{"id":1850151,"date":"2026-03-24T09:46:09","date_gmt":"2026-03-24T06:46:09","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1850151"},"modified":"2026-03-24T09:46:09","modified_gmt":"2026-03-24T06:46:09","slug":"zeci-de-milioane-de-euro-pentru-inelul-2","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1850151","title":{"rendered":"Zeci de milioane de euro pentru Inelul 2"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/03\/isho-2.png&#8221;]<\/p>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-post-featured-image\"><a href=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/03\/isho-2.png\" data-caption><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"430\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/03\/isho-2-696x430.png\" alt title=\"isho-2\"><\/a><\/div>\n<p><strong>Primarul Dominic Fritz a semnat contractul de finan\u021bare european\u0103 pentru completarea Inelului 2 \u00een zona de est. Investi\u021bia creeaz\u0103 o nou\u0103 alternativ\u0103 de deplasare \u00eentre nordul \u0219i sudul ora\u0219ului \u0219i redistribuie traficul care tranziteaz\u0103 \u00een prezent cartierul Fabric.<\/strong><\/p>\n<p>Prim\u0103ria Municipiului Timi\u0219oara preg\u0103te\u0219te documenta\u021bia pentru lansarea licita\u021biei lucr\u0103rilor, care includ construirea unui pod pietonal-velo, a unui pod rutier \u0219i realizarea unui bulevard cu patru benzi care va lega Strada Enric Baader de intersec\u021bia J.H. Pestalozzi \u2013 Corneliu Coposu. \u00cen total, Municipiul Timi\u0219oara acceseaz\u0103 78 de milioane de lei prin Programul Regional Vest 2021\u20132027, coordonat de ADR Vest.<\/p>\n<p>Investi\u021bia Prim\u0103riei Timi\u0219oara creeaz\u0103 o nou\u0103 alternativ\u0103 prin completarea Inelului 2 \u00een zona ILSA\/ISHO pe ruta Michelangelo\u2013Strada Enric Baader. Totodat\u0103, proiectul municipalit\u0103\u021bii va fi completat de realizarea unui pasaj peste liniile de cale ferat\u0103, care va lega Strada Enric Baader de Strada Aristide Demetriade.<\/p>\n<p>Pe l\u00e2ng\u0103 tronsonul principal, proiectul municipalit\u0103\u021bii prevede reamenajarea unor artere secundare pe o lungime de peste 1,5 kilometri. Investi\u021bia include Strada Enric Baader (tronson \u00cenfr\u0103\u021birii \u2013 Take Ionescu), Bulevardul Take Ionescu (tronson Baader \u2013 \u00cenfr\u0103\u021birii \u2013 Acad. Dimitrie Gusti), Strada Acad. Dimitrie Gusti (tronson Take Ionescu \u2013 Andrei Mocioni), Splaiul Protopop Mele\u021bie Dr\u0103ghici, Strada Andrei Mocioni, Splaiul Nistrului (tronson Sfetca \u2013 Miclo\u0219i) \u0219i Strada Acad. Corneliu Miclo\u0219i. De asemenea, sunt incluse modernizarea trotuarelor \u0219i amenajarea de piste de biciclete.<\/p>\n<p>Proiectul \u201eAmenajare Inel II de circula\u021bie, sector cuprins \u00eentre strada A. Demetriade \u0219i Bdul. J.H. Pestalozzi, construire pod rutier \u0219i pod pietonal peste canalul Bega\u201d, cod SMIS 357079 este co-finan\u021bat cu 77,9 milioane lei prin Programul Regional (PR) Vest 2021-2027, Interven\u021bia Regional\u0103 5.1B\u2013Decongestionare trafic. Valoarea investi\u021biei este de 136,2 milioane lei, iar municipalitatea contribuie cu 58,2 milioane lei din bugetul local. Durata estimat\u0103 de execu\u021bie a lucr\u0103rilor este de 16 luni de la momentul demar\u0103rii acestora.<\/p>\n<\/div>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-post-featured-image\"><a href=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/03\/isho-2.png\" data-caption><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"430\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/03\/isho-2-696x430.png\" alt title=\"isho-2\"><\/a><\/div>\n<p><strong>Primarul Dominic Fritz a semnat contractul de finan\u021bare european\u0103 pentru completarea Inelului 2 \u00een zona de est. Investi\u021bia creeaz\u0103 o nou\u0103 alternativ\u0103 de deplasare \u00eentre nordul \u0219i sudul ora\u0219ului \u0219i redistribuie traficul care tranziteaz\u0103 \u00een prezent cartierul Fabric.<\/strong><\/p>\n<p>Prim\u0103ria Municipiului Timi\u0219oara preg\u0103te\u0219te documenta\u021bia pentru lansarea licita\u021biei lucr\u0103rilor, care includ construirea unui pod pietonal-velo, a unui pod rutier \u0219i realizarea unui bulevard cu patru benzi care va lega Strada Enric Baader de intersec\u021bia J.H. Pestalozzi \u2013 Corneliu Coposu. \u00cen total, Municipiul Timi\u0219oara acceseaz\u0103 78 de milioane de lei prin Programul Regional Vest 2021\u20132027, coordonat de ADR Vest.<\/p>\n<p>Investi\u021bia Prim\u0103riei Timi\u0219oara creeaz\u0103 o nou\u0103 alternativ\u0103 prin completarea Inelului 2 \u00een zona ILSA\/ISHO pe ruta Michelangelo\u2013Strada Enric Baader. Totodat\u0103, proiectul municipalit\u0103\u021bii va fi completat de realizarea unui pasaj peste liniile de cale ferat\u0103, care va lega Strada Enric Baader de Strada Aristide Demetriade.<\/p>\n<p>Pe l\u00e2ng\u0103 tronsonul principal, proiectul municipalit\u0103\u021bii prevede reamenajarea unor artere secundare pe o lungime de peste 1,5 kilometri. Investi\u021bia include Strada Enric Baader (tronson \u00cenfr\u0103\u021birii \u2013 Take Ionescu), Bulevardul Take Ionescu (tronson Baader \u2013 \u00cenfr\u0103\u021birii \u2013 Acad. Dimitrie Gusti), Strada Acad. Dimitrie Gusti (tronson Take Ionescu \u2013 Andrei Mocioni), Splaiul Protopop Mele\u021bie Dr\u0103ghici, Strada Andrei Mocioni, Splaiul Nistrului (tronson Sfetca \u2013 Miclo\u0219i) \u0219i Strada Acad. Corneliu Miclo\u0219i. De asemenea, sunt incluse modernizarea trotuarelor \u0219i amenajarea de piste de biciclete.<\/p>\n<p>Proiectul \u201eAmenajare Inel II de circula\u021bie, sector cuprins \u00eentre strada A. Demetriade \u0219i Bdul. J.H. Pestalozzi, construire pod rutier \u0219i pod pietonal peste canalul Bega\u201d, cod SMIS 357079 este co-finan\u021bat cu 77,9 milioane lei prin Programul Regional (PR) Vest 2021-2027, Interven\u021bia Regional\u0103 5.1B\u2013Decongestionare trafic. Valoarea investi\u021biei este de 136,2 milioane lei, iar municipalitatea contribuie cu 58,2 milioane lei din bugetul local. Durata estimat\u0103 de execu\u021bie a lucr\u0103rilor este de 16 luni de la momentul demar\u0103rii acestora.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/gazetadinvest.ro\/zeci-de-milioane-de-euro-pentru-inelul-2\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/03\/isho-2.png&#8221;] Primarul Dominic Fritz a semnat contractul de finan\u021bare european\u0103 pentru completarea Inelului 2 \u00een zona de est. Investi\u021bia creeaz\u0103 o nou\u0103 alternativ\u0103 de deplasare \u00eentre nordul \u0219i sudul ora\u0219ului \u0219i redistribuie traficul care tranziteaz\u0103 \u00een prezent cartierul Fabric. Prim\u0103ria Municipiului Timi\u0219oara preg\u0103te\u0219te documenta\u021bia pentru lansarea licita\u021biei lucr\u0103rilor, care includ construirea unui pod [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,203],"class_list":["post-1850151","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-gazetadinvest-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1850151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1850151"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1850151\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1850151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1850151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1850151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}