{"id":1840093,"date":"2026-03-22T08:33:53","date_gmt":"2026-03-22T05:33:53","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1840093"},"modified":"2026-03-22T08:33:53","modified_gmt":"2026-03-22T05:33:53","slug":"sectiunea-de-autostrada-margina-holdea-e-gata-pe-jumatate-inca-nu-se-stie-precis-cand-se-va-circula-intins-pe-circa-360-de-kilometri-de-autostrada","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1840093","title":{"rendered":"Sec\u021biunea de autostrad\u0103 Margina-Holdea e gata pe jum\u0103tate! \u00cenc\u0103 nu se \u0219tie precis c\u00e2nd se va circula ,,\u00eentins\u201d pe circa 360 de kilometri de autostrad\u0103"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/03\/Autostrada-A1-tuneluri-Margina-Holdea.jpg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_64 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_64\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p>Sec\u0163iunea Margina \u2013 Holdea, \u00een lungime de 9,13 kilometri, de pe Autostrada Lugoj \u2013 Deva (A1), a ajuns la un stadiu fizic al lucr\u0103rilor de 56%, a anun\u0163at, s\u00e2mb\u0103t\u0103, pe pagina sa socializare, directorul general al Companiei Na\u0163ionale de Administrare a Infrastructurii Rutiere (CNAIR), Cristian Pistol, transmite Agerpres.<\/p>\n<p>Potrivit oficialului, la ora actual\u0103, asocierea de constructori rom\u00e2ni \u015fi bosniaci (UMB Spedition \u2013 EuroAsfalt) este mobilizat\u0103 \u00een \u015fantier cu 330 de muncitori \u015fi 85 de utilaje.<\/p>\n<p>\u015eeful CNAIR a precizat c\u0103, \u00een cazul Tunelului 1, s-au finalizat excava\u0163iile \u015fi lucr\u0103rile de torcretare \u00een ambele galerii (cea de pe calea 2 are o lungime de 415 metri \u015fi cea de pe calea 1 are o lungime de 367,5 metri).<\/p>\n<p>De asemenea, funda\u0163iile boltei \u00eentoarse au fost finalizate la ambele galerii, iar \u00een galeria de pe calea 2 a fost, deja, montat\u0103 hidroizola\u0163ia pe o lungime de 340 de metri, \u00een timp ce \u00een galeria de pe calea 1 a fost montat\u0103 hidroizola\u0163ia pe 324 de metri.<\/p>\n<p>\u201e\u00cen momentul de fa\u0163\u0103 se poate traversa cu ma\u015fina galeria de pe sensul N\u0103dlac-Sibiu (calea 2)\u201d, a men\u0163ionat Pistol.<\/p>\n<p>\u00cen acela\u015fi timp, pentru Tunelul 2, la galeria de pe calea 2 (\u00een lungime de 1.985 de metri) s-au excavat 930 de metri, iar la galeria de pe calea 1 (\u00een lungime total\u0103 de 1.825 de metri) au fost excava\u0163i 1.144 de metri.<\/p>\n<p>\u201ePentru cre\u015fterea ritmului lucr\u0103rilor de excava\u0163ie la Tunelul 2, constructorii vor deschide un nou acces \u00een galeria de pe sensul Sibiu \u2013 N\u0103dlac (calea 1) \u015fi vor lucra din opt puncte. A fost finalizat\u0103 platforma pe care se va monta fabrica de grinzi care vor fi montate pe poduri \u015fi viaducte\u201d, a subliniat directorul general al CNAIR.<\/p>\n<p>Acesta a ad\u0103ugat c\u0103 valoarea contractului pentru aceste lucr\u0103ri, ce trebuie finalizate anul acesta, se ridic\u0103 la 1,82 miliarde lei (f\u0103r\u0103 TVA), iar banii provin din Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR).<\/p>\n<p>\u00cen momentul \u00een care sec\u0163iunea Margina \u2013 Holdea va fi deschis\u0103 se va putea circula ne\u00eentrerupt pe autostrad\u0103, de la Boi\u0163a la N\u0103dlac, pe o distan\u0163\u0103 de peste 360 km, a punctat Pistol.<\/p>\n<p>Sursa: <a href=\"https:\/\/www.g4media.ro\/\">https:\/\/www.g4media.ro\/<\/a><\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulazi.ro\/sectiunea-de-autostrada-margina-holdea-e-gata-pe-jumatate-inca-nu-se-stie-precis-cand-se-va-circula-intins-pe-circa-360-de-kilometri-de-autostrada\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/03\/Autostrada-A1-tuneluri-Margina-Holdea.jpg&#8221;] Sec\u0163iunea Margina \u2013 Holdea, \u00een lungime de 9,13 kilometri, de pe Autostrada Lugoj \u2013 Deva (A1), a ajuns la un stadiu fizic al lucr\u0103rilor de 56%, a anun\u0163at, s\u00e2mb\u0103t\u0103, pe pagina sa socializare, directorul general al Companiei Na\u0163ionale de Administrare a Infrastructurii Rutiere (CNAIR), Cristian Pistol, transmite Agerpres. Potrivit oficialului, la ora [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[185,226],"class_list":["post-1840093","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulazi-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1840093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1840093"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1840093\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1840093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1840093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1840093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}