{"id":1881871,"date":"2026-04-14T16:20:53","date_gmt":"2026-04-14T13:20:53","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1881871"},"modified":"2026-04-14T16:20:53","modified_gmt":"2026-04-14T13:20:53","slug":"lucrarile-la-podul-muncii-continua-se-demonteaza-tablierului-central-foto","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1881871","title":{"rendered":"Lucr\u0103rile la Podul Muncii continu\u0103. Se demonteaz\u0103 tablierului central FOTO"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/d2be029c-ef24-4bf1-a547-77f7813e25cf.jpeg&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Viceprimarul Timi\u0219oarei, Ruben La\u021bc\u0103u anun\u021b\u0103 c\u0103 lucr\u0103rile la Podul Iuliu Maniu (Muncii) s-au reluat dup\u0103 minivacan\u021ba de Pa\u0219te. Mar\u021bi au \u00eenceput opera\u021biunile de demontare a tablierului.<\/p>\n<p>\u201c<em>Munca pe \u0219antierele Timi\u0219oarei a re\u00eenceput. Podul Iuliu Maniu, unde am \u00eenceput desfacerea tablierului central, adic\u0103 a grinzilor care supratraverseaz\u0103 canalul Bega. Ast\u0103zi vom termina \u00een \u00eentregime aceast\u0103 etap\u0103, urm\u00e2nd ca \u00een s\u0103pt\u0103m\u00e2nile urm\u0103toare s\u0103 desfacem alte dou\u0103 tabliere<\/em>\u201c, a declarat Ruben La\u021bc\u0103u.<\/p>\n<p>De asemenea, La\u021bc\u0103u a subliniat c\u0103 va monitoriza s\u0103pt\u0103m\u00e2nal \u0219antierele importante ale Timi\u0219oarei.<\/p>\n<p>\u201c\u00cemi men\u021bin promisiunea de a vizita s\u0103pt\u0103m\u00e2nal \u0219antierele importante ale Timi\u0219oarei ca s\u0103 ne asigur\u0103m c\u0103 se fac la timp \u0219i la calitatea pe care ne-o dorim\u201d, a mai spus viceprimarul Timi\u0219oarei.<\/p>\n<p>Investi\u021bia Prim\u0103riei Timi\u0219oara include consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii cu o structur\u0103 mixt\u0103 o\u021bel-beton, cu p\u0103strarea a c\u00e2te dou\u0103 benzi pe sens, fiecare cu l\u0103\u021bimea de 3,50 metri. Municipalitatea a prev\u0103zut \u0219i reabilitarea rampelor, precum \u0219i refacerea sc\u0103rilor de acces cu elemente metalice. De asemenea, pentru pietoni, trotuarele vor fi l\u0103rgite p\u00e2n\u0103 la 1,75 m, iar pentru bicicli\u0219ti vor fi amenajate piste. Pentru transportul public, investi\u021bia va permite reintroducerea circula\u021biei troleibuzelor. Proiectul include \u0219i iluminat arhitectural modern, consolidarea malului Canalului Bega, precum \u0219i plantarea de arbori.<\/p>\n<p>Lucr\u0103rile vor fi executate de asocierea ZSN CARDINAL (lider), ARDELEAN COMPANY NORD VEST SRL \u0219i CML.RO SRL, iar termenul de finalizare este februarie 2027. Valoarea total\u0103 a proiectului este de aproape 10 milioane de euro, din care aproximativ 7,4 milioane de euro reprezint\u0103 fonduri europene nerambursabile, prin Programul Regional Vest 2021 \u2013 2027.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-183132 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/lucrarile-la-podul-muncii-continua-se-demonteaza-tablierului-central-foto\/9afc7837-77bb-43aa-b9f8-a493395b3e3e\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/9afc7837-77bb-43aa-b9f8-a493395b3e3e-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/9afc7837-77bb-43aa-b9f8-a493395b3e3e-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/lucrarile-la-podul-muncii-continua-se-demonteaza-tablierului-central-foto\/7e08e938-0b80-4bbd-99ed-c6b1827f51e1\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/7e08e938-0b80-4bbd-99ed-c6b1827f51e1-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/7e08e938-0b80-4bbd-99ed-c6b1827f51e1-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/lucrarile-la-podul-muncii-continua-se-demonteaza-tablierului-central-foto\/3a50bb14-7845-4a10-a941-94c26e185bc3\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/3a50bb14-7845-4a10-a941-94c26e185bc3-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/3a50bb14-7845-4a10-a941-94c26e185bc3-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/lucrarile-la-podul-muncii-continua-se-demonteaza-tablierului-central-foto\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/04\/d2be029c-ef24-4bf1-a547-77f7813e25cf.jpeg&#8221;] Viceprimarul Timi\u0219oarei, Ruben La\u021bc\u0103u anun\u021b\u0103 c\u0103 lucr\u0103rile la Podul Iuliu Maniu (Muncii) s-au reluat dup\u0103 minivacan\u021ba de Pa\u0219te. Mar\u021bi au \u00eenceput opera\u021biunile de demontare a tablierului. \u201cMunca pe \u0219antierele Timi\u0219oarei a re\u00eenceput. Podul Iuliu Maniu, unde am \u00eenceput desfacerea tablierului central, adic\u0103 a grinzilor care supratraverseaz\u0103 canalul Bega. Ast\u0103zi vom termina \u00een [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-1881871","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1881871","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1881871"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1881871\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1881871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1881871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1881871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}