{"id":1843340,"date":"2026-03-23T13:13:48","date_gmt":"2026-03-23T10:13:48","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1843340"},"modified":"2026-03-23T13:13:48","modified_gmt":"2026-03-23T10:13:48","slug":"alfred-simonis-avem-constructor-pentru-ridicarea-noului-stadion-dan-paltinisanu","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1843340","title":{"rendered":"Alfred Simonis: \u201eAvem constructor pentru ridicarea noului Stadion Dan P\u0103ltini\u0219anu\u201d"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/alfred-simonis.jpghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/alfred-simonis.jpg&#8221;]<\/p>\n<div class=\"entry-content\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"392\" src=\"https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/alfred-simonis.jpg\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Alfred Simonis: \u201eAvem constructor pentru ridicarea noului Stadion Dan P\u0103ltini\u0219anu\u201d\" title=\"Alfred Simonis: \u201eAvem constructor pentru ridicarea noului Stadion Dan P\u0103ltini\u0219anu\u201d 1\"><\/p>\n<h4><strong>Alfred Simonis: \u201eAvem constructor pentru ridicarea noului Stadion Dan P\u0103ltini\u0219anu\u201d.<\/strong><\/h4>\n<p>Pre\u0219edintele Consiliului Jude\u021bean Timi\u0219, Alfred Simonis, a anun\u021bat ast\u0103zi c\u0103 o adres\u0103 primit\u0103 de la Compania Na\u021bional\u0103 de Investi\u021bii certific\u0103 faptul c\u0103 noul Stadion Dan P\u0103ltini\u0219anu are un constructor desemnat, o dat\u0103 cu expirarea perioadei de depunere a contesta\u021biilor.<\/p>\n<p>\u201eDeci, din acest moment, nimeni nu mai poate opri construirea noului stadion al Timi\u0219oarei. Miercuri avem \u0219edin\u021b\u0103 de Consiliu Jude\u021bean, sper ca p\u00e2n\u0103 atunci s\u0103 finaliz\u0103m documentele \u0219i s\u0103 adopt\u0103m hot\u0103r\u00e2rea de cofinan\u021bare cu 25 la sut\u0103 a acestei investi\u021bii\u201d, a afirmat Alfred Simonis. Suma cu care Consiliul Jude\u021bean Timi\u0219 va contribui la construirea noului stadion, \u00een urm\u0103toarele 30 de luni, este de 126 milioane de lei, aproximativ 25 de milioane de euro.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-291699 aligncenter\" src=\"https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/stadion-1.jpg\" alt=\"stadion 1\" width=\"585\" height=\"320\" title=\"Alfred Simonis: \u201eAvem constructor pentru ridicarea noului Stadion Dan P\u0103ltini\u0219anu\u201d 2\"><\/p>\n<p>\u0218i din ace\u0219ti bani vor \u00eencepe lucr\u0103rile, dac\u0103 la nivel de Executiv se va decide ca finan\u021barea la nivel na\u021bional a investi\u021biilor s\u0103 fie realizat\u0103 doar \u00eencep\u00e2nd cu 2027.<\/p>\n<p>\u201e126 milioane de lei, at\u00e2t este specificat \u00een documentul primit, ast\u0103zi, de la Compania Na\u021bional\u0103 de Investi\u021bii, reprezent\u00e2nd partea noastr\u0103 din lucr\u0103rile de construc\u021bii-montaj. Bugetul de stat a fost aprobat, exist\u0103 linie de credit la CNI, deci, o dat\u0103 cu adoptarea hot\u0103r\u00e2rii de consiliu jude\u021bean de miercuri, se poate semna contractul de execu\u021bie \u0219i \u00een regim de urgen\u021b\u0103 s\u0103 \u00eenceap\u0103 faza de proiectare \u0219i, dac\u0103 se poate, execu\u021bie chiar \u00een paralel cu proiectarea. Ceea ce a fost greu a trecut, vom \u00eencepe construc\u021bia Stadionului Dan P\u0103ltini\u0219anu \u0219i \u00eel vom duce la bun sf\u00e2r\u0219it\u201d, a declarat liderul CJT.<\/p>\n<p>Firesc, noul stadion al Timi\u0219oarei nu va fi folosit doar pentru evenimente sportive.<\/p>\n<p>\u201eAtunci c\u00e2nd va fi finalizat \u0219i dat \u00een folosin\u021b\u0103, putem pune Timi\u0219ul \u0219i Timi\u0219oara pe marile scene interna\u021bionale. Av\u00e2ndu-l, putem aduce \u00a0aici arti\u0219ti de top\u201d, a mai afirmat Alfred Simonis.<\/p>\n<h2><strong>CITE\u0218TE \u0218I: <a href=\"https:\/\/renasterea.ro\/aproape-1-000-de-liceeni-din-timis-afectati-de-boicotul-simularii-bacalaureatului\/\">Aproape 1.000 de liceeni din Timi\u0219 afecta\u021bi de boicotul simul\u0103rii bacalaureatului<\/a><\/strong><\/h2>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/renasterea.ro\/alfred-simonis-avem-constructor-pentru-ridicarea-noului-stadion-dan-paltinisanu\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/alfred-simonis.jpghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/03\/alfred-simonis.jpg&#8221;] Alfred Simonis: \u201eAvem constructor pentru ridicarea noului Stadion Dan P\u0103ltini\u0219anu\u201d. Pre\u0219edintele Consiliului Jude\u021bean Timi\u0219, Alfred Simonis, a anun\u021bat ast\u0103zi c\u0103 o adres\u0103 primit\u0103 de la Compania Na\u021bional\u0103 de Investi\u021bii certific\u0103 faptul c\u0103 noul Stadion Dan P\u0103ltini\u0219anu are un constructor desemnat, o dat\u0103 cu expirarea perioadei de depunere a contesta\u021biilor. \u201eDeci, din acest [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,188],"class_list":["post-1843340","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-renasterea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1843340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1843340"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1843340\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1843340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1843340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1843340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}