{"id":1867771,"date":"2026-04-06T06:00:48","date_gmt":"2026-04-06T03:00:48","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1867771"},"modified":"2026-04-06T06:00:48","modified_gmt":"2026-04-06T03:00:48","slug":"drumul-expres-tulcea-braila-in-comitetul-tehnic-de-avizare-al-cnir-ziarul-delta-tulcea","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1867771","title":{"rendered":"Drumul expres Tulcea &#8211; Br\u0103ila, \u00een Comitetul Tehnic de Avizare al CNIR &#8211; Ziarul Delta Tulcea"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/04\/Drumul-expres.jpg&#8221;]<\/p>\n<article id=\"post-36082\" class=\"module single-post-module post-36082 post type-post status-publish format-standard has-post-thumbnail hentry category-stirea-zilei et-has-post-format-content et_post_format-et-post-format-standard\">\n<div class=\"post-header\">\n<h1 class=\"entry-title\">Drumul expres Tulcea \u2013 Br\u0103ila, \u00een Comitetul Tehnic de Avizare al CNIR<\/h1>\n<div class=\"post-meta vcard\">\n<p>Posted by <a href=\"https:\/\/ziaruldelta.ro\/author\/nicoleta-urmuz\/\" class=\"url fn\" title=\"Posts by Nicoleta URMUZ\" rel=\"author\">Nicoleta URMUZ<\/a> | <span class=\"updated\">Apr 6, 2026<\/span> | <a href=\"https:\/\/ziaruldelta.ro\/category\/stirea-zilei\/\" rel=\"tag\">Stirea Zilei<\/a> | <\/p>\n<\/div>\n<\/div>\n<div class=\"post-thumbnail header\"><img decoding=\"async\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/04\/Drumul-expres.jpg\" alt=\"Drumul expres Tulcea \u2013 Br\u0103ila, \u00een Comitetul Tehnic de Avizare al CNIR\"><\/div>\n<div class=\"post-wrap\">\n<div class=\"post-content entry-content\">\n<p>Miercuri, 8 aprilie 2026, investi\u0163ia privind drumul expres care leag\u0103 municipiul Tulcea de Br\u0103ila este programat\u0103 s\u0103 intre \u00een analiz\u0103 \u00een cadrul Comitetului Tehnic de Avizare al Companiei Na\u0163ionale de Investi\u0163ii Rutiere (CNIR). Dup\u0103 acest pas, urmeaz\u0103 s\u0103 primeasc\u0103 avizul final \u00een cadrul Comitetului Tehnic Economic al Ministerului Transporturilor, a anun\u0163at, vineri, Consiliul Jude\u0163ean Tulcea.<\/p>\n<p>Traseul de 61,6 km se desf\u0103\u015foar\u0103 aproape paralel cu DN 22, incluz\u00e2nd localit\u0103\u0163ile Sm\u00e2rdan, Jijila, V\u0103c\u0103reni, Luncavi\u0163a, Isaccea, Niculi\u0163el, Frec\u0103\u0163ei, Somova, Nalbant \u015fi Mihail Kog\u0103lniceanu.<\/p>\n<p>Traseul propus este proiectat pentru o vitez\u0103 de circula\u0163ie de 120 km\/h.<\/p>\n<p>Citi\u0163i continuarea \u00een edi\u0163ia tip\u0103rit\u0103 a ziarului Delta.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-footer\">\n<div class=\"social-icons ed-social-share-icons\">\n<p class=\"share-title\">Share:<\/p>\n<\/div>\n<div class=\"rating-stars\">\n<p id=\"rate-title\" class=\"rate-title\">Rate:<\/p>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"post-content entry-content\">\n<p>Miercuri, 8 aprilie 2026, investi\u0163ia privind drumul expres care leag\u0103 municipiul Tulcea de Br\u0103ila este programat\u0103 s\u0103 intre \u00een analiz\u0103 \u00een cadrul Comitetului Tehnic de Avizare al Companiei Na\u0163ionale de Investi\u0163ii Rutiere (CNIR). Dup\u0103 acest pas, urmeaz\u0103 s\u0103 primeasc\u0103 avizul final \u00een cadrul Comitetului Tehnic Economic al Ministerului Transporturilor, a anun\u0163at, vineri, Consiliul Jude\u0163ean Tulcea.<\/p>\n<p>Traseul de 61,6 km se desf\u0103\u015foar\u0103 aproape paralel cu DN 22, incluz\u00e2nd localit\u0103\u0163ile Sm\u00e2rdan, Jijila, V\u0103c\u0103reni, Luncavi\u0163a, Isaccea, Niculi\u0163el, Frec\u0103\u0163ei, Somova, Nalbant \u015fi Mihail Kog\u0103lniceanu.<\/p>\n<p>Traseul propus este proiectat pentru o vitez\u0103 de circula\u0163ie de 120 km\/h.<\/p>\n<p>Citi\u0163i continuarea \u00een edi\u0163ia tip\u0103rit\u0103 a ziarului Delta.<\/p>\n<\/div>\n<div class=\"post-content entry-content\">\n<p>Miercuri, 8 aprilie 2026, investi\u0163ia privind drumul expres care leag\u0103 municipiul Tulcea de Br\u0103ila este programat\u0103 s\u0103 intre \u00een analiz\u0103 \u00een cadrul Comitetului Tehnic de Avizare al Companiei Na\u0163ionale de Investi\u0163ii Rutiere (CNIR). Dup\u0103 acest pas, urmeaz\u0103 s\u0103 primeasc\u0103 avizul final \u00een cadrul Comitetului Tehnic Economic al Ministerului Transporturilor, a anun\u0163at, vineri, Consiliul Jude\u0163ean Tulcea.<\/p>\n<p>Traseul de 61,6 km se desf\u0103\u015foar\u0103 aproape paralel cu DN 22, incluz\u00e2nd localit\u0103\u0163ile Sm\u00e2rdan, Jijila, V\u0103c\u0103reni, Luncavi\u0163a, Isaccea, Niculi\u0163el, Frec\u0103\u0163ei, Somova, Nalbant \u015fi Mihail Kog\u0103lniceanu.<\/p>\n<p>Traseul propus este proiectat pentru o vitez\u0103 de circula\u0163ie de 120 km\/h.<\/p>\n<p>Citi\u0163i continuarea \u00een edi\u0163ia tip\u0103rit\u0103 a ziarului Delta.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/ziaruldelta.ro\/2026\/04\/06\/drumul-expres-tulcea-braila-in-comitetul-tehnic-de-avizare-al-cnir\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/04\/Drumul-expres.jpg&#8221;] Drumul expres Tulcea \u2013 Br\u0103ila, \u00een Comitetul Tehnic de Avizare al CNIR Posted by Nicoleta URMUZ | Apr 6, 2026 | Stirea Zilei | Miercuri, 8 aprilie 2026, investi\u0163ia privind drumul expres care leag\u0103 municipiul Tulcea de Br\u0103ila este programat\u0103 s\u0103 intre \u00een analiz\u0103 \u00een cadrul Comitetului Tehnic de Avizare al Companiei [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,206],"class_list":["post-1867771","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-ziaruldelta-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1867771","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1867771"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1867771\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1867771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1867771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1867771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}