{"id":1866925,"date":"2026-04-03T08:56:57","date_gmt":"2026-04-03T05:56:57","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1866925"},"modified":"2026-04-03T08:56:57","modified_gmt":"2026-04-03T05:56:57","slug":"modernizarea-infrastructurii-feroviare-pe-lotul-4-ronat-triaj-arad-lucrarile-continua-pe-mai-multe","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1866925","title":{"rendered":"Modernizarea infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad: lucr\u0103rile continu\u0103 pe mai multe"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/04\/lot-4-ronat-arad.pnghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/04\/lot-4-ronat-arad.png&#8221;]<\/p>\n<div class=\"entry-content\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"377\" src=\"https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/04\/lot-4-ronat-arad-800x377.png\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Modernizarea infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad: lucr\u0103rile continu\u0103 pe mai multe fronturi, cu un stadiu de aproape 29%\" title=\"Modernizarea infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad: lucr\u0103rile continu\u0103 pe mai multe fronturi, cu un stadiu de aproape 29% (video) 1\"><\/p>\n<h4>Modernizarea infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad: lucr\u0103rile continu\u0103 pe mai multe fronturi, cu un stadiu de aproape 29%<\/h4>\n<p>Lucr\u0103rile de modernizare a infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad au atins un stadiu de execu\u021bie de 28,81%.<\/p>\n<p>Interven\u021biile se desf\u0103\u0219oar\u0103 pe mai multe fronturi, viz\u00e2nd at\u00e2t modernizarea liniei de cale ferat\u0103, instala\u021biilor c\u00e2t \u0219i lucr\u0103ri civile.<\/p>\n<p>Constructorul Webuild SpA \u2013 Partecipazioni Italia SpA \u2013 Salcef SpA are mobilizate echipe de lucru pe \u00eentreaga lungime a tronsonului, de 54,86 km, transmite CFR Infrastructur\u0103 Timi\u0219oara.<\/p>\n<p>\u00cen prezent, lucr\u0103rile se desf\u0103\u0219oar\u0103 sus\u021binut pe mai multe fronturi.<\/p>\n<p>Se lucreaz\u0103 la execu\u021bia lucr\u0103rilor de terasamente \u00een sta\u021biile S\u00e2nandrei, B\u0103ile C\u0103lacea \u0219i Vinga, precum \u0219i pe intervalele S\u00e2nandrei \u2013 B\u0103ile C\u0103lacea, Vinga \u2013 \u0218ag \u0219i \u0218ag \u2013 Aradul Nou \u2013 Glogov\u0103\u021b. Acestea includ a\u0219ternerea de geotextil geogrile, realizarea umpluturilor pentru straturi \u0219i substraturi, excava\u021bii pentru platform\u0103 \u0219i a\u0219ternerea stratului de piatr\u0103.<\/p>\n<h2>CITE\u0218TE \u0218I: <span><a href=\"https:\/\/renasterea.ro\/accident-in-timisoara-un-sofer-a-acrosat-sase-masini-parcate-regulamentar-apoi-s-a-oprit-intr-un-gard\/\" target=\"_blank\" rel=\"noopener\">Accident \u00een Timi\u0219oara. Un \u0219ofer a acro\u0219at \u0219ase ma\u0219ini parcate regulamentar, apoi s-a oprit \u00eentr-un gard<\/a><\/span><\/h2>\n<p>De asemenea, au loc lucr\u0103ri de armare, cofrare \u0219i betonare la Culeea 1 a pasajului situat la km 18+729, \u00eentre S\u00e2nandrei \u0219i B\u0103ile C\u0103lacea.<\/p>\n<p>Constructorii lucreaz\u0103 la execu\u021bia pilo\u021bilor, realizarea umpluturilor \u0219i armarea eleva\u021biilor, precum \u0219i lucr\u0103ri de \u00eentre\u021binere a platformei la pasajul Aradul Nou, km 5+330.<\/p>\n<p>Au loc \u0219i lucr\u0103ri de sudur\u0103 \u0219i verificare a sudurilor, str\u00e2ngerea \u0219uruburilor, aplicarea grundului, precum \u0219i montarea \u0219i fixarea elementelor componente ale pasarelei la Podul Mure\u0219, km 2+600, precum \u0219i lucr\u0103ri de relocare a cablurilor de fibr\u0103 optic\u0103 TTR pe intervalul B\u0103ile C\u0103lacea \u2013 Or\u021bi\u0219oara, construc\u021bia turnului GSM-R \u00een sta\u021bia Vinga, relocarea utilit\u0103\u021bilor \u00een sta\u021bia Aradul Nou, precum \u0219i s\u0103p\u0103turi \u0219i montare de st\u00e2lpi LC pe intervalul Vinga \u2013 \u0218ag.<\/p>\n<p>Totodat\u0103, se execut\u0103 montarea de traverse noi pe firul I \u00eentre S\u00e2nandrei \u0219i B\u0103ile C\u0103lacea.<\/p>\n<p>\u201dLotul 4 Rona\u021b Triaj \u2013 Arad reprezint\u0103 punctul de convergen\u021b\u0103 strategic \u00eentre Magistrala 100 \u0219i Magistrala 200, func\u021bion\u00e2nd ca o verig\u0103 vital\u0103 care transform\u0103 segmente izolate \u00eentr-un coridor feroviar unitar \u0219i modern, esen\u021bial pentru tranzitul rapid \u00eentre sudul, vestul \u0219i centrul \u021b\u0103rii\u201d, precizeaz\u0103 CFR Infrastructur\u0103 Timi\u0219oara.<\/p>\n<iframe loading=\"lazy\" src=\"https:\/\/www.facebook.com\/plugins\/video.php?height=314&amp;href=https%3A%2F%2Fwww.facebook.com%2Freel%2F1641652527030666%2F&amp;show_text=false&amp;width=560&amp;t=0\" width=\"560\" height=\"314\" frameborder scrolling=\"no\" allowfullscreen=\"allowfullscreen\"><\/iframe>\n<p><em><strong>Sursa foto: captur\u0103 video<\/strong><\/em><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/renasterea.ro\/modernizarea-infrastructurii-feroviare-pe-lotul-4-ronat-triaj-arad-lucrarile-continua-pe-mai-multe-fronturi-cu-un-stadiu-de-aproape-29-video\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/04\/lot-4-ronat-arad.pnghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/04\/lot-4-ronat-arad.png&#8221;] Modernizarea infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad: lucr\u0103rile continu\u0103 pe mai multe fronturi, cu un stadiu de aproape 29% Lucr\u0103rile de modernizare a infrastructurii feroviare pe Lotul 4 Rona\u021b Triaj \u2013 Arad au atins un stadiu de execu\u021bie de 28,81%. Interven\u021biile se desf\u0103\u0219oar\u0103 pe mai multe fronturi, viz\u00e2nd at\u00e2t [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,188],"class_list":["post-1866925","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-renasterea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1866925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1866925"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1866925\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1866925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1866925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1866925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}