{"id":1877361,"date":"2026-04-08T10:36:27","date_gmt":"2026-04-08T07:36:27","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1877361"},"modified":"2026-04-08T10:36:27","modified_gmt":"2026-04-08T07:36:27","slug":"au-inceput-lucrarile-de-asfaltare-pe-drumul-timisoara-sanandrei-in-cadrul-proiectului-de-largire-la-patru-benzi","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1877361","title":{"rendered":"Au \u00eenceput lucr\u0103rile de asfaltare pe drumul Timi\u0219oara &#8211; S\u00e2nandrei, \u00een cadrul proiectului de l\u0103rgire la patru benzi"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/+otf\/1200&#215;630\/urdos0KOVle3GUIVCUgULk5PVF9WRVJZX1NFQxP0Er7ZjOfxSuGDVAVRononB6xWqUtwsWsfxShvF7Or53xrOmsubeVF+xw07x26ghJMHakvIjdF1XD+Mav0MW8=\/564446566809048914756646306805372882256861185510456n.jpg&#8221;]<\/p>\n<article id=\"post-2258311\" class>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Lucr\u0103rile au \u00eenceput \u00een urm\u0103 cu mai pu\u021bin de dou\u0103 luni, iar \u00een prezent \u0219antierul \u00eenainteaz\u0103 \u00eentr-un ritm sus\u021binut, spune Simonis. Pre\u0219edintele CJT a mai declarat c\u0103 evolu\u021bia proiectului ar putea permite finalizarea \u00eenainte de termen, \u00een condi\u021biile men\u021binerii ritmului actual.<\/p>\n<blockquote>\n<p>\u201eAst\u0103zi a \u00eenceput turnarea primului strat de asfalt pe drumul care leag\u0103 Timi\u0219oara de comuna S\u00e2nandrei. \u00cen urm\u0103 cu mai pu\u021bin de dou\u0103 luni am dat ordinul de \u00eencepere a lucr\u0103rilor pentru l\u0103rgirea la patru benzi a acestui sector de drum, iar ast\u0103zi constructorul a\u0219terne primul strat de asfalt. Lucrurile se mi\u0219c\u0103 foarte bine aici, se avanseaz\u0103 \u00eentr-un ritm bun \u0219i dac\u0103 p\u0103str\u0103m caden\u021ba putem finaliza lucrarea \u00eenainte de termenul prev\u0103zut \u00een contract\u201d, a transmis Alfred Simonis.<\/p>\n<\/blockquote>\n<p>Proiectul vizeaz\u0103 l\u0103rgirea la patru benzi a DJ 692, pe un tronson care include \u0219i conexiunea cu DN69, \u00een zona de desc\u0103rcare de pe autostrada A1, pe Calea Aradului. Pe l\u00e2ng\u0103 extinderea carosabilului, investi\u021bia prevede amenajarea de trotuare, piste de biciclete, \u0219an\u021buri \u0219i rigole, intersec\u021bii \u0219i sensuri giratorii, precum \u0219i iluminat public.<\/p>\n<p>Autorit\u0103\u021bile jude\u021bene sus\u021bin c\u0103 dezvoltarea infrastructurii este necesar\u0103 \u00een contextul evolu\u021biei zonei periurbane a Timi\u0219oarei, \u00een special a comunei S\u00e2nandrei, aflat\u0103 \u00een plin proces de extindere.<\/p>\n<p>Lucr\u0103rile la DJ 692 trebuiau finan\u021bate ini\u021bial prin programul \u201eAnghel Saligny\u201d, \u00eens\u0103 contractul nu a putut fi semnat la timp din <em>\u201ecauza unor proceduri greoaie \u0219i a lipsei aten\u021biei \u0219i concentr\u0103rii unor colegi\u201d<\/em>, justific\u0103 Simonis. Pentru a nu am\u00e2na proiectul, Consiliul Jude\u021bean Timi\u0219 a decis s\u0103 finan\u021beze temporar tronsonul din bugetul local, urm\u00e2nd ca fondurile s\u0103 fie recuperate ulterior.<\/p>\n<p>\u00cen februarie a mai fost anun\u021bat c\u0103 proiectul ar putea include \u0219i elemente suplimentare, precum posibile sta\u021bii de autobuz \u0219i treceri de pietoni destinate angaja\u021bilor din zona industrial\u0103.<\/p>\n<p>Investi\u021bia, finan\u021bat\u0103 de Consiliul Jude\u021bean Timi\u0219, este estimat\u0103 la peste 42 de milioane de lei \u0219i are ca termen de finalizare aproximativ 12 luni. Lucr\u0103rile vor fi realizate de asocierea SYLC CON TRANS SRL \u2013 DILUCA PROJECT SRL.<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/au-inceput-lucrarile-de-asfaltare-pe-drumul-timisoara-sanandrei-in-cadrul-proiectului-de-largire-la-patru-benzi-2258311\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Lucr\u0103rile au \u00eenceput \u00een urm\u0103 cu mai pu\u021bin de dou\u0103 luni, iar \u00een prezent \u0219antierul \u00eenainteaz\u0103 \u00eentr-un ritm sus\u021binut, spune Simonis. Pre\u0219edintele CJT a mai declarat c\u0103 evolu\u021bia proiectului ar putea permite finalizarea \u00eenainte de termen, \u00een condi\u021biile men\u021binerii ritmului actual.<\/p>\n<blockquote>\n<p>\u201eAst\u0103zi a \u00eenceput turnarea primului strat de asfalt pe drumul care leag\u0103 Timi\u0219oara de comuna S\u00e2nandrei. \u00cen urm\u0103 cu mai pu\u021bin de dou\u0103 luni am dat ordinul de \u00eencepere a lucr\u0103rilor pentru l\u0103rgirea la patru benzi a acestui sector de drum, iar ast\u0103zi constructorul a\u0219terne primul strat de asfalt. Lucrurile se mi\u0219c\u0103 foarte bine aici, se avanseaz\u0103 \u00eentr-un ritm bun \u0219i dac\u0103 p\u0103str\u0103m caden\u021ba putem finaliza lucrarea \u00eenainte de termenul prev\u0103zut \u00een contract\u201d, a transmis Alfred Simonis.<\/p>\n<\/blockquote>\n<p>Proiectul vizeaz\u0103 l\u0103rgirea la patru benzi a DJ 692, pe un tronson care include \u0219i conexiunea cu DN69, \u00een zona de desc\u0103rcare de pe autostrada A1, pe Calea Aradului. Pe l\u00e2ng\u0103 extinderea carosabilului, investi\u021bia prevede amenajarea de trotuare, piste de biciclete, \u0219an\u021buri \u0219i rigole, intersec\u021bii \u0219i sensuri giratorii, precum \u0219i iluminat public.<\/p>\n<p>Autorit\u0103\u021bile jude\u021bene sus\u021bin c\u0103 dezvoltarea infrastructurii este necesar\u0103 \u00een contextul evolu\u021biei zonei periurbane a Timi\u0219oarei, \u00een special a comunei S\u00e2nandrei, aflat\u0103 \u00een plin proces de extindere.<\/p>\n<p>Lucr\u0103rile la DJ 692 trebuiau finan\u021bate ini\u021bial prin programul \u201eAnghel Saligny\u201d, \u00eens\u0103 contractul nu a putut fi semnat la timp din <em>\u201ecauza unor proceduri greoaie \u0219i a lipsei aten\u021biei \u0219i concentr\u0103rii unor colegi\u201d<\/em>, justific\u0103 Simonis. Pentru a nu am\u00e2na proiectul, Consiliul Jude\u021bean Timi\u0219 a decis s\u0103 finan\u021beze temporar tronsonul din bugetul local, urm\u00e2nd ca fondurile s\u0103 fie recuperate ulterior.<\/p>\n<p>\u00cen februarie a mai fost anun\u021bat c\u0103 proiectul ar putea include \u0219i elemente suplimentare, precum posibile sta\u021bii de autobuz \u0219i treceri de pietoni destinate angaja\u021bilor din zona industrial\u0103.<\/p>\n<p>Investi\u021bia, finan\u021bat\u0103 de Consiliul Jude\u021bean Timi\u0219, este estimat\u0103 la peste 42 de milioane de lei \u0219i are ca termen de finalizare aproximativ 12 luni. Lucr\u0103rile vor fi realizate de asocierea SYLC CON TRANS SRL \u2013 DILUCA PROJECT SRL.<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/au-inceput-lucrarile-de-asfaltare-pe-drumul-timisoara-sanandrei-in-cadrul-proiectului-de-largire-la-patru-benzi-2258311\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.tion.ro\/stirile-judetului-timis\/au-inceput-lucrarile-de-asfaltare-pe-drumul-timisoara-sanandrei-in-cadrul-proiectului-de-largire-la-patru-benzi-2258311\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/04\/+otf\/1200&#215;630\/urdos0KOVle3GUIVCUgULk5PVF9WRVJZX1NFQxP0Er7ZjOfxSuGDVAVRononB6xWqUtwsWsfxShvF7Or53xrOmsubeVF+xw07x26ghJMHakvIjdF1XD+Mav0MW8=\/564446566809048914756646306805372882256861185510456n.jpg&#8221;] Lucr\u0103rile au \u00eenceput \u00een urm\u0103 cu mai pu\u021bin de dou\u0103 luni, iar \u00een prezent \u0219antierul \u00eenainteaz\u0103 \u00eentr-un ritm sus\u021binut, spune Simonis. Pre\u0219edintele CJT a mai declarat c\u0103 evolu\u021bia proiectului ar putea permite finalizarea \u00eenainte de termen, \u00een condi\u021biile men\u021binerii ritmului actual. \u201eAst\u0103zi a \u00eenceput turnarea primului strat de asfalt pe drumul care [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,191],"class_list":["post-1877361","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-tion-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1877361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1877361"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1877361\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1877361"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1877361"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1877361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}