\u0103, f\u0103r\u0103 posibilitatea de a deschide lucr\u0103ri noi sau de a preg\u0103ti documenta\u021bii pentru investi\u021bii viitoare:<\/p>\n<p>\u201e<strong><em>Bugetul de anul acesta, din veniturile pe care le realiz\u0103m \u0219i sumele mici care ne-au fost alocate, eu zic c\u0103 o s\u0103 facem fa\u021b\u0103 la cheltuielile curente, la cheltuielile cu utilit\u0103\u021bile, cheltuielile materiale, cheltuielile salariale, inclusiv la capitolul persoane cu dizabilit\u0103\u021bi, \u0219i cred c\u0103 p\u00e2n\u0103 la finele anului, dac\u0103 nu apar modific\u0103ri la anumite cheltuieli, o s\u0103 ne descurc\u0103m, dar nu o s\u0103 mai avem posibilitatea s\u0103 facem vreun studiu de fezabilitate sau s\u0103 dezvolt\u0103m localitatea cu proiecte noi<\/em><\/strong>\u201d, spune primarul, care subliniaz\u0103 c\u0103 presiunea vine \u0219i \u00a0din lipsa liniilor de finan\u021bare.<\/p>\n<p>A\u0219adar, blocajul nu \u021bine doar de bugetul local, ci \u0219i de faptul c\u0103 programele na\u021bionale \u0219i europene nu mai accept\u0103 proiecte noi, iar alte axe de finan\u021bare nu s-au deschis, ceea ce \u00eenseamn\u0103 c\u0103 administra\u021biile care au \u00een plan s\u0103 depun\u0103 documenta\u021bii noi r\u0103m\u00e2n f\u0103r\u0103 solu\u021bii: \u201e<strong><em>Dac\u0103 ne uit\u0103m, PNRR a r\u0103mas \u00een plat\u0103 doar cu contractele deja semnate, pe Anghel Saligny nu se mai primesc proiecte noi, alte programe de finan\u021bare nu prea mai sunt. \u00a0Eu am deja \u00een portofoliu \u00eenc\u0103 patru proiecte \u0219i nu am unde s\u0103 le depun pentru finan\u021bare, pentru c\u0103 totul este blocat, nu le mai primesc<\/em><\/strong>\u201d, explic\u0103 Ion Ungureanu, descriind o situa\u021bie care nu \u021bine de lipsa de ini\u021biativ\u0103, ci de lipsa surselor de finan\u021bare.<\/p>\n<p><strong><em>Cu toate acestea, lista de investi\u021bii preg\u0103tite r\u0103m\u00e2ne consistent\u0103, semn c\u0103 planurile de dezvoltare exist\u0103 chiar dac\u0103 implementarea lor depinde de fonduri externe<\/em><\/strong>.<\/p>\n<p>Una dintre investi\u021biile aflate \u00een a\u0219teptare vizeaz\u0103 <strong><u>reabilitarea \u0219colii din Muereasca de Sus<\/u><\/strong>, proiect depus prin Compania Na\u021bional\u0103 de Investi\u021bii, evaluat la aproximativ 1,2 milioane de lei, unitatea fiind func\u021bional\u0103, dar av\u00e2nd nevoie de lucr\u0103ri pentru a r\u0103spunde cerin\u021belor actuale.<\/p>\n<p>\u00cen acela\u0219i sat, administra\u021bia dore\u0219te realizarea unui sistem de producere a energiei electrice cu <strong><u>panouri fotovoltaice<\/u><\/strong>, solu\u021bie g\u00e2ndit\u0103 pentru a reduce costurile cu energia.<\/p>\n<p>\u201e<strong><em>Am vrea s\u0103 facem acolo o surs\u0103 de producere a energiei electrice cu panouri fotovoltaice, s\u0103 producem energie ca s\u0103 nu mai pl\u0103tim curent<\/em><\/strong>\u201d, precizeaz\u0103 primarul, ar\u0103t\u00e2nd c\u0103 astfel de investi\u021bii nu mai sunt doar op\u021biuni, ci devin necesare pentru echilibrul financiar al prim\u0103rie.<\/p>\n<p>La <strong><u>baza sportiv\u0103<\/u><\/strong>, acoperi\u0219ul necesit\u0103 lucr\u0103ri de reabilitare, iar proiectul este preg\u0103tit pentru a fi depus pe o ax\u0103 de finan\u021bare disponibil\u0103, \u00een speran\u021ba c\u0103 lucr\u0103rile vor putea \u00eencepe c\u00e2t mai cur\u00e2nd.<\/p>\n<p>Pe zona de utilit\u0103\u021bi, exist\u0103 <strong><u>dou\u0103 proiecte<\/u><\/strong> importante pentru <strong><u>extinderea re\u021belei de ap\u0103<\/u><\/strong>, unul \u00een c\u0103tunul Fr\u00e2nce\u0219ti Coast\u0103 pe o lungime de aproximativ 500 de metri, altul \u00een satul \u0218uta, \u00eentr-o zon\u0103 aflat\u0103 la o cot\u0103 mai ridicat\u0103, unde lucr\u0103rile nu au fost realizate ini\u021bial din cauza costurilor: \u201e<strong><em>Acolo nu am putut s\u0103 realiz\u0103m ini\u021bial extinderea din cauza costurilor \u0219i aceste lucr\u0103ri au fost t\u0103iate din proiectul de la Ministerul Dezvolt\u0103rii, dar acum am ref\u0103cut documenta\u021bia pentru extindere, ambele proiecte \u00eensum\u00e2nd aproximativ 1,2 kilometri<\/em><\/strong>\u201d, ne explic\u0103 Ion Ungureanu.<\/p>\n<p>Lista continu\u0103 cu <strong><u>modernizarea unor str\u0103zi din satele Andree\u0219ti \u0219i \u0218uta<\/u><\/strong>, inclusiv strada \u0218colii \u0219i strada Boureci, care au r\u0103mas nemodernizate, cu o lungime total\u0103 de aproximativ 1,1 kilometri, lucr\u0103ri ce includ asfalt \u0219i rigole, necesare pentru a completa infrastructura rutier\u0103 local\u0103.<\/p>\n<p>Administra\u021bia are \u00een plan <strong><u>\u0219i instalarea unei sta\u021bii de \u00eenc\u0103rcare<\/u><\/strong> pentru ma\u0219ini electrice \u00een apropierea bazei sportive.<\/p>\n<p>Primarul subliniaz\u0103 c\u0103 multe dintre investi\u021biile mari au fost deja realizate \u00een anii anteriori, accentul fiind pus acum pe \u00eentre\u021binere \u0219i completare: \u201e<strong><em>\u00cen mare parte, proiectele importante din localitate au fost f\u0103cute, \u00a0acum avem responsabilitatea s\u0103 le \u00eentre\u021binem. Pentru cele pe care le-am enumerat avem deja documenta\u021biile preg\u0103tite, dac\u0103 bugetul ar permite le-a\u0219 putea realiza din fonduri locale, dar cum bugetul este str\u00e2mtorat, trebuie s\u0103 atragem bani \u0219i s\u0103 identific\u0103m axe de finan\u021bare\u201d,<\/em><\/strong> spune Ion Ungureanu.<\/p>\n<p>Un alt punct important \u00eel reprezint\u0103 <strong><u>dezvoltarea infrastructurii electrice<\/u><\/strong> \u00een zonele care pot sus\u021bine extinderea localit\u0103\u021bii, mai ales pe drumul care face leg\u0103tura spre B\u0103ile Ol\u0103ne\u0219ti, modernizat cu sprijinul Consiliului Jude\u021bean, unde este necesar\u0103 extinderea re\u021belei electrice \u0219i instalarea iluminatului public, pentru a crea condi\u021bii pentru investi\u021bii viitoare.<\/p>\n<p>Direc\u021bia de dezvoltare se leag\u0103 \u0219i de deschiderea c\u0103tre alte zone turistice, primarul explic\u00e2nd c\u0103 dup\u0103 leg\u0103tura cu B\u0103ile Ol\u0103ne\u0219ti, <strong><u>aten\u021bia s-a mutat spre C\u0103lim\u0103ne\u0219ti<\/u><\/strong>, unde exist\u0103 deja un proiect preg\u0103tit pentru un tronson de aproximativ doi kilometri p\u00e2n\u0103 la limita administrativ\u0103: \u201e<em><strong>Avem proiectul preg\u0103tit pentru aceast\u0103 leg\u0103tur\u0103, am f\u0103cut solicit\u0103ri \u00eempreun\u0103 cu Consiliul Jude\u021bean, \u00eens\u0103 nu a fost inclus \u00een bugetul pe anul acesta. Nu renun\u021b\u0103m la el, pentru c\u0103 este un proiect important, a\u0219tept\u0103m s\u0103 ob\u021bin\u0103 finan\u021barea necesar\u0103 pentru a putea \u00eencepe lucr\u0103rile<\/strong><\/em>.\u201d \u201eafirm\u0103 Ion Ungureanu.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Muereasca, calculele pentru anul \u00een curs au fost f\u0103cute cu grij\u0103 \u0219i cu mult\u0103 aten\u021bie la fiecare leu, pentru c\u0103 veniturile locale sunt limitate, iar sumele primite de la bugetul central nu ofer\u0103 spa\u021biu pentru investi\u021bii noi. Situa\u021bia pune administra\u021bia \u00een fa\u021ba unei alegeri dificile, aceea de a acoperi cheltuielile curente \u0219i de a am\u00e2na dezvoltarea, chiar dac\u0103 proiectele exist\u0103 \u0219i sunt preg\u0103tite.<\/p>\n<p>Primarul comunei Muereasca, Ion Ungureanu, ne a explicat \u00a0c\u0103 bugetul din acest an este construit pe echilibru fragil, \u00een care prioritatea r\u0103m\u00e2ne func\u021bionarea institu\u021biei \u0219i plata obliga\u021biilor de baz\u0103, f\u0103r\u0103 posibilitatea de a deschide lucr\u0103ri noi sau de a preg\u0103ti documenta\u021bii pentru investi\u021bii viitoare:<\/p>\n<p>\u201e<strong><em>Bugetul de anul acesta, din veniturile pe care le realiz\u0103m \u0219i sumele mici care ne-au fost alocate, eu zic c\u0103 o s\u0103 facem fa\u021b\u0103 la cheltuielile curente, la cheltuielile cu utilit\u0103\u021bile, cheltuielile materiale, cheltuielile salariale, inclusiv la capitolul persoane cu dizabilit\u0103\u021bi, \u0219i cred c\u0103 p\u00e2n\u0103 la finele anului, dac\u0103 nu apar modific\u0103ri la anumite cheltuieli, o s\u0103 ne descurc\u0103m, dar nu o s\u0103 mai avem posibilitatea s\u0103 facem vreun studiu de fezabilitate sau s\u0103 dezvolt\u0103m localitatea cu proiecte noi<\/em><\/strong>\u201d, spune primarul, care subliniaz\u0103 c\u0103 presiunea vine \u0219i \u00a0din lipsa liniilor de finan\u021bare.<\/p>\n<p>A\u0219adar, blocajul nu \u021bine doar de bugetul local, ci \u0219i de faptul c\u0103 programele na\u021bionale \u0219i europene nu mai accept\u0103 proiecte noi, iar alte axe de finan\u021bare nu s-au deschis, ceea ce \u00eenseamn\u0103 c\u0103 administra\u021biile care au \u00een plan s\u0103 depun\u0103 documenta\u021bii noi r\u0103m\u00e2n f\u0103r\u0103 solu\u021bii: \u201e<strong><em>Dac\u0103 ne uit\u0103m, PNRR a r\u0103mas \u00een plat\u0103 doar cu contractele deja semnate, pe Anghel Saligny nu se mai primesc proiecte noi, alte programe de finan\u021bare nu prea mai sunt. \u00a0Eu am deja \u00een portofoliu \u00eenc\u0103 patru proiecte \u0219i nu am unde s\u0103 le depun pentru finan\u021bare, pentru c\u0103 totul este blocat, nu le mai primesc<\/em><\/strong>\u201d, explic\u0103 Ion Ungureanu, descriind o situa\u021bie care nu \u021bine de lipsa de ini\u021biativ\u0103, ci de lipsa surselor de finan\u021bare.<\/p>\n<p><strong><em>Cu toate acestea, lista de investi\u021bii preg\u0103tite r\u0103m\u00e2ne consistent\u0103, semn c\u0103 planurile de dezvoltare exist\u0103 chiar dac\u0103 implementarea lor depinde de fonduri externe<\/em><\/strong>.<\/p>\n<p>Una dintre investi\u021biile aflate \u00een a\u0219teptare vizeaz\u0103 <strong><u>reabilitarea \u0219colii din Muereasca de Sus<\/u><\/strong>, proiect depus prin Compania Na\u021bional\u0103 de Investi\u021bii, evaluat la aproximativ 1,2 milioane de lei, unitatea fiind func\u021bional\u0103, dar av\u00e2nd nevoie de lucr\u0103ri pentru a r\u0103spunde cerin\u021belor actuale.<\/p>\n<p>\u00cen acela\u0219i sat, administra\u021bia dore\u0219te realizarea unui sistem de producere a energiei electrice cu <strong><u>panouri fotovoltaice<\/u><\/strong>, solu\u021bie g\u00e2ndit\u0103 pentru a reduce costurile cu energia.<\/p>\n<p>\u201e<strong><em>Am vrea s\u0103 facem acolo o surs\u0103 de producere a energiei electrice cu panouri fotovoltaice, s\u0103 producem energie ca s\u0103 nu mai pl\u0103tim curent<\/em><\/strong>\u201d, precizeaz\u0103 primarul, ar\u0103t\u00e2nd c\u0103 astfel de investi\u021bii nu mai sunt doar op\u021biuni, ci devin necesare pentru echilibrul financiar al prim\u0103rie.<\/p>\n<p>La <strong><u>baza sportiv\u0103<\/u><\/strong>, acoperi\u0219ul necesit\u0103 lucr\u0103ri de reabilitare, iar proiectul este preg\u0103tit pentru a fi depus pe o ax\u0103 de finan\u021bare disponibil\u0103, \u00een speran\u021ba c\u0103 lucr\u0103rile vor putea \u00eencepe c\u00e2t mai cur\u00e2nd.<\/p>\n<p>Pe zona de utilit\u0103\u021bi, exist\u0103 <strong><u>dou\u0103 proiecte<\/u><\/strong> importante pentru <strong><u>extinderea re\u021belei de ap\u0103<\/u><\/strong>, unul \u00een c\u0103tunul Fr\u00e2nce\u0219ti Coast\u0103 pe o lungime de aproximativ 500 de metri, altul \u00een satul \u0218uta, \u00eentr-o zon\u0103 aflat\u0103 la o cot\u0103 mai ridicat\u0103, unde lucr\u0103rile nu au fost realizate ini\u021bial din cauza costurilor: \u201e<strong><em>Acolo nu am putut s\u0103 realiz\u0103m ini\u021bial extinderea din cauza costurilor \u0219i aceste lucr\u0103ri au fost t\u0103iate din proiectul de la Ministerul Dezvolt\u0103rii, dar acum am ref\u0103cut documenta\u021bia pentru extindere, ambele proiecte \u00eensum\u00e2nd aproximativ 1,2 kilometri<\/em><\/strong>\u201d, ne explic\u0103 Ion Ungureanu.<\/p>\n<p>Lista continu\u0103 cu <strong><u>modernizarea unor str\u0103zi din satele Andree\u0219ti \u0219i \u0218uta<\/u><\/strong>, inclusiv strada \u0218colii \u0219i strada Boureci, care au r\u0103mas nemodernizate, cu o lungime total\u0103 de aproximativ 1,1 kilometri, lucr\u0103ri ce includ asfalt \u0219i rigole, necesare pentru a completa infrastructura rutier\u0103 local\u0103.<\/p>\n<p>Administra\u021bia are \u00een plan <strong><u>\u0219i instalarea unei sta\u021bii de \u00eenc\u0103rcare<\/u><\/strong> pentru ma\u0219ini electrice \u00een apropierea bazei sportive.<\/p>\n<p>Primarul subliniaz\u0103 c\u0103 multe dintre investi\u021biile mari au fost deja realizate \u00een anii anteriori, accentul fiind pus acum pe \u00eentre\u021binere \u0219i completare: \u201e<strong><em>\u00cen mare parte, proiectele importante din localitate au fost f\u0103cute, \u00a0acum avem responsabilitatea s\u0103 le \u00eentre\u021binem. Pentru cele pe care le-am enumerat avem deja documenta\u021biile preg\u0103tite, dac\u0103 bugetul ar permite le-a\u0219 putea realiza din fonduri locale, dar cum bugetul este str\u00e2mtorat, trebuie s\u0103 atragem bani \u0219i s\u0103 identific\u0103m axe de finan\u021bare\u201d,<\/em><\/strong> spune Ion Ungureanu.<\/p>\n<p>Un alt punct important \u00eel reprezint\u0103 <strong><u>dezvoltarea infrastructurii electrice<\/u><\/strong> \u00een zonele care pot sus\u021bine extinderea localit\u0103\u021bii, mai ales pe drumul care face leg\u0103tura spre B\u0103ile Ol\u0103ne\u0219ti, modernizat cu sprijinul Consiliului Jude\u021bean, unde este necesar\u0103 extinderea re\u021belei electrice \u0219i instalarea iluminatului public, pentru a crea condi\u021bii pentru investi\u021bii viitoare.<\/p>\n<p>Direc\u021bia de dezvoltare se leag\u0103 \u0219i de deschiderea c\u0103tre alte zone turistice, primarul explic\u00e2nd c\u0103 dup\u0103 leg\u0103tura cu B\u0103ile Ol\u0103ne\u0219ti, <strong><u>aten\u021bia s-a mutat spre C\u0103lim\u0103ne\u0219ti<\/u><\/strong>, unde exist\u0103 deja un proiect preg\u0103tit pentru un tronson de aproximativ doi kilometri p\u00e2n\u0103 la limita administrativ\u0103: \u201e<em><strong>Avem proiectul preg\u0103tit pentru aceast\u0103 leg\u0103tur\u0103, am f\u0103cut solicit\u0103ri \u00eempreun\u0103 cu Consiliul Jude\u021bean, \u00eens\u0103 nu a fost inclus \u00een bugetul pe anul acesta. Nu renun\u021b\u0103m la el, pentru c\u0103 este un proiect important, a\u0219tept\u0103m s\u0103 ob\u021bin\u0103 finan\u021barea necesar\u0103 pentru a putea \u00eencepe lucr\u0103rile<\/strong><\/em>.\u201d \u201eafirm\u0103 Ion Ungureanu.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Muereasca, calculele pentru anul \u00een curs au fost f\u0103cute cu grij\u0103 \u0219i cu mult\u0103 aten\u021bie la fiecare leu, pentru c\u0103 veniturile locale sunt limitate, iar sumele primite de la bugetul central nu ofer\u0103 spa\u021biu pentru investi\u021bii noi. Situa\u021bia pune administra\u021bia \u00een fa\u021ba unei alegeri dificile, aceea de a acoperi cheltuielile curente \u0219i de a am\u00e2na dezvoltarea, chiar dac\u0103 proiectele exist\u0103 \u0219i sunt preg\u0103tite.<\/p>\n<p>Primarul comunei Muereasca, Ion Ungureanu, ne a explicat \u00a0c\u0103 bugetul din acest an este construit pe echilibru fragil, \u00een care prioritatea r\u0103m\u00e2ne func\u021bionarea institu\u021biei \u0219i plata obliga\u021biilor de baz\u0103, f\u0103r\u0103 posibilitatea de a deschide lucr\u0103ri noi sau de a preg\u0103ti documenta\u021bii pentru investi\u021bii viitoare:<\/p>\n<p>\u201e<strong><em>Bugetul de anul acesta, din veniturile pe care le realiz\u0103m \u0219i sumele mici care ne-au fost alocate, eu zic c\u0103 o s\u0103 facem fa\u021b\u0103 la cheltuielile curente, la cheltuielile cu utilit\u0103\u021bile, cheltuielile materiale, cheltuielile salariale, inclusiv la capitolul persoane cu dizabilit\u0103\u021bi, \u0219i cred c\u0103 p\u00e2n\u0103 la finele anului, dac\u0103 nu apar modific\u0103ri la anumite cheltuieli, o s\u0103 ne descurc\u0103m, dar nu o s\u0103 mai avem posibilitatea s\u0103 facem vreun studiu de fezabilitate sau s\u0103 dezvolt\u0103m localitatea cu proiecte noi<\/em><\/strong>\u201d, spune primarul, care subliniaz\u0103 c\u0103 presiunea vine \u0219i \u00a0din lipsa liniilor de finan\u021bare.<\/p>\n<p>A\u0219adar, blocajul nu \u021bine doar de bugetul local, ci \u0219i de faptul c\u0103 programele na\u021bionale \u0219i europene nu mai accept\u0103 proiecte noi, iar alte axe de finan\u021bare nu s-au deschis, ceea ce \u00eenseamn\u0103 c\u0103 administra\u021biile care au \u00een plan s\u0103 depun\u0103 documenta\u021bii noi r\u0103m\u00e2n f\u0103r\u0103 solu\u021bii: \u201e<strong><em>Dac\u0103 ne uit\u0103m, PNRR a r\u0103mas \u00een plat\u0103 doar cu contractele deja semnate, pe Anghel Saligny nu se mai primesc proiecte noi, alte programe de finan\u021bare nu prea mai sunt. \u00a0Eu am deja \u00een portofoliu \u00eenc\u0103 patru proiecte \u0219i nu am unde s\u0103 le depun pentru finan\u021bare, pentru c\u0103 totul este blocat, nu le mai primesc<\/em><\/strong>\u201d, explic\u0103 Ion Ungureanu, descriind o situa\u021bie care nu \u021bine de lipsa de ini\u021biativ\u0103, ci de lipsa surselor de finan\u021bare.<\/p>\n<p><strong><em>Cu toate acestea, lista de investi\u021bii preg\u0103tite r\u0103m\u00e2ne consistent\u0103, semn c\u0103 planurile de dezvoltare exist\u0103 chiar dac\u0103 implementarea lor depinde de fonduri externe<\/em><\/strong>.<\/p>\n<p>Una dintre investi\u021biile aflate \u00een a\u0219teptare vizeaz\u0103 <strong><u>reabilitarea \u0219colii din Muereasca de Sus<\/u><\/strong>, proiect depus prin Compania Na\u021bional\u0103 de Investi\u021bii, evaluat la aproximativ 1,2 milioane de lei, unitatea fiind func\u021bional\u0103, dar av\u00e2nd nevoie de lucr\u0103ri pentru a r\u0103spunde cerin\u021belor actuale.<\/p>\n<p>\u00cen acela\u0219i sat, administra\u021bia dore\u0219te realizarea unui sistem de producere a energiei electrice cu <strong><u>panouri fotovoltaice<\/u><\/strong>, solu\u021bie g\u00e2ndit\u0103 pentru a reduce costurile cu energia.<\/p>\n<p>\u201e<strong><em>Am vrea s\u0103 facem acolo o surs\u0103 de producere a energiei electrice cu panouri fotovoltaice, s\u0103 producem energie ca s\u0103 nu mai pl\u0103tim curent<\/em><\/strong>\u201d, precizeaz\u0103 primarul, ar\u0103t\u00e2nd c\u0103 astfel de investi\u021bii nu mai sunt doar op\u021biuni, ci devin necesare pentru echilibrul financiar al prim\u0103rie.<\/p>\n<p>La <strong><u>baza sportiv\u0103<\/u><\/strong>, acoperi\u0219ul necesit\u0103 lucr\u0103ri de reabilitare, iar proiectul este preg\u0103tit pentru a fi depus pe o ax\u0103 de finan\u021bare disponibil\u0103, \u00een speran\u021ba c\u0103 lucr\u0103rile vor putea \u00eencepe c\u00e2t mai cur\u00e2nd.<\/p>\n<p>Pe zona de utilit\u0103\u021bi, exist\u0103 <strong><u>dou\u0103 proiecte<\/u><\/strong> importante pentru <strong><u>extinderea re\u021belei de ap\u0103<\/u><\/strong>, unul \u00een c\u0103tunul Fr\u00e2nce\u0219ti Coast\u0103 pe o lungime de aproximativ 500 de metri, altul \u00een satul \u0218uta, \u00eentr-o zon\u0103 aflat\u0103 la o cot\u0103 mai ridicat\u0103, unde lucr\u0103rile nu au fost realizate ini\u021bial din cauza costurilor: \u201e<strong><em>Acolo nu am putut s\u0103 realiz\u0103m ini\u021bial extinderea din cauza costurilor \u0219i aceste lucr\u0103ri au fost t\u0103iate din proiectul de la Ministerul Dezvolt\u0103rii, dar acum am ref\u0103cut documenta\u021bia pentru extindere, ambele proiecte \u00eensum\u00e2nd aproximativ 1,2 kilometri<\/em><\/strong>\u201d, ne explic\u0103 Ion Ungureanu.<\/p>\n<p>Lista continu\u0103 cu <strong><u>modernizarea unor str\u0103zi din satele Andree\u0219ti \u0219i \u0218uta<\/u><\/strong>, inclusiv strada \u0218colii \u0219i strada Boureci, care au r\u0103mas nemodernizate, cu o lungime total\u0103 de aproximativ 1,1 kilometri, lucr\u0103ri ce includ asfalt \u0219i rigole, necesare pentru a completa infrastructura rutier\u0103 local\u0103.<\/p>\n<p>Administra\u021bia are \u00een plan <strong><u>\u0219i instalarea unei sta\u021bii de \u00eenc\u0103rcare<\/u><\/strong> pentru ma\u0219ini electrice \u00een apropierea bazei sportive.<\/p>\n<p>Primarul subliniaz\u0103 c\u0103 multe dintre investi\u021biile mari au fost deja realizate \u00een anii anteriori, accentul fiind pus acum pe \u00eentre\u021binere \u0219i completare: \u201e<strong><em>\u00cen mare parte, proiectele importante din localitate au fost f\u0103cute, \u00a0acum avem responsabilitatea s\u0103 le \u00eentre\u021binem. Pentru cele pe care le-am enumerat avem deja documenta\u021biile preg\u0103tite, dac\u0103 bugetul ar permite le-a\u0219 putea realiza din fonduri locale, dar cum bugetul este str\u00e2mtorat, trebuie s\u0103 atragem bani \u0219i s\u0103 identific\u0103m axe de finan\u021bare\u201d,<\/em><\/strong> spune Ion Ungureanu.<\/p>\n<p>Un alt punct important \u00eel reprezint\u0103 <strong><u>dezvoltarea infrastructurii electrice<\/u><\/strong> \u00een zonele care pot sus\u021bine extinderea localit\u0103\u021bii, mai ales pe drumul care face leg\u0103tura spre B\u0103ile Ol\u0103ne\u0219ti, modernizat cu sprijinul Consiliului Jude\u021bean, unde este necesar\u0103 extinderea re\u021belei electrice \u0219i instalarea iluminatului public, pentru a crea condi\u021bii pentru investi\u021bii viitoare.<\/p>\n<p>Direc\u021bia de dezvoltare se leag\u0103 \u0219i de deschiderea c\u0103tre alte zone turistice, primarul explic\u00e2nd c\u0103 dup\u0103 leg\u0103tura cu B\u0103ile Ol\u0103ne\u0219ti, <strong><u>aten\u021bia s-a mutat spre C\u0103lim\u0103ne\u0219ti<\/u><\/strong>, unde exist\u0103 deja un proiect preg\u0103tit pentru un tronson de aproximativ doi kilometri p\u00e2n\u0103 la limita administrativ\u0103: \u201e<em><strong>Avem proiectul preg\u0103tit pentru aceast\u0103 leg\u0103tur\u0103, am f\u0103cut solicit\u0103ri \u00eempreun\u0103 cu Consiliul Jude\u021bean, \u00eens\u0103 nu a fost inclus \u00een bugetul pe anul acesta. Nu renun\u021b\u0103m la el, pentru c\u0103 este un proiect important, a\u0219tept\u0103m s\u0103 ob\u021bin\u0103 finan\u021barea necesar\u0103 pentru a putea \u00eencepe lucr\u0103rile<\/strong><\/em>.\u201d \u201eafirm\u0103 Ion Ungureanu.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/04\/14\/la-muereasca-buget-de-supravietuire-suficient-pentru-cheltuieli-prea-mic-pentru-investitii-si-dezvoltare\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2024\/03\/muereasca-ion-ungureanu-05.jpg&#8221;] 14 aprilie 2026Claudia SchiopuAdministra\u0163ieMuereasca La Muereasca, calculele pentru anul \u00een curs au fost f\u0103cute cu grij\u0103 \u0219i cu mult\u0103 aten\u021bie la fiecare leu, pentru c\u0103 veniturile locale sunt limitate, iar sumele primite de la bugetul central nu ofer\u0103 spa\u021biu pentru investi\u021bii noi. Situa\u021bia pune administra\u021bia \u00een fa\u021ba unei alegeri dificile, aceea de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-1884089","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1884089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1884089"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1884089\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1884089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1884089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1884089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}