{"id":1815510,"date":"2026-03-08T12:46:00","date_gmt":"2026-03-08T09:46:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1815510"},"modified":"2026-03-08T12:46:00","modified_gmt":"2026-03-08T09:46:00","slug":"horezu-are-o-primarie-noua-intr-o-cladire-cu-istorie-nicolae-sardarescu-si-echipa-administratiei-lucreaza-de-acum-in-sediul-complet-reabilitat","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1815510","title":{"rendered":"Horezu are o prim\u0103rie nou\u0103 \u00eentr-o cl\u0103dire cu istorie: Nicolae S\u0103rd\u0103rescu \u0219i echipa administra\u021biei lucreaz\u0103 de acum \u00een sediul complet reabilitat"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-1.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1766\" height=\"1110\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-1.jpg\" class=\"img-responsive wp-post-image\" alt=\"Horezu are o prim\u0103rie nou\u0103 \u00eentr-o cl\u0103dire cu istorie: Nicolae S\u0103rd\u0103rescu \u0219i echipa administra\u021biei lucreaz\u0103 de acum \u00een sediul complet reabilitat\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/03\/08\/horezu-are-o-primarie-noua-intr-o-cladire-cu-istorie-nicolae-sardarescu-si-echipa-administratiei-lucreaza-de-acum-in-sediul-complet-reabilitat\/\" rel=\"bookmark\"><time class=\"entry-date published\" datetime=\"2026-03-08T14:46:00+02:00\">8 martie 2026<\/time><time class=\"updated\" datetime=\"2026-03-08T14:46:40+02:00\">8 martie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/actualitate\/\" rel=\"category tag\">Actual<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/horezu\/\" rel=\"category tag\">Horezu<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Horezu, administra\u021bia local\u0103 lucreaz\u0103 de acum \u00eentr-o cl\u0103dire complet renovat\u0103, iar cei care au nevoie s\u0103 ajung\u0103 la primar sau la serviciile prim\u0103riei trebuie s\u0103 \u0219tie c\u0103 institu\u021bia func\u021bioneaz\u0103 \u00een noul sediu, \u00eentr-o construc\u021bie cu istorie, readus\u0103 la o form\u0103 modern\u0103 dup\u0103 lucr\u0103ri ample de consolidare \u0219i reamenajare. Primarul Nicolae S\u0103rd\u0103rescu \u0219i-a mutat biroul la etajul cl\u0103dirii, iar de luni cei care \u00eel caut\u0103 \u00eel pot g\u0103si acolo, \u00eentr-un spa\u021biu organizat pentru activitatea administra\u021biei locale \u0219i pentru rela\u021bia cu cet\u0103\u021benii.<\/p>\n<p>Primarul spune c\u0103 programul s\u0103u r\u0103m\u00e2ne acela\u0219i, pentru c\u0103 munca \u00een administra\u021bie nu se opre\u0219te la o anumit\u0103 or\u0103 \u0219i nu exist\u0103 zile \u00een care responsabilit\u0103\u021bile s\u0103 poat\u0103 fi puse \u00een a\u0219teptare.<\/p>\n<p>.Pu\u021bini \u0219tiu c\u0103, de c\u00e2nd a preluat conducerea ora\u0219ului, Nicolae S\u0103rd\u0103rescu nu \u0219i-a luat nicio zi de concediu, deoarece fiecare zi aduce decizii care nu pot fi am\u00e2nate, motiv pentru care prefer\u0103 s\u0103 fie permanent \u00een institu\u021bie, aproape de echipa cu care urm\u0103re\u0219te planurile \u0219i proiectele ora\u0219ului:\u00a0 \u201d\u201e <strong><em>Eu sunt \u00een fiecare zi la prim\u0103rie, indiferent de or\u0103. Nu mi-am luat de c\u00e2nd sunt primar nicio zi de concediu, pentru c\u0103 \u00een administra\u021bie fiecare zi \u00eenseamn\u0103 decizii \u0219i responsabilit\u0103\u021bi. Sunt lucruri care trebuie urm\u0103rite atent, proiecte care trebuie verificate \u0219i oameni care vin cu problemele lor. Avem o echip\u0103 cu care lucr\u0103m foarte bine \u0219i urm\u0103rim strategia de dezvoltare a ora\u0219ului cu mult\u0103 seriozitate, iar toate proiectele \u0219i planurile trebuie urm\u0103rite permanent<\/em><\/strong>\u201d, explic\u0103 Nicolae S\u0103rd\u0103rescu.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-55924\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-noua-primarie-300x187.jpg\" alt width=\"300\" height=\"187\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-55925\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-02-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Noua prim\u0103rie func\u021bioneaz\u0103 \u00eentr-o cl\u0103dire veche, dar cu o poveste aparte. Construc\u021bia a fost ridicat\u0103 cu mult timp \u00een urm\u0103 pentru a g\u0103zdui instan\u021ba \u0219i administra\u021bia local\u0103, iar mai t\u00e2rziu, \u00een anii \u201960, a fost transformat\u0103 \u00een spital. Dup\u0103 1989, imobilul a r\u0103mas nefolosit o perioad\u0103 lung\u0103, iar \u00een cele din urm\u0103 a revenit \u00een proprietatea administra\u021biei locale prin dona\u021bie.<\/p>\n<p>\u00cen ultimii ani au fost realizate lucr\u0103ri ample de consolidare, reabilitare \u0219i modernizare, astfel \u00eenc\u00e2t cl\u0103direa a fost adaptat\u0103 pentru nevoile actuale ale institu\u021biei. Spa\u021biul are aproximativ 1.400 de metri p\u0103tra\u021bi \u0219i cuprinde birouri pentru personal, s\u0103li de lucru, spa\u021bii \u0219i zone adaptate pentru tehnologia folosit\u0103 \u00een administra\u021bia modern\u0103. \u00a0Investi\u021bia total\u0103 dep\u0103\u0219e\u0219te 5,5 milioane de lei, bani proveni\u021bi at\u00e2t din bugetul local, c\u00e2t \u0219i din fonduri europene ob\u021binute prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103.<\/p>\n<p>La etajul cl\u0103dirii se afl\u0103 biroul primarului, compartimentul de contabilitate \u0219i serviciul de achizi\u021bii, iar la parter sunt organizate serviciile la care cet\u0103\u021benii au acces direct atunci c\u00e2nd vin la prim\u0103rie pentru diferite documente sau solicit\u0103ri. \u00cen paralel, o parte din cl\u0103direa veche a fostei prim\u0103rii va fi demolat\u0103, iar terenul eliberat va fi amenajat cu locuri de parcare, alei \u0219i spa\u021bii verzi.<\/p>\n<p><strong><u>Casa de Cultur\u0103 va fi ref\u0103cut\u0103 \u00een acela\u0219i stil cu noua prim\u0103rie<\/u><\/strong><\/p>\n<p>\u00cen apropierea prim\u0103riei se afl\u0103 \u0219i <strong>Casa de Cultur\u0103<\/strong>, o alt\u0103 cl\u0103dire important\u0103 pentru ora\u0219, care urmeaz\u0103 s\u0103 fie reabilitat\u0103 \u00een totalitate. Documenta\u021bia pentru lucr\u0103ri este \u00een curs de preg\u0103tire, iar finan\u021barea este asigurat\u0103 din fonduri europene. Primarul ne spune c\u0103 dup\u0103 finalizarea proiectului cl\u0103direa va avea o imagine arhitectural\u0103 apropiat\u0103 de cea a noii prim\u0103rii: \u201d \u201e <strong><em>L\u00e2ng\u0103 prim\u0103rie se afl\u0103 Casa de Cultur\u0103, iar pentru aceast\u0103 cl\u0103dire preg\u0103tim documenta\u021bia necesar\u0103 pentru reabilitare. Exist\u0103 finan\u021bare european\u0103 \u0219i vrem s\u0103 o refacem complet, astfel \u00eenc\u00e2t s\u0103 arate \u00een acela\u0219i stil arhitectural cu noua prim\u0103rie. Este o cl\u0103dire important\u0103 pentru ora\u0219 \u0219i trebuie pus\u0103 \u00een valoare <\/em><\/strong>\u201d, ne spune Nicolae S\u0103rd\u0103rescu.<\/p>\n<p>\u00cen Casa de Cultur\u0103 func\u021bioneaz\u0103 \u00een prezent <strong>biblioteca ora\u0219ul<\/strong>ui, loc unde vin elevi \u0219i tineri. Spa\u021biul a fost dotat cu echipamente moderne printr-un proiect realizat \u00eempreun\u0103 cu Consiliul Jude\u021bean V\u00e2lcea. Biblioteca are calculatoare, laptopuri, tablete \u0219i imprimante 3D, iar recent fondul de carte a fost completat cu \u00eenc\u0103 1.160 de volume.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-55929\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-biblioteca-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p><strong><u>Arhiva ora\u0219ului Horezu, un exemplu de ordine \u0219i organizare<\/u><\/strong><\/p>\n<p>Tot aici se afl\u0103 \u0219i <strong>arhiva ora\u0219ului<\/strong>, un spa\u021biu organizat riguros, unde fiecare document este p\u0103strat \u00een ordine, dup\u0103 ani de munc\u0103 atent\u0103. \u0218i asta pentru c\u0103 prim\u0103ria are un angajat care se ocup\u0103 exclusiv de arhiv\u0103 de aproape nou\u0103 ani, iar rezultatul se vede \u00een modul \u00een care sunt p\u0103strate \u0219i clasificate documentele: \u201d \u201e <strong><em>Horezu are o arhiv\u0103 pus\u0103 exemplar la punct. De aproape nou\u0103 ani avem un angajat care se ocup\u0103 de arhivare, iar fiecare dosar \u0219i fiecare document au fost verificate \u0219i a\u0219ezate \u00een ordine. Este o munc\u0103 foarte important\u0103 pentru administra\u021bie<\/em><\/strong>\u201d, spune primarul.<\/p>\n<p>Arhiva urmeaz\u0103 s\u0103 fie mutat\u0103 la parterul unei cl\u0103diri aflate l\u00e2ng\u0103 prim\u0103rie, acolo unde func\u021bioneaz\u0103 \u0219i cre\u0219a la etaj, iar spa\u021biul eliberat din Casa de Cultur\u0103 va putea fi reorganizat dup\u0103 reabilitarea cl\u0103dirii.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-55928\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-arhiva-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Pe l\u00e2ng\u0103 aceste proiecte, administra\u021bia local\u0103 are \u00een lucru investi\u021bii importante pentru dezvoltarea ora\u0219ului. Primarul afirm\u0103 c\u0103 valoarea proiectelor aflate deja pe \u0219antiere dep\u0103\u0219e\u0219te 150 de milioane de euro, f\u0103r\u0103 a include proiectele aflate \u00eenc\u0103 \u00een etapa de preg\u0103tire a documenta\u021biilor: \u201d\u201e <strong><em>Avem proiecte \u00een lucru de peste 150 de milioane de euro \u0219i aici vorbesc doar despre cele care sunt deja pe \u0219antiere. Nu pun la socoteal\u0103 proiectele care sunt \u00eenc\u0103 \u00een faz\u0103 de documenta\u021bie. Sunt m\u00e2ndru de ceea ce am reu\u0219it s\u0103 facem la Horezu, pentru c\u0103 ani de zile am muncit pentru a aduce ora\u0219ul la nivelul acesta \u0219i pentru a atrage fonduri europene<\/em><\/strong>\u201d, afirm\u0103 Nicolae S\u0103rd\u0103rescu.<\/p>\n<p>Atrage aten\u021bia c\u0103 dezvoltarea ora\u0219ului implic\u0103 \u0219i eforturi financiare importante, deoarece proiectele realizate cu fonduri europene necesit\u0103 \u0219i <strong>cofinan\u021bare<\/strong> din partea administra\u021biei locale. \u00cen acela\u0219i timp, primarul spune c\u0103 ora\u0219ul se administreaz\u0103 ast\u0103zi exclusiv din veniturile proprii: \u201d\u201e <strong><em>La aceast\u0103 valoare a proiectelor este nevoie \u0219i de cofinan\u021b\u0103ri, iar asta ridic\u0103 unele semne de \u00eentrebare, pentru c\u0103 ora\u0219ul Horezu se administreaz\u0103 ast\u0103zi singur, din veniturile proprii. Guvernul nu ne d\u0103 bani pentru func\u021bionare \u0219i, mai mult, anual se re\u021bin peste 500 de mii de euro din TVA, bani care sunt direc\u021biona\u021bi c\u0103tre localit\u0103\u021bile care nu au venituri. Noi am muncit ani de zile pentru a aduce ora\u0219ul la acest nivel, am atras bani europeni \u0219i am f\u0103cut investi\u021bii, dar statul nu prive\u0219te lucrurile \u00een acela\u0219i mod. Nici de la bugetul care nu a fost finalizat p\u00e2n\u0103 acum nu am a\u0219tept\u0103ri spectaculoase<\/em><\/strong>\u201d, spune primarul.<\/p>\n<p>Despre proiectele aflate ast\u0103zi \u00een faz\u0103 de \u0219antier vom reveni \u00een materialele urm\u0103toare. Vom prezenta stadiul lucr\u0103rilor la magistrala de gaze R\u00e2mnicu V\u00e2lcea \u2013 Tetila \u2013 Horezu, evolu\u021bia proiectului pentru Centura Ocolitoare, \u00eenceperea construc\u021biei gr\u0103dini\u021bei cu program prelungit din zona Romanii de Sus, dar \u0219i sosirea urm\u0103toarelor autobuze electrice. De asemenea, vom reveni cu informa\u021bii despre finalizarea blocurilor \u00a0nZEB\u0219i a blocului de locuin\u021be pentru medici, despre proiectele de restaurare a bisericilor, precum \u0219i despre lucr\u0103rile de ap\u0103 \u0219i canalizare prin master planul jude\u021bului, asfalt\u0103rile finan\u021bate prin Programul Na\u021bional de Investi\u021bii \u201eAnghel Saligny\u201d \u0219i proiectul de amenajare a toren\u021bilor.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Horezu, administra\u021bia local\u0103 lucreaz\u0103 de acum \u00eentr-o cl\u0103dire complet renovat\u0103, iar cei care au nevoie s\u0103 ajung\u0103 la primar sau la serviciile prim\u0103riei trebuie s\u0103 \u0219tie c\u0103 institu\u021bia func\u021bioneaz\u0103 \u00een noul sediu, \u00eentr-o construc\u021bie cu istorie, readus\u0103 la o form\u0103 modern\u0103 dup\u0103 lucr\u0103ri ample de consolidare \u0219i reamenajare. Primarul Nicolae S\u0103rd\u0103rescu \u0219i-a mutat biroul la etajul cl\u0103dirii, iar de luni cei care \u00eel caut\u0103 \u00eel pot g\u0103si acolo, \u00eentr-un spa\u021biu organizat pentru activitatea administra\u021biei locale \u0219i pentru rela\u021bia cu cet\u0103\u021benii.<\/p>\n<p>Primarul spune c\u0103 programul s\u0103u r\u0103m\u00e2ne acela\u0219i, pentru c\u0103 munca \u00een administra\u021bie nu se opre\u0219te la o anumit\u0103 or\u0103 \u0219i nu exist\u0103 zile \u00een care responsabilit\u0103\u021bile s\u0103 poat\u0103 fi puse \u00een a\u0219teptare.<\/p>\n<p>.Pu\u021bini \u0219tiu c\u0103, de c\u00e2nd a preluat conducerea ora\u0219ului, Nicolae S\u0103rd\u0103rescu nu \u0219i-a luat nicio zi de concediu, deoarece fiecare zi aduce decizii care nu pot fi am\u00e2nate, motiv pentru care prefer\u0103 s\u0103 fie permanent \u00een institu\u021bie, aproape de echipa cu care urm\u0103re\u0219te planurile \u0219i proiectele ora\u0219ului:\u00a0 \u201d\u201e <strong><em>Eu sunt \u00een fiecare zi la prim\u0103rie, indiferent de or\u0103. Nu mi-am luat de c\u00e2nd sunt primar nicio zi de concediu, pentru c\u0103 \u00een administra\u021bie fiecare zi \u00eenseamn\u0103 decizii \u0219i responsabilit\u0103\u021bi. Sunt lucruri care trebuie urm\u0103rite atent, proiecte care trebuie verificate \u0219i oameni care vin cu problemele lor. Avem o echip\u0103 cu care lucr\u0103m foarte bine \u0219i urm\u0103rim strategia de dezvoltare a ora\u0219ului cu mult\u0103 seriozitate, iar toate proiectele \u0219i planurile trebuie urm\u0103rite permanent<\/em><\/strong>\u201d, explic\u0103 Nicolae S\u0103rd\u0103rescu.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-55924\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-noua-primarie-300x187.jpg\" alt width=\"300\" height=\"187\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-55925\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-02-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Noua prim\u0103rie func\u021bioneaz\u0103 \u00eentr-o cl\u0103dire veche, dar cu o poveste aparte. Construc\u021bia a fost ridicat\u0103 cu mult timp \u00een urm\u0103 pentru a g\u0103zdui instan\u021ba \u0219i administra\u021bia local\u0103, iar mai t\u00e2rziu, \u00een anii \u201960, a fost transformat\u0103 \u00een spital. Dup\u0103 1989, imobilul a r\u0103mas nefolosit o perioad\u0103 lung\u0103, iar \u00een cele din urm\u0103 a revenit \u00een proprietatea administra\u021biei locale prin dona\u021bie.<\/p>\n<p>\u00cen ultimii ani au fost realizate lucr\u0103ri ample de consolidare, reabilitare \u0219i modernizare, astfel \u00eenc\u00e2t cl\u0103direa a fost adaptat\u0103 pentru nevoile actuale ale institu\u021biei. Spa\u021biul are aproximativ 1.400 de metri p\u0103tra\u021bi \u0219i cuprinde birouri pentru personal, s\u0103li de lucru, spa\u021bii \u0219i zone adaptate pentru tehnologia folosit\u0103 \u00een administra\u021bia modern\u0103. \u00a0Investi\u021bia total\u0103 dep\u0103\u0219e\u0219te 5,5 milioane de lei, bani proveni\u021bi at\u00e2t din bugetul local, c\u00e2t \u0219i din fonduri europene ob\u021binute prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103.<\/p>\n<p>La etajul cl\u0103dirii se afl\u0103 biroul primarului, compartimentul de contabilitate \u0219i serviciul de achizi\u021bii, iar la parter sunt organizate serviciile la care cet\u0103\u021benii au acces direct atunci c\u00e2nd vin la prim\u0103rie pentru diferite documente sau solicit\u0103ri. \u00cen paralel, o parte din cl\u0103direa veche a fostei prim\u0103rii va fi demolat\u0103, iar terenul eliberat va fi amenajat cu locuri de parcare, alei \u0219i spa\u021bii verzi.<\/p>\n<p><strong><u>Casa de Cultur\u0103 va fi ref\u0103cut\u0103 \u00een acela\u0219i stil cu noua prim\u0103rie<\/u><\/strong><\/p>\n<p>\u00cen apropierea prim\u0103riei se afl\u0103 \u0219i <strong>Casa de Cultur\u0103<\/strong>, o alt\u0103 cl\u0103dire important\u0103 pentru ora\u0219, care urmeaz\u0103 s\u0103 fie reabilitat\u0103 \u00een totalitate. Documenta\u021bia pentru lucr\u0103ri este \u00een curs de preg\u0103tire, iar finan\u021barea este asigurat\u0103 din fonduri europene. Primarul ne spune c\u0103 dup\u0103 finalizarea proiectului cl\u0103direa va avea o imagine arhitectural\u0103 apropiat\u0103 de cea a noii prim\u0103rii: \u201d \u201e <strong><em>L\u00e2ng\u0103 prim\u0103rie se afl\u0103 Casa de Cultur\u0103, iar pentru aceast\u0103 cl\u0103dire preg\u0103tim documenta\u021bia necesar\u0103 pentru reabilitare. Exist\u0103 finan\u021bare european\u0103 \u0219i vrem s\u0103 o refacem complet, astfel \u00eenc\u00e2t s\u0103 arate \u00een acela\u0219i stil arhitectural cu noua prim\u0103rie. Este o cl\u0103dire important\u0103 pentru ora\u0219 \u0219i trebuie pus\u0103 \u00een valoare <\/em><\/strong>\u201d, ne spune Nicolae S\u0103rd\u0103rescu.<\/p>\n<p>\u00cen Casa de Cultur\u0103 func\u021bioneaz\u0103 \u00een prezent <strong>biblioteca ora\u0219ul<\/strong>ui, loc unde vin elevi \u0219i tineri. Spa\u021biul a fost dotat cu echipamente moderne printr-un proiect realizat \u00eempreun\u0103 cu Consiliul Jude\u021bean V\u00e2lcea. Biblioteca are calculatoare, laptopuri, tablete \u0219i imprimante 3D, iar recent fondul de carte a fost completat cu \u00eenc\u0103 1.160 de volume.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-55929\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-biblioteca-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p><strong><u>Arhiva ora\u0219ului Horezu, un exemplu de ordine \u0219i organizare<\/u><\/strong><\/p>\n<p>Tot aici se afl\u0103 \u0219i <strong>arhiva ora\u0219ului<\/strong>, un spa\u021biu organizat riguros, unde fiecare document este p\u0103strat \u00een ordine, dup\u0103 ani de munc\u0103 atent\u0103. \u0218i asta pentru c\u0103 prim\u0103ria are un angajat care se ocup\u0103 exclusiv de arhiv\u0103 de aproape nou\u0103 ani, iar rezultatul se vede \u00een modul \u00een care sunt p\u0103strate \u0219i clasificate documentele: \u201d \u201e <strong><em>Horezu are o arhiv\u0103 pus\u0103 exemplar la punct. De aproape nou\u0103 ani avem un angajat care se ocup\u0103 de arhivare, iar fiecare dosar \u0219i fiecare document au fost verificate \u0219i a\u0219ezate \u00een ordine. Este o munc\u0103 foarte important\u0103 pentru administra\u021bie<\/em><\/strong>\u201d, spune primarul.<\/p>\n<p>Arhiva urmeaz\u0103 s\u0103 fie mutat\u0103 la parterul unei cl\u0103diri aflate l\u00e2ng\u0103 prim\u0103rie, acolo unde func\u021bioneaz\u0103 \u0219i cre\u0219a la etaj, iar spa\u021biul eliberat din Casa de Cultur\u0103 va putea fi reorganizat dup\u0103 reabilitarea cl\u0103dirii.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-55928\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-arhiva-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Pe l\u00e2ng\u0103 aceste proiecte, administra\u021bia local\u0103 are \u00een lucru investi\u021bii importante pentru dezvoltarea ora\u0219ului. Primarul afirm\u0103 c\u0103 valoarea proiectelor aflate deja pe \u0219antiere dep\u0103\u0219e\u0219te 150 de milioane de euro, f\u0103r\u0103 a include proiectele aflate \u00eenc\u0103 \u00een etapa de preg\u0103tire a documenta\u021biilor: \u201d\u201e <strong><em>Avem proiecte \u00een lucru de peste 150 de milioane de euro \u0219i aici vorbesc doar despre cele care sunt deja pe \u0219antiere. Nu pun la socoteal\u0103 proiectele care sunt \u00eenc\u0103 \u00een faz\u0103 de documenta\u021bie. Sunt m\u00e2ndru de ceea ce am reu\u0219it s\u0103 facem la Horezu, pentru c\u0103 ani de zile am muncit pentru a aduce ora\u0219ul la nivelul acesta \u0219i pentru a atrage fonduri europene<\/em><\/strong>\u201d, afirm\u0103 Nicolae S\u0103rd\u0103rescu.<\/p>\n<p>Atrage aten\u021bia c\u0103 dezvoltarea ora\u0219ului implic\u0103 \u0219i eforturi financiare importante, deoarece proiectele realizate cu fonduri europene necesit\u0103 \u0219i <strong>cofinan\u021bare<\/strong> din partea administra\u021biei locale. \u00cen acela\u0219i timp, primarul spune c\u0103 ora\u0219ul se administreaz\u0103 ast\u0103zi exclusiv din veniturile proprii: \u201d\u201e <strong><em>La aceast\u0103 valoare a proiectelor este nevoie \u0219i de cofinan\u021b\u0103ri, iar asta ridic\u0103 unele semne de \u00eentrebare, pentru c\u0103 ora\u0219ul Horezu se administreaz\u0103 ast\u0103zi singur, din veniturile proprii. Guvernul nu ne d\u0103 bani pentru func\u021bionare \u0219i, mai mult, anual se re\u021bin peste 500 de mii de euro din TVA, bani care sunt direc\u021biona\u021bi c\u0103tre localit\u0103\u021bile care nu au venituri. Noi am muncit ani de zile pentru a aduce ora\u0219ul la acest nivel, am atras bani europeni \u0219i am f\u0103cut investi\u021bii, dar statul nu prive\u0219te lucrurile \u00een acela\u0219i mod. Nici de la bugetul care nu a fost finalizat p\u00e2n\u0103 acum nu am a\u0219tept\u0103ri spectaculoase<\/em><\/strong>\u201d, spune primarul.<\/p>\n<p>Despre proiectele aflate ast\u0103zi \u00een faz\u0103 de \u0219antier vom reveni \u00een materialele urm\u0103toare. Vom prezenta stadiul lucr\u0103rilor la magistrala de gaze R\u00e2mnicu V\u00e2lcea \u2013 Tetila \u2013 Horezu, evolu\u021bia proiectului pentru Centura Ocolitoare, \u00eenceperea construc\u021biei gr\u0103dini\u021bei cu program prelungit din zona Romanii de Sus, dar \u0219i sosirea urm\u0103toarelor autobuze electrice. De asemenea, vom reveni cu informa\u021bii despre finalizarea blocurilor \u00a0nZEB\u0219i a blocului de locuin\u021be pentru medici, despre proiectele de restaurare a bisericilor, precum \u0219i despre lucr\u0103rile de ap\u0103 \u0219i canalizare prin master planul jude\u021bului, asfalt\u0103rile finan\u021bate prin Programul Na\u021bional de Investi\u021bii \u201eAnghel Saligny\u201d \u0219i proiectul de amenajare a toren\u021bilor.<\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Horezu, administra\u021bia local\u0103 lucreaz\u0103 de acum \u00eentr-o cl\u0103dire complet renovat\u0103, iar cei care au nevoie s\u0103 ajung\u0103 la primar sau la serviciile prim\u0103riei trebuie s\u0103 \u0219tie c\u0103 institu\u021bia func\u021bioneaz\u0103 \u00een noul sediu, \u00eentr-o construc\u021bie cu istorie, readus\u0103 la o form\u0103 modern\u0103 dup\u0103 lucr\u0103ri ample de consolidare \u0219i reamenajare. Primarul Nicolae S\u0103rd\u0103rescu \u0219i-a mutat biroul la etajul cl\u0103dirii, iar de luni cei care \u00eel caut\u0103 \u00eel pot g\u0103si acolo, \u00eentr-un spa\u021biu organizat pentru activitatea administra\u021biei locale \u0219i pentru rela\u021bia cu cet\u0103\u021benii.<\/p>\n<p>Primarul spune c\u0103 programul s\u0103u r\u0103m\u00e2ne acela\u0219i, pentru c\u0103 munca \u00een administra\u021bie nu se opre\u0219te la o anumit\u0103 or\u0103 \u0219i nu exist\u0103 zile \u00een care responsabilit\u0103\u021bile s\u0103 poat\u0103 fi puse \u00een a\u0219teptare.<\/p>\n<p>.Pu\u021bini \u0219tiu c\u0103, de c\u00e2nd a preluat conducerea ora\u0219ului, Nicolae S\u0103rd\u0103rescu nu \u0219i-a luat nicio zi de concediu, deoarece fiecare zi aduce decizii care nu pot fi am\u00e2nate, motiv pentru care prefer\u0103 s\u0103 fie permanent \u00een institu\u021bie, aproape de echipa cu care urm\u0103re\u0219te planurile \u0219i proiectele ora\u0219ului:\u00a0 \u201d\u201e <strong><em>Eu sunt \u00een fiecare zi la prim\u0103rie, indiferent de or\u0103. Nu mi-am luat de c\u00e2nd sunt primar nicio zi de concediu, pentru c\u0103 \u00een administra\u021bie fiecare zi \u00eenseamn\u0103 decizii \u0219i responsabilit\u0103\u021bi. Sunt lucruri care trebuie urm\u0103rite atent, proiecte care trebuie verificate \u0219i oameni care vin cu problemele lor. Avem o echip\u0103 cu care lucr\u0103m foarte bine \u0219i urm\u0103rim strategia de dezvoltare a ora\u0219ului cu mult\u0103 seriozitate, iar toate proiectele \u0219i planurile trebuie urm\u0103rite permanent<\/em><\/strong>\u201d, explic\u0103 Nicolae S\u0103rd\u0103rescu.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-55924\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-noua-primarie-300x187.jpg\" alt width=\"300\" height=\"187\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-55925\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-02-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Noua prim\u0103rie func\u021bioneaz\u0103 \u00eentr-o cl\u0103dire veche, dar cu o poveste aparte. Construc\u021bia a fost ridicat\u0103 cu mult timp \u00een urm\u0103 pentru a g\u0103zdui instan\u021ba \u0219i administra\u021bia local\u0103, iar mai t\u00e2rziu, \u00een anii \u201960, a fost transformat\u0103 \u00een spital. Dup\u0103 1989, imobilul a r\u0103mas nefolosit o perioad\u0103 lung\u0103, iar \u00een cele din urm\u0103 a revenit \u00een proprietatea administra\u021biei locale prin dona\u021bie.<\/p>\n<p>\u00cen ultimii ani au fost realizate lucr\u0103ri ample de consolidare, reabilitare \u0219i modernizare, astfel \u00eenc\u00e2t cl\u0103direa a fost adaptat\u0103 pentru nevoile actuale ale institu\u021biei. Spa\u021biul are aproximativ 1.400 de metri p\u0103tra\u021bi \u0219i cuprinde birouri pentru personal, s\u0103li de lucru, spa\u021bii \u0219i zone adaptate pentru tehnologia folosit\u0103 \u00een administra\u021bia modern\u0103. \u00a0Investi\u021bia total\u0103 dep\u0103\u0219e\u0219te 5,5 milioane de lei, bani proveni\u021bi at\u00e2t din bugetul local, c\u00e2t \u0219i din fonduri europene ob\u021binute prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103.<\/p>\n<p>La etajul cl\u0103dirii se afl\u0103 biroul primarului, compartimentul de contabilitate \u0219i serviciul de achizi\u021bii, iar la parter sunt organizate serviciile la care cet\u0103\u021benii au acces direct atunci c\u00e2nd vin la prim\u0103rie pentru diferite documente sau solicit\u0103ri. \u00cen paralel, o parte din cl\u0103direa veche a fostei prim\u0103rii va fi demolat\u0103, iar terenul eliberat va fi amenajat cu locuri de parcare, alei \u0219i spa\u021bii verzi.<\/p>\n<p><strong><u>Casa de Cultur\u0103 va fi ref\u0103cut\u0103 \u00een acela\u0219i stil cu noua prim\u0103rie<\/u><\/strong><\/p>\n<p>\u00cen apropierea prim\u0103riei se afl\u0103 \u0219i <strong>Casa de Cultur\u0103<\/strong>, o alt\u0103 cl\u0103dire important\u0103 pentru ora\u0219, care urmeaz\u0103 s\u0103 fie reabilitat\u0103 \u00een totalitate. Documenta\u021bia pentru lucr\u0103ri este \u00een curs de preg\u0103tire, iar finan\u021barea este asigurat\u0103 din fonduri europene. Primarul ne spune c\u0103 dup\u0103 finalizarea proiectului cl\u0103direa va avea o imagine arhitectural\u0103 apropiat\u0103 de cea a noii prim\u0103rii: \u201d \u201e <strong><em>L\u00e2ng\u0103 prim\u0103rie se afl\u0103 Casa de Cultur\u0103, iar pentru aceast\u0103 cl\u0103dire preg\u0103tim documenta\u021bia necesar\u0103 pentru reabilitare. Exist\u0103 finan\u021bare european\u0103 \u0219i vrem s\u0103 o refacem complet, astfel \u00eenc\u00e2t s\u0103 arate \u00een acela\u0219i stil arhitectural cu noua prim\u0103rie. Este o cl\u0103dire important\u0103 pentru ora\u0219 \u0219i trebuie pus\u0103 \u00een valoare <\/em><\/strong>\u201d, ne spune Nicolae S\u0103rd\u0103rescu.<\/p>\n<p>\u00cen Casa de Cultur\u0103 func\u021bioneaz\u0103 \u00een prezent <strong>biblioteca ora\u0219ul<\/strong>ui, loc unde vin elevi \u0219i tineri. Spa\u021biul a fost dotat cu echipamente moderne printr-un proiect realizat \u00eempreun\u0103 cu Consiliul Jude\u021bean V\u00e2lcea. Biblioteca are calculatoare, laptopuri, tablete \u0219i imprimante 3D, iar recent fondul de carte a fost completat cu \u00eenc\u0103 1.160 de volume.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-55929\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-biblioteca-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p><strong><u>Arhiva ora\u0219ului Horezu, un exemplu de ordine \u0219i organizare<\/u><\/strong><\/p>\n<p>Tot aici se afl\u0103 \u0219i <strong>arhiva ora\u0219ului<\/strong>, un spa\u021biu organizat riguros, unde fiecare document este p\u0103strat \u00een ordine, dup\u0103 ani de munc\u0103 atent\u0103. \u0218i asta pentru c\u0103 prim\u0103ria are un angajat care se ocup\u0103 exclusiv de arhiv\u0103 de aproape nou\u0103 ani, iar rezultatul se vede \u00een modul \u00een care sunt p\u0103strate \u0219i clasificate documentele: \u201d \u201e <strong><em>Horezu are o arhiv\u0103 pus\u0103 exemplar la punct. De aproape nou\u0103 ani avem un angajat care se ocup\u0103 de arhivare, iar fiecare dosar \u0219i fiecare document au fost verificate \u0219i a\u0219ezate \u00een ordine. Este o munc\u0103 foarte important\u0103 pentru administra\u021bie<\/em><\/strong>\u201d, spune primarul.<\/p>\n<p>Arhiva urmeaz\u0103 s\u0103 fie mutat\u0103 la parterul unei cl\u0103diri aflate l\u00e2ng\u0103 prim\u0103rie, acolo unde func\u021bioneaz\u0103 \u0219i cre\u0219a la etaj, iar spa\u021biul eliberat din Casa de Cultur\u0103 va putea fi reorganizat dup\u0103 reabilitarea cl\u0103dirii.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-55928\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-arhiva-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Pe l\u00e2ng\u0103 aceste proiecte, administra\u021bia local\u0103 are \u00een lucru investi\u021bii importante pentru dezvoltarea ora\u0219ului. Primarul afirm\u0103 c\u0103 valoarea proiectelor aflate deja pe \u0219antiere dep\u0103\u0219e\u0219te 150 de milioane de euro, f\u0103r\u0103 a include proiectele aflate \u00eenc\u0103 \u00een etapa de preg\u0103tire a documenta\u021biilor: \u201d\u201e <strong><em>Avem proiecte \u00een lucru de peste 150 de milioane de euro \u0219i aici vorbesc doar despre cele care sunt deja pe \u0219antiere. Nu pun la socoteal\u0103 proiectele care sunt \u00eenc\u0103 \u00een faz\u0103 de documenta\u021bie. Sunt m\u00e2ndru de ceea ce am reu\u0219it s\u0103 facem la Horezu, pentru c\u0103 ani de zile am muncit pentru a aduce ora\u0219ul la nivelul acesta \u0219i pentru a atrage fonduri europene<\/em><\/strong>\u201d, afirm\u0103 Nicolae S\u0103rd\u0103rescu.<\/p>\n<p>Atrage aten\u021bia c\u0103 dezvoltarea ora\u0219ului implic\u0103 \u0219i eforturi financiare importante, deoarece proiectele realizate cu fonduri europene necesit\u0103 \u0219i <strong>cofinan\u021bare<\/strong> din partea administra\u021biei locale. \u00cen acela\u0219i timp, primarul spune c\u0103 ora\u0219ul se administreaz\u0103 ast\u0103zi exclusiv din veniturile proprii: \u201d\u201e <strong><em>La aceast\u0103 valoare a proiectelor este nevoie \u0219i de cofinan\u021b\u0103ri, iar asta ridic\u0103 unele semne de \u00eentrebare, pentru c\u0103 ora\u0219ul Horezu se administreaz\u0103 ast\u0103zi singur, din veniturile proprii. Guvernul nu ne d\u0103 bani pentru func\u021bionare \u0219i, mai mult, anual se re\u021bin peste 500 de mii de euro din TVA, bani care sunt direc\u021biona\u021bi c\u0103tre localit\u0103\u021bile care nu au venituri. Noi am muncit ani de zile pentru a aduce ora\u0219ul la acest nivel, am atras bani europeni \u0219i am f\u0103cut investi\u021bii, dar statul nu prive\u0219te lucrurile \u00een acela\u0219i mod. Nici de la bugetul care nu a fost finalizat p\u00e2n\u0103 acum nu am a\u0219tept\u0103ri spectaculoase<\/em><\/strong>\u201d, spune primarul.<\/p>\n<p>Despre proiectele aflate ast\u0103zi \u00een faz\u0103 de \u0219antier vom reveni \u00een materialele urm\u0103toare. Vom prezenta stadiul lucr\u0103rilor la magistrala de gaze R\u00e2mnicu V\u00e2lcea \u2013 Tetila \u2013 Horezu, evolu\u021bia proiectului pentru Centura Ocolitoare, \u00eenceperea construc\u021biei gr\u0103dini\u021bei cu program prelungit din zona Romanii de Sus, dar \u0219i sosirea urm\u0103toarelor autobuze electrice. De asemenea, vom reveni cu informa\u021bii despre finalizarea blocurilor \u00a0nZEB\u0219i a blocului de locuin\u021be pentru medici, despre proiectele de restaurare a bisericilor, precum \u0219i despre lucr\u0103rile de ap\u0103 \u0219i canalizare prin master planul jude\u021bului, asfalt\u0103rile finan\u021bate prin Programul Na\u021bional de Investi\u021bii \u201eAnghel Saligny\u201d \u0219i proiectul de amenajare a toren\u021bilor.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/03\/08\/horezu-are-o-primarie-noua-intr-o-cladire-cu-istorie-nicolae-sardarescu-si-echipa-administratiei-lucreaza-de-acum-in-sediul-complet-reabilitat\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/03\/horezu-01-1.jpg&#8221;] 8 martie 20268 martie 2026Claudia SchiopuActualAdministra\u0163ieHorezu La Horezu, administra\u021bia local\u0103 lucreaz\u0103 de acum \u00eentr-o cl\u0103dire complet renovat\u0103, iar cei care au nevoie s\u0103 ajung\u0103 la primar sau la serviciile prim\u0103riei trebuie s\u0103 \u0219tie c\u0103 institu\u021bia func\u021bioneaz\u0103 \u00een noul sediu, \u00eentr-o construc\u021bie cu istorie, readus\u0103 la o form\u0103 modern\u0103 dup\u0103 lucr\u0103ri ample de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-1815510","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1815510","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1815510"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1815510\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1815510"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1815510"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1815510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}