{"id":1850517,"date":"2026-03-27T10:33:14","date_gmt":"2026-03-27T07:33:14","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1850517"},"modified":"2026-03-27T10:33:14","modified_gmt":"2026-03-27T07:33:14","slug":"restrictii-de-trafic-odata-cu-inceperea-lucrarilor-in-piata-traian","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1850517","title":{"rendered":"Restric\u021bii de trafic odat\u0103 cu \u00eenceperea lucr\u0103rilor \u00een Pia\u021ba Traian"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;&#8221;]<\/p>\n<div class=\"td-post-content td-pb-padding-side\">\n<p>Constructorul care execut\u0103 lucr\u0103rile de regenerare urban\u0103 din cartierul Fabric se mobilizeaz\u0103 pentru primele interven\u021bii \u00een Pia\u021ba Traian, Pia\u021ba Romanilor, pe axa Dacilor \u2013 \u0218tefan cel Mare \u0219i \u00een zona Sinagogii. \u00cen acest context, Prim\u0103ria Municipiului Timi\u0219oara a aprobat, prin Comisia de Circula\u021bie, restric\u021biile pentru prima din cele \u0219ase etape de lucr\u0103ri, care vor intra \u00een vigoare luni, 30 martie.<\/p>\n<p>\u00cen aceast\u0103 etap\u0103, circula\u021bia auto va fi \u00eenchis\u0103 pe Podul Dacilor, strict pe direc\u021bia spre Pia\u021ba Traian, precum \u0219i pe Strada Dacilor. \u0218oferii care vin dinspre Pia\u021ba Badea C\u00e2r\u021ban vor fi devia\u021bi pe Splaiul Mele\u021bie Dr\u0103ghici. Circula\u021bia de pe Splaiul Nistrului nu va fi afectat\u0103.<\/p>\n<p>Totodat\u0103, circula\u021bia auto va fi \u00eenchis\u0103 pe bulevardul \u0218tefan cel Mare, \u00eentre Palatul \u0218tefania \u0219i intersec\u021bia de la Fabrica de Bere. \u0218oferii care vin dinspre Calea Buzia\u0219ului vor fi devia\u021bi pe strada Pestalozzi sau spre Podul Andrei \u0218aguna.<\/p>\n<p>Vehiculele vor putea circula \u00een continuare pe axa Podul Decebal \u2013 3 August 1919 \u2013 Ion Mihalache \u2013 Prin\u021bul Turcesc.<\/p>\n<p>Pentru demararea lucr\u0103rilor din Pia\u021ba Traian, accesul auto \u0219i pietonal pe suprafa\u021ba pie\u021bei va fi restric\u021bionat, inclusiv pe lateralele dinspre Biserica Ortodox\u0103 S\u00e2rb\u0103 \u0219i Palatul Mercur.<\/p>\n<p>\u00cen zona Pie\u021bei Romanilor, str\u0103zile laterale vor fi \u00eenchise circula\u021biei auto, precum \u0219i str\u0103zile Gheorghe Marinescu, Episcop Joseph Lonovici \u0219i Episcop Joseph Nischbach. Vehiculele vor putea circula \u00een continuare pe strada Ion Luca Caragiale, \u00eens\u0103 vor \u00eentoarce obligatoriu pe aceea\u0219i strad\u0103.<\/p>\n<p>Totodat\u0103, \u00eencep\u00e2nd cu 6 aprilie, circula\u021bia tramvaielor pe axa Dacilor \u2013 \u0218tefan cel Mare va fi oprit\u0103 pe perioada lucr\u0103rilor. Societatea de Transport Public Timi\u0219oara va comunica detalii privind modific\u0103rile pentru liniile 1, 2, 4, 5 \u0219i 6. Tramvaiele care \u00eentorc, de regul\u0103, la Sta\u021bia Meteo \u00ee\u0219i vor completa traseul la bucla de la Gara de Est.<\/p>\n<p>Pe perioada \u0219antierului, riveranii vor avea acces la cur\u021bile imobilelor, iar constructorul va asigura condi\u021biile necesare pentru accesul \u0219i siguran\u021ba pietonilor.<\/p>\n<p>Fiecare etap\u0103 de lucr\u0103ri va dura estimativ patru luni, iar etapizarea este disponibil\u0103 aici:\u00a0<strong><a href=\"https:\/\/www.primariatm.ro\/2026\/03\/17\/prezentarea-etapelor-lucrarii\" target=\"_blank\" rel=\"noopener\">https:\/\/www.primariatm.ro\/2026\/03\/17\/prezentarea-etapelor-lucrarii<\/a><\/strong><\/p>\n<p>Lucr\u0103rile, estimate la 24 de luni, vor fi executate de asocierea PORR Construct SRL \u0219i Electroechipament Industrial SRL, iar valoarea contractului de execu\u021bie se ridic\u0103 la 109,5 milioane lei (f\u0103r\u0103 TVA). Valoarea total\u0103 a investi\u021biei este de 34 de milioane de euro, iar Prim\u0103ria Timi\u0219oara a atras o finan\u021bare european\u0103 nerambursabil\u0103 \u00een valoare de peste 14 milioane de euro prin Programul Regional Vest 2021-2027, Interven\u021bia Regional\u0103 7.1.A \u2013 Revitalizare \u0219i Regenerare Urban\u0103.<\/p>\n<div class=\"gal-container photobox-lightbox \">\n<div>\n\t\t\tRestric\u021bii de trafic odat\u0103 cu \u00eenceperea lucr\u0103rilor \u00een Pia\u021ba Traian\t\t<\/div>\n<div class=\"gallery1\" id=\"weblizar_124449\">\n<div class=\"col-md-6 col-sm-6 wl-gallery\">\n<div class=\"b-link-fade b-animate-go\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-2.png\" class=\"gall-img-responsive\" alt><\/p>\n<div class=\"b-wrapper\">\n<p class=\"b-from-right b-animate b-delay03\"><a href=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-2.png\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-2.png\" class=\"gall-img-responsive\" alt><\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"col-md-6 col-sm-6 wl-gallery\">\n<div class=\"b-link-fade b-animate-go\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-3.png\" class=\"gall-img-responsive\" alt><\/p>\n<div class=\"b-wrapper\">\n<p class=\"b-from-right b-animate b-delay03\"><a href=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-3.png\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-3.png\" class=\"gall-img-responsive\" alt><\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"col-md-6 col-sm-6 wl-gallery\">\n<div class=\"b-link-fade b-animate-go\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-1.png\" class=\"gall-img-responsive\" alt><\/p>\n<div class=\"b-wrapper\">\n<p class=\"b-from-right b-animate b-delay03\"><a href=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-1.png\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-1.png\" class=\"gall-img-responsive\" alt><\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"col-md-6 col-sm-6 wl-gallery\">\n<div class=\"b-link-fade b-animate-go\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-4.png\" class=\"gall-img-responsive\" alt><\/p>\n<div class=\"b-wrapper\">\n<p class=\"b-from-right b-animate b-delay03\"><a href=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-4.png\"><img decoding=\"async\" src=\"https:\/\/timisplus.ro\/wp-content\/uploads\/2026\/03\/Traian-4.png\" class=\"gall-img-responsive\" alt><\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/timisplus.ro\/restrictii-de-trafic-odata-cu-inceperea-lucrarilor-in-piata-traian\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;&#8221;] Constructorul care execut\u0103 lucr\u0103rile de regenerare urban\u0103 din cartierul Fabric se mobilizeaz\u0103 pentru primele interven\u021bii \u00een Pia\u021ba Traian, Pia\u021ba Romanilor, pe axa Dacilor \u2013 \u0218tefan cel Mare \u0219i \u00een zona Sinagogii. \u00cen acest context, Prim\u0103ria Municipiului Timi\u0219oara a aprobat, prin Comisia de Circula\u021bie, restric\u021biile pentru prima din cele \u0219ase etape de lucr\u0103ri, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,195],"class_list":["post-1850517","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-timisplus-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1850517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1850517"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1850517\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1850517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1850517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1850517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}