{"id":1870710,"date":"2026-04-07T12:42:40","date_gmt":"2026-04-07T09:42:40","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1870710"},"modified":"2026-04-07T12:42:40","modified_gmt":"2026-04-07T09:42:40","slug":"primii-43-km-ai-drumului-expres-suceava-siret-au-constructori-desemnati-asocierea-far-foundation-srl-automagistral-pivden-srl-lincor-trans-srl-va-proiecta-si-va-executa","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1870710","title":{"rendered":"Primii 43 km ai Drumului Expres Suceava \u2013 Siret au constructori desemna\u021bi. Asocierea FAR FOUNDATION SRL \u2013 AUTOMAGISTRAL PIVDEN SRL \u2013 LINCOR TRANS SRL va proiecta \u0219i va executa loturile 1 \u0219i 2 ale Drumului Expres Suceava-Siret, \u00een valoare total\u0103 de 3,72 miliarde de lei"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret.jpghttps:\/\/cdn.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret.jpg&#8221;]<\/p>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-a-rec td-a-rec-id-content_top  tdi_3 td_block_template_1\"><strong>Intr\u0103 acum \u0219i \u00een grupul de <\/p>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/t.me\/+TH8wcfnp8fw5NWI0\">Telegram News Bucovina<\/a><\/div>\n<p><\/strong><\/div>\n<p>Directorul general al Companiei Na\u021bionale de Administrare a Infrastructurii Rutiere (CNAIR), Cristian Pistol, a anun\u021bat desemnarea constructorului pentru primele dou\u0103 loturi ale Drumului Expres Suceava \u2013 Siret, \u00een lungime total\u0103 de 43,05 km.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"578\" src=\"https:\/\/cdn.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret-1024x578.jpg\" alt class=\"wp-image-435784\"><\/a><\/figure>\n<p>Asocierea <strong>FAR FOUNDATION SRL \u2013 AUTOMAGISTRAL PIVDEN SRL \u2013 LINCOR TRANS SRL<\/strong> va proiecta \u0219i executa Loturile 1 \u0219i 2 ale DEx Suceava \u2013 Siret, cu o valoare total\u0103 de <strong>3,72 miliarde de lei (f\u0103r\u0103 TVA)<\/strong>.<\/p>\n<p><strong>Detalii tehnice ale contractelor:<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li><strong>Lotul 1 (Suceava \u2013 D\u0103rm\u0103ne\u0219ti)<\/strong>: 18,6 km, valoare 2,09 miliarde lei (f\u0103r\u0103 TVA). Termen: 9 luni proiectare + 24 luni execu\u021bie.<\/li>\n<li><strong>Lotul 2 (D\u0103rm\u0103ne\u0219ti \u2013 B\u0103lc\u0103u\u021bi)<\/strong>: 24,45 km, valoare 1,63 miliarde lei (f\u0103r\u0103 TVA). Termen: 12 luni proiectare + 24 luni execu\u021bie.<\/li>\n<\/ul>\n<p>Pe \u00eentregul traseu vor fi construite <strong>57 de structuri<\/strong> (poduri, pasaje \u0219i viaducte) \u0219i <strong>4 noduri rutiere<\/strong>: Suceava Nord (DN29A), Suceava Vest (DN2-DN2P), DN2-DN2H (R\u0103d\u0103u\u021bi) \u0219i DN2 (Siret Sud). Contractul prevede \u0219i amenajarea de parc\u0103ri dotate cu sta\u021bii de \u00eenc\u0103rcare pentru vehicule electrice.<\/p>\n<p>Toate contractele de proiectare \u0219i execu\u021bie pentru DEx Suceava \u2013 Siret (55,7 km) trebuie semnate p\u00e2n\u0103 la sf\u00e2r\u0219itul lunii mai 2026, iar lucr\u0103rile urmeaz\u0103 s\u0103 fie finalizate cel mai t\u00e2rziu \u00een <strong>2030<\/strong>, conform condi\u021biilor de finan\u021bare prin instrumentul european SAFE.<\/p>\n<p>Drumul Expres Suceava \u2013 Siret va avea at\u00e2t rol civil, c\u00e2t \u0219i militar, asigur\u00e2nd o conexiune strategic\u0103 \u00eentre infrastructura rutier\u0103 din Rom\u00e2nia \u0219i cea din Ucraina.<\/p>\n<p>Prin SAFE, Rom\u00e2nia beneficiaz\u0103 de 4,2 miliarde de euro (f\u0103r\u0103 TVA) pentru infrastructur\u0103 rutier\u0103, din care CNAIR deruleaz\u0103 proiecte \u00een valoare de aproximativ 3 miliarde de euro, incluz\u00e2nd \u0219i tronsonul de autostrad\u0103 Pa\u0219cani \u2013 Suceava (61,86 km).<\/p>\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\">\n<div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube-embed\" data-video_id=\"TV7_7FmV9f0\"><iframe loading=\"lazy\" title=\"Cum s\u0103 tr\u0103ie\u0219ti cu \u0218obolanii la poart\u0103!! C\u00e2t de mult \u00ee\u0219i ur\u0103\u0219te Primarul oamenii ??? #Garda \" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/TV7_7FmV9f0?start=1&amp;feature=oembed\" frameborder allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div>\n<\/figure>\n<div class=\"td-a-rec td-a-rec-id-content_bottom  tdi_4 td_block_template_1\"><strong>Intr\u0103 acum \u0219i \u00een grupul de <\/p>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/t.me\/+TH8wcfnp8fw5NWI0\">Telegram News Bucovina<\/a><\/div>\n<p><\/strong><\/div>\n<\/div>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-a-rec td-a-rec-id-content_top  tdi_3 td_block_template_1\"><strong>Intr\u0103 acum \u0219i \u00een grupul de <\/p>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/t.me\/+TH8wcfnp8fw5NWI0\">Telegram News Bucovina<\/a><\/div>\n<p><\/strong><\/div>\n<p>Directorul general al Companiei Na\u021bionale de Administrare a Infrastructurii Rutiere (CNAIR), Cristian Pistol, a anun\u021bat desemnarea constructorului pentru primele dou\u0103 loturi ale Drumului Expres Suceava \u2013 Siret, \u00een lungime total\u0103 de 43,05 km.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"578\" src=\"https:\/\/cdn.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret-1024x578.jpg\" alt class=\"wp-image-435784\"><\/a><\/figure>\n<p>Asocierea <strong>FAR FOUNDATION SRL \u2013 AUTOMAGISTRAL PIVDEN SRL \u2013 LINCOR TRANS SRL<\/strong> va proiecta \u0219i executa Loturile 1 \u0219i 2 ale DEx Suceava \u2013 Siret, cu o valoare total\u0103 de <strong>3,72 miliarde de lei (f\u0103r\u0103 TVA)<\/strong>.<\/p>\n<p><strong>Detalii tehnice ale contractelor:<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li><strong>Lotul 1 (Suceava \u2013 D\u0103rm\u0103ne\u0219ti)<\/strong>: 18,6 km, valoare 2,09 miliarde lei (f\u0103r\u0103 TVA). Termen: 9 luni proiectare + 24 luni execu\u021bie.<\/li>\n<li><strong>Lotul 2 (D\u0103rm\u0103ne\u0219ti \u2013 B\u0103lc\u0103u\u021bi)<\/strong>: 24,45 km, valoare 1,63 miliarde lei (f\u0103r\u0103 TVA). Termen: 12 luni proiectare + 24 luni execu\u021bie.<\/li>\n<\/ul>\n<p>Pe \u00eentregul traseu vor fi construite <strong>57 de structuri<\/strong> (poduri, pasaje \u0219i viaducte) \u0219i <strong>4 noduri rutiere<\/strong>: Suceava Nord (DN29A), Suceava Vest (DN2-DN2P), DN2-DN2H (R\u0103d\u0103u\u021bi) \u0219i DN2 (Siret Sud). Contractul prevede \u0219i amenajarea de parc\u0103ri dotate cu sta\u021bii de \u00eenc\u0103rcare pentru vehicule electrice.<\/p>\n<p>Toate contractele de proiectare \u0219i execu\u021bie pentru DEx Suceava \u2013 Siret (55,7 km) trebuie semnate p\u00e2n\u0103 la sf\u00e2r\u0219itul lunii mai 2026, iar lucr\u0103rile urmeaz\u0103 s\u0103 fie finalizate cel mai t\u00e2rziu \u00een <strong>2030<\/strong>, conform condi\u021biilor de finan\u021bare prin instrumentul european SAFE.<\/p>\n<p>Drumul Expres Suceava \u2013 Siret va avea at\u00e2t rol civil, c\u00e2t \u0219i militar, asigur\u00e2nd o conexiune strategic\u0103 \u00eentre infrastructura rutier\u0103 din Rom\u00e2nia \u0219i cea din Ucraina.<\/p>\n<p>Prin SAFE, Rom\u00e2nia beneficiaz\u0103 de 4,2 miliarde de euro (f\u0103r\u0103 TVA) pentru infrastructur\u0103 rutier\u0103, din care CNAIR deruleaz\u0103 proiecte \u00een valoare de aproximativ 3 miliarde de euro, incluz\u00e2nd \u0219i tronsonul de autostrad\u0103 Pa\u0219cani \u2013 Suceava (61,86 km).<\/p>\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\">\n<div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube-embed\" data-video_id=\"TV7_7FmV9f0\"><iframe loading=\"lazy\" title=\"Cum s\u0103 tr\u0103ie\u0219ti cu \u0218obolanii la poart\u0103!! C\u00e2t de mult \u00ee\u0219i ur\u0103\u0219te Primarul oamenii ??? #Garda \" width=\"696\" height=\"392\" src=\"https:\/\/www.youtube.com\/embed\/TV7_7FmV9f0?start=1&amp;feature=oembed\" frameborder allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div>\n<\/figure>\n<div class=\"td-a-rec td-a-rec-id-content_bottom  tdi_4 td_block_template_1\"><strong>Intr\u0103 acum \u0219i \u00een grupul de <\/p>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/t.me\/+TH8wcfnp8fw5NWI0\">Telegram News Bucovina<\/a><\/div>\n<p><\/strong><\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.newsbucovina.ro\/actualitate\/435783\/primii-43-km-ai-drumului-expres-suceava-siret-au-constructori-desemnati-asocierea-far-foundation-srl-automagistral-pivden-srl-lincor-trans-srl-va-proiecta-si-va-executa&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret.jpghttps:\/\/cdn.newsbucovina.ro\/wp-content\/uploads\/2026\/04\/drum-expres-Suceava-Siret.jpg&#8221;] Intr\u0103 acum \u0219i \u00een grupul de Telegram News Bucovina Directorul general al Companiei Na\u021bionale de Administrare a Infrastructurii Rutiere (CNAIR), Cristian Pistol, a anun\u021bat desemnarea constructorului pentru primele dou\u0103 loturi ale Drumului Expres Suceava \u2013 Siret, \u00een lungime total\u0103 de 43,05 km. Asocierea FAR FOUNDATION SRL \u2013 AUTOMAGISTRAL PIVDEN SRL \u2013 LINCOR [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,165],"class_list":["post-1870710","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-newsbucovina-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1870710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1870710"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1870710\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1870710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1870710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1870710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}