{"id":1843594,"date":"2026-03-21T17:13:31","date_gmt":"2026-03-21T14:13:31","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1843594"},"modified":"2026-03-21T17:13:31","modified_gmt":"2026-03-21T14:13:31","slug":"peste-300-de-muncitori-si-85-de-utilaje-pe-sectiunea-margina-holdea-de-pe-autostrada-a1-video","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1843594","title":{"rendered":"Peste 300 de muncitori \u0219i 85 de utilaje pe sec\u021biunea Margina &#8211; Holdea de pe autostrada A1 (video)"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/margina-holdea.jpghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/margina-holdea.jpg&#8221;]<\/p>\n<div class=\"entry-content\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"435\" src=\"https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/margina-holdea-800x435.jpg\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Peste 300 de muncitori \u0219i 85 de utilaje pe sec\u021biunea Margina - Holdea de pe autostrada A1 (video)\" title=\"Peste 300 de muncitori \u0219i 85 de utilaje pe sec\u021biunea Margina - Holdea de pe autostrada A1 (video) 1\"><\/p>\n<h4>Asocierea de constructori rom\u00e2ni \u0219i bosniaci (UMB Spedition-EuroAsfalt) este mobilizat\u0103 \u00een \u0219antier cu 330 de muncitori \u0219i 85 de utilaje, pe sec\u021biunea Margina \u2013 Holdea a autostr\u0103zii Lugoj-Deva (A1).<\/h4>\n<p>Pe cei 9,13 km ai \u0219antierului, stadiul fizic este de 56%, a informat s\u00e2mb\u0103t\u0103 Cristian Pistol, directorul general al Companiei Na\u0163ionale de Administrare a Infrastructurii Rutiere (CNAIR) SA!<\/p>\n<p>Tunelul 1:<br \/>\n\u2013 s-au finalizat excava\u021biile \u0219i lucr\u0103rile de torcretare \u00een ambele galerii (galeria de pe calea 2 are o lungime de 415 m \u0219i galeria de pe calea 1 are o lungime de 367,5 m),<br \/>\n\u2013 funda\u021biile boltei \u00eentoarse au fost finalizate la ambele galerii,<br \/>\n\u2013 \u00een galeria de pe calea 2 a fost deja montat\u0103 hidroizola\u021bia pe o lungime de 340 m, iar \u00een galeria de pe calea 1, a fost montata hidroizila\u021bia pe o lungime de 324 m.<br \/>\n\u00cen momentul de fa\u021b\u0103 se poate traversa cu ma\u0219ina galeria de pe sensul N\u0103dlac- Sibiu (calea 2).<\/p>\n<p>Tunelul 2:<br \/>\n\u2013 la galeria de pe calea 2 (\u00een lungime de 1985 m) s-au excavat 930 m.<br \/>\n\u2013 la galeria de pe calea 1 (\u00een lungime total\u0103 de 1825 m) au fost excava\u021bi 1.144 m.<\/p>\n<p>Pentru cre\u0219terea ritmului lucr\u0103rilor de excava\u021bie la Tunelul 2, constructorii vor deschide un nou acces \u00een galeria de pe sensul Sibiu-N\u0103dlac (calea 1) \u0219i vor lucra din 8 puncte.<\/p>\n<p>A fost finalizat\u0103 platforma pe care se va monta fabrica de grinzi care vor fi montate pe poduri \u0219i viaducte.<\/p>\n<p>Contractul \u00een valoare de 1,82 miliarde lei (f\u0103r\u0103 TVA) este finan\u021bat prin PNRR \u0219i trebuie finalizat anul acesta.<\/p>\n<p>\u00cen momentul \u00een care sec\u021biunea Margina-Holdea va fi deschis\u0103, se va putea circula ne\u00eentrerupt pe autostrad\u0103, de la Boi\u021ba la N\u0103dlac, pe o distan\u021b\u0103 de peste 360 km.<\/p>\n<iframe loading=\"lazy\" title=\"\u0218antier A1 Holdea - Margina, 20 martie 2026\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/1_k8ZU_ogEU?feature=oembed\" frameborder allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/renasterea.ro\/peste-300-de-muncitori-si-85-de-utilaje-pe-sectiunea-margina-holdea-de-pe-autostrada-a1\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/margina-holdea.jpghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/margina-holdea.jpg&#8221;] Asocierea de constructori rom\u00e2ni \u0219i bosniaci (UMB Spedition-EuroAsfalt) este mobilizat\u0103 \u00een \u0219antier cu 330 de muncitori \u0219i 85 de utilaje, pe sec\u021biunea Margina \u2013 Holdea a autostr\u0103zii Lugoj-Deva (A1). Pe cei 9,13 km ai \u0219antierului, stadiul fizic este de 56%, a informat s\u00e2mb\u0103t\u0103 Cristian Pistol, directorul general al Companiei Na\u0163ionale de Administrare [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,188],"class_list":["post-1843594","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-renasterea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1843594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1843594"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1843594\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1843594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1843594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1843594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}