{"id":1804004,"date":"2026-03-03T09:47:17","date_gmt":"2026-03-03T06:47:17","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1804004"},"modified":"2026-03-03T09:47:17","modified_gmt":"2026-03-03T06:47:17","slug":"alti-13-kilometri-din-reteaua-de-termoficare-a-timisoarei-modernizati","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1804004","title":{"rendered":"Al\u0163i 13 kilometri din re\u021beaua de termoficare a Timi\u015foarei, moderniza\u0163i"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpghttps:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg&#8221;]<\/p>\n<div class=\"post-entry\">\n<div class=\"pf-content\">\n<div id=\"attachment_51555\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-51555\" loading=\"lazy\" title=\"Reabilitare retea termoficare Timisoara (2) Foto PMT\" alt width=\"900\" height=\"600\" class=\"wp-image-51555 size-full lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-51555\" loading=\"lazy\" class=\"wp-image-51555 size-full\" title=\"Reabilitare retea termoficare Timisoara (2) Foto PMT\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg\" alt width=\"900\" height=\"600\"><\/a><\/p>\n<p id=\"caption-attachment-51555\" class=\"wp-caption-text\">Sur\u0103s foto: Prim\u0103ria Timi\u015foara<\/p>\n<\/div>\n<p><strong>Prim\u0103ria Municipiului Timi\u0219oara anun\u0163\u0103 c\u0103 a atribuit contractul pentru modernizarea a aproximativ 13 km din re\u021beaua primar\u0103 de termoficare, pe tronsoane unde se \u00eenregistreaz\u0103 \u00een prezent cele mai multe avarii \u0219i cele mai mari pierderi de energie.<\/strong><\/p>\n<p>\u00a0<\/p>\n<p>Investi\u021bia consolideaz\u0103 eforturile pentru modernizarea re\u021belei \u0219i vine \u00een completarea proiectului prin care municipalitatea a \u00eenlocuit aproape 30 de kilometri de conducte \u0219i a modernizat 25 de puncte termice \u00een ultimii ani. Prin noul contract, magistralele degradate vor fi \u00eenlocuite integral, iar tronsoane din conductele, aflate \u00eenc\u0103 la suprafa\u021b\u0103, vor fi introduse \u00een subteran.<\/p>\n<p><em>\u201eE un proiect crucial pentru reducerea pierderilor din re\u021beaua de distribu\u021bie a c\u0103ldurii \u0219i a apei calde. E, \u00een acela\u0219i timp, un proiect care va cre\u0219te calitatea spa\u021biului public: multe din conductele uria\u0219e, ruginite, care pleac\u0103 de la CET Sud \u0219i care acum sunt la suprafa\u021b\u0103 vor fi \u00eenlocuite \u0219i mutate \u00een subteran. Vom traversa cu \u0219antierul 9 cartiere ale Timi\u0219oarei \u0219i sunt \u00eencrez\u0103tor c\u0103 la finalul proiectului calitatea serviciilor pentru timi\u0219oreni va fi mai bun\u0103<\/em>\u201d, spune primarul <strong>Dominic Fritz<\/strong>.<\/p>\n<p>Contractul pentru proiectarea \u0219i execu\u021bia lucr\u0103rilor de reabilitare a magistralei principale care pleac\u0103 de la CET Sud \u0219i asigur\u0103 distribu\u021bia agentului termic \u00een \u00eentreg ora\u0219ul a fost atribuit Asocierii Construc\u0163ii Erba\u015fu S.A. (lider de asociere), Energomontaj S.A. (asociat), Conest S.A., IPCT Instala\u0163i S.R.L. \u0219i Mecatron S.R.L. Contractul de proiectare \u0219i execu\u021bie, \u00een valoare de 211.500.000 de lei (f\u0103r\u0103 TVA), va fi semnat \u00een perioada urm\u0103toare, iar lucr\u0103rile sunt estimate la 33 de luni.<\/p>\n<p>Investi\u021bia Municipalit\u0103\u021bii include reabilitarea a 13 kilometri de re\u021bele termice primare \u0219i lucr\u0103ri la infrastructura conex\u0103, interven\u021bii care vor reduce semnificativ num\u0103rul avariilor \u0219i vor asigura o furnizare mai stabil\u0103 a energiei termice c\u0103tre consumatori.<\/p>\n<p>Sunt incluse segmente din re\u021beaua primar\u0103 de pe urm\u0103toarele str\u0103zi: Calea Chi\u0219odei, str. Eternit\u0103\u021bii, Izlaz, Letea, bulevardul Liviu Rebreanu, str. Ranetti, Mure\u0219, Zarand, str. Mare\u0219al Al. Averescu, Al. Ferkel Suteu, str. D. Jug\u0103naru, str. General Constantin Prezan, Versului, bulevardul Coposu, str. Pestalozzi, Aleea FC Ripensia, str. Filaret Barbu, Bra\u0219ov, Pia\u021ba Plevnei, str. Berthelot, Mendeleev \u0219i Calea Bogd\u0103ne\u0219tilor, de la Brediceanu la Mendeleev. \u00cen proiect sunt incluse \u0219i tronsoane de pe str\u0103zile: Matei Basarab, Pictor Zaicu, Ion Incule\u021b, Stelelor, Martir Ovidiu Munteanu, Martir Anton Florian, Ioan Nistor, Pomiculturii, Demetriade, Ia\u0219i, Dr. Alexandru Martha, Valeriu Brani\u0219te, Mocioni, Br\u00e2ndu\u0219ei, Calea Torontalului, Calea Alexandru Ioan Cuza, Calea Circumvala\u021biunii, Intrarea Z\u00e2nelor, Regimentul 13 C\u0103l\u0103ra\u0219i, Abrud, Al. Vaida Voievod, Prof. Lintie Dionisie \u0219i Parcul Botanic.<\/p>\n<p>\u00cen urma moderniz\u0103rii, cantitatea de energie livrat\u0103 \u00een sistem centralizat va cre\u0219te cu aproximativ 269.000 MWh\/an, chiar din primul an de la finalizarea lucr\u0103rilor. Totodat\u0103, pierderile tehnologice vor fi diminuate cu peste 44.700 MWh anual, iar emisiile de gaze cu efect de ser\u0103 vor sc\u0103dea cu aproximativ 18.733 de tone pe an.<\/p>\n<p>Proiectul \u201eRetehnologizarea sistemului centralizat de termoficare din Municipiul Timi\u0219oara \u00een vederea conform\u0103rii la normele de protec\u021bia mediului privind emisiile poluante \u00een aer \u0219i pentru cre\u0219terea eficien\u021bei \u00een alimentarea cu c\u0103ldur\u0103 urban\u0103 etapa III. Lot 1\u201d are o valoare total\u0103 de 368.519.266 lei (inclusiv TVA), din care 248.820.000 lei reprezint\u0103 finan\u021bare european\u0103 c\u00e2\u0219tigat\u0103 de municipalitate de la Ministerul Energiei, prin Fondul pentru Modernizare, iar diferen\u021ba va fi asigurat\u0103 de la bugetul local. Finan\u021barea nerambursabil\u0103 este asigurat\u0103 \u00een cadrul Programului cheie 5: Cogenerare de \u00eenalt\u0103 eficien\u021b\u0103 \u0219i modernizarea re\u021belelor de termoficare. Domeniul de investi\u021bii 5.3 Sprijin pentru modernizarea \u0219i dezvoltarea re\u021belelor inteligente de termoficare.<\/p>\n<p>Serviciu Comunicare<\/p>\n<div id=\"metaslider-id-56545\" class=\"ml-slider-3-18-9 metaslider metaslider-responsive metaslider-56545 ml-slider nav-hidden nav-hidden nav-hidden\">\n<div id=\"metaslider_container_56545\">\n<ul id=\"metaslider_56545\" class=\"rslides\">\n<li><a href=\"https:\/\/iuliustown.ro\/ro\" target=\"_blank\"><img decoding=\"async\" width=\"610\" height=\"260\" alt loading=\"lazy\" title=\"Banner Iulius Town 610x260 - februarie 2025\" class=\"slider-56545 slide-61310 lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2026\/02\/Banner-Iulius-Town-610x260-februarie-2025.png\"><img decoding=\"async\" width=\"610\" height=\"260\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2026\/02\/Banner-Iulius-Town-610x260-februarie-2025.png\" class=\"slider-56545 slide-61310\" alt loading=\"lazy\" title=\"Banner Iulius Town 610x260 - februarie 2025\"><\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"printfriendly pf-alignright\"><a href=\"https:\/\/timpolis.ro\/alti-13-kilometri-din-reteaua-de-termoficare-a-timisoarei-modernizati\/\" rel=\"nofollow\" title=\"Printer Friendly, PDF &amp; Email\"><img decoding=\"async\" alt=\"Print Friendly, PDF &amp; Email\" class=\"lazyload\" src=\"https:\/\/cdn.printfriendly.com\/buttons\/print-button.png\"><img decoding=\"async\" src=\"https:\/\/cdn.printfriendly.com\/buttons\/print-button.png\" alt=\"Print Friendly, PDF &amp; Email\"><\/a><\/div>\n<\/div>\n<div class=\"yarpp-related\">\n<h3>\u015etiri din aceea\u015fi categorie:<\/h3>\n<div class=\"yarpp-thumbnails-horizontal\"><a class=\"yarpp-thumbnail\" rel=\"norewrite\" href=\"https:\/\/timpolis.ro\/doua-oferte-pentru-modernizarea-sistemului-de-termoficare-al-timisoarei\/\" title=\"Dou\u0103 oferte pentru modernizarea sistemului de termoficare al Timi\u0219oarei\"><img decoding=\"async\" width=\"120\" height=\"120\" alt loading=\"lazy\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT-120x120.jpg\"><img decoding=\"async\" width=\"120\" height=\"120\" alt loading=\"lazy\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT-120x120.jpg\"><img decoding=\"async\" width=\"120\" height=\"120\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT-120x120.jpg\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image\" alt loading=\"lazy\"><span class=\"yarpp-thumbnail-title\">Dou\u0103 oferte pentru modernizarea sistemului de termoficare al Timi\u0219oarei<\/span><\/a><a class=\"yarpp-thumbnail\" rel=\"norewrite\" href=\"https:\/\/timpolis.ro\/primaria-vrea-sa-schimbe-4-kilometri-de-magistrale-de-termoficare\/\" title=\"Prim\u0103ria vrea s\u0103 schimbe 4 kilometri de magistrale de termoficare\"><img decoding=\"async\" width=\"120\" height=\"120\" alt loading=\"lazy\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2022\/10\/Retele-Colterm-inlocuite-Foto-PMT-120x120.jpg\"><img decoding=\"async\" width=\"120\" height=\"120\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2022\/10\/Retele-Colterm-inlocuite-Foto-PMT-120x120.jpg\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image\" alt loading=\"lazy\"><span class=\"yarpp-thumbnail-title\">Prim\u0103ria vrea s\u0103 schimbe 4 kilometri de magistrale de termoficare<\/span><\/a><a class=\"yarpp-thumbnail\" rel=\"norewrite\" href=\"https:\/\/timpolis.ro\/investitie-de-aproape-50-de-milioane-de-euro-in-reteaua-de-termoficare-a-timisoarei\/\" title=\"Investi\u021bie de aproape 50 de milioane de euro, \u00een re\u021beaua de termoficare a Timi\u015foarei\"><img decoding=\"async\" width=\"120\" height=\"120\" alt loading=\"lazy\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2024\/10\/Conducte-termoficare-Foto-PMT-120x120.jpg\"><img decoding=\"async\" width=\"120\" height=\"120\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2024\/10\/Conducte-termoficare-Foto-PMT-120x120.jpg\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image\" alt loading=\"lazy\"><span class=\"yarpp-thumbnail-title\">Investi\u021bie de aproape 50 de milioane de euro, \u00een re\u021beaua de termoficare a Timi\u015foarei<\/span><\/a><a class=\"yarpp-thumbnail\" rel=\"norewrite\" href=\"https:\/\/timpolis.ro\/proiectul-de-reabilitare-a-29-de-kilometri-din-reteaua-de-termoficare-a-timisoarei-finalizat\/\" title=\"Proiectul de reabilitare a 29 de kilometri din re\u021beaua de termoficare a Timi\u015foarei, finalizat\"><img decoding=\"async\" width=\"120\" height=\"120\" alt loading=\"lazy\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT-120x120.jpg\"><img decoding=\"async\" width=\"120\" height=\"120\" alt loading=\"lazy\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT-120x120.jpg\"><img decoding=\"async\" width=\"120\" height=\"120\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT-120x120.jpg\" class=\"attachment-yarpp-thumbnail size-yarpp-thumbnail wp-post-image\" alt loading=\"lazy\"><span class=\"yarpp-thumbnail-title\">Proiectul de reabilitare a 29 de kilometri din re\u021beaua de termoficare a Timi\u015foarei, finalizat<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"pf-content\">\n<div id=\"attachment_51555\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-51555\" loading=\"lazy\" title=\"Reabilitare retea termoficare Timisoara (2) Foto PMT\" alt width=\"900\" height=\"600\" class=\"wp-image-51555 size-full lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-51555\" loading=\"lazy\" class=\"wp-image-51555 size-full\" title=\"Reabilitare retea termoficare Timisoara (2) Foto PMT\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg\" alt width=\"900\" height=\"600\"><\/a><\/p>\n<p id=\"caption-attachment-51555\" class=\"wp-caption-text\">Sur\u0103s foto: Prim\u0103ria Timi\u015foara<\/p>\n<\/div>\n<p><strong>Prim\u0103ria Municipiului Timi\u0219oara anun\u0163\u0103 c\u0103 a atribuit contractul pentru modernizarea a aproximativ 13 km din re\u021beaua primar\u0103 de termoficare, pe tronsoane unde se \u00eenregistreaz\u0103 \u00een prezent cele mai multe avarii \u0219i cele mai mari pierderi de energie.<\/strong><\/p>\n<p>\u00a0<\/p>\n<p>Investi\u021bia consolideaz\u0103 eforturile pentru modernizarea re\u021belei \u0219i vine \u00een completarea proiectului prin care municipalitatea a \u00eenlocuit aproape 30 de kilometri de conducte \u0219i a modernizat 25 de puncte termice \u00een ultimii ani. Prin noul contract, magistralele degradate vor fi \u00eenlocuite integral, iar tronsoane din conductele, aflate \u00eenc\u0103 la suprafa\u021b\u0103, vor fi introduse \u00een subteran.<\/p>\n<p><em>\u201eE un proiect crucial pentru reducerea pierderilor din re\u021beaua de distribu\u021bie a c\u0103ldurii \u0219i a apei calde. E, \u00een acela\u0219i timp, un proiect care va cre\u0219te calitatea spa\u021biului public: multe din conductele uria\u0219e, ruginite, care pleac\u0103 de la CET Sud \u0219i care acum sunt la suprafa\u021b\u0103 vor fi \u00eenlocuite \u0219i mutate \u00een subteran. Vom traversa cu \u0219antierul 9 cartiere ale Timi\u0219oarei \u0219i sunt \u00eencrez\u0103tor c\u0103 la finalul proiectului calitatea serviciilor pentru timi\u0219oreni va fi mai bun\u0103<\/em>\u201d, spune primarul <strong>Dominic Fritz<\/strong>.<\/p>\n<p>Contractul pentru proiectarea \u0219i execu\u021bia lucr\u0103rilor de reabilitare a magistralei principale care pleac\u0103 de la CET Sud \u0219i asigur\u0103 distribu\u021bia agentului termic \u00een \u00eentreg ora\u0219ul a fost atribuit Asocierii Construc\u0163ii Erba\u015fu S.A. (lider de asociere), Energomontaj S.A. (asociat), Conest S.A., IPCT Instala\u0163i S.R.L. \u0219i Mecatron S.R.L. Contractul de proiectare \u0219i execu\u021bie, \u00een valoare de 211.500.000 de lei (f\u0103r\u0103 TVA), va fi semnat \u00een perioada urm\u0103toare, iar lucr\u0103rile sunt estimate la 33 de luni.<\/p>\n<p>Investi\u021bia Municipalit\u0103\u021bii include reabilitarea a 13 kilometri de re\u021bele termice primare \u0219i lucr\u0103ri la infrastructura conex\u0103, interven\u021bii care vor reduce semnificativ num\u0103rul avariilor \u0219i vor asigura o furnizare mai stabil\u0103 a energiei termice c\u0103tre consumatori.<\/p>\n<p>Sunt incluse segmente din re\u021beaua primar\u0103 de pe urm\u0103toarele str\u0103zi: Calea Chi\u0219odei, str. Eternit\u0103\u021bii, Izlaz, Letea, bulevardul Liviu Rebreanu, str. Ranetti, Mure\u0219, Zarand, str. Mare\u0219al Al. Averescu, Al. Ferkel Suteu, str. D. Jug\u0103naru, str. General Constantin Prezan, Versului, bulevardul Coposu, str. Pestalozzi, Aleea FC Ripensia, str. Filaret Barbu, Bra\u0219ov, Pia\u021ba Plevnei, str. Berthelot, Mendeleev \u0219i Calea Bogd\u0103ne\u0219tilor, de la Brediceanu la Mendeleev. \u00cen proiect sunt incluse \u0219i tronsoane de pe str\u0103zile: Matei Basarab, Pictor Zaicu, Ion Incule\u021b, Stelelor, Martir Ovidiu Munteanu, Martir Anton Florian, Ioan Nistor, Pomiculturii, Demetriade, Ia\u0219i, Dr. Alexandru Martha, Valeriu Brani\u0219te, Mocioni, Br\u00e2ndu\u0219ei, Calea Torontalului, Calea Alexandru Ioan Cuza, Calea Circumvala\u021biunii, Intrarea Z\u00e2nelor, Regimentul 13 C\u0103l\u0103ra\u0219i, Abrud, Al. Vaida Voievod, Prof. Lintie Dionisie \u0219i Parcul Botanic.<\/p>\n<p>\u00cen urma moderniz\u0103rii, cantitatea de energie livrat\u0103 \u00een sistem centralizat va cre\u0219te cu aproximativ 269.000 MWh\/an, chiar din primul an de la finalizarea lucr\u0103rilor. Totodat\u0103, pierderile tehnologice vor fi diminuate cu peste 44.700 MWh anual, iar emisiile de gaze cu efect de ser\u0103 vor sc\u0103dea cu aproximativ 18.733 de tone pe an.<\/p>\n<p>Proiectul \u201eRetehnologizarea sistemului centralizat de termoficare din Municipiul Timi\u0219oara \u00een vederea conform\u0103rii la normele de protec\u021bia mediului privind emisiile poluante \u00een aer \u0219i pentru cre\u0219terea eficien\u021bei \u00een alimentarea cu c\u0103ldur\u0103 urban\u0103 etapa III. Lot 1\u201d are o valoare total\u0103 de 368.519.266 lei (inclusiv TVA), din care 248.820.000 lei reprezint\u0103 finan\u021bare european\u0103 c\u00e2\u0219tigat\u0103 de municipalitate de la Ministerul Energiei, prin Fondul pentru Modernizare, iar diferen\u021ba va fi asigurat\u0103 de la bugetul local. Finan\u021barea nerambursabil\u0103 este asigurat\u0103 \u00een cadrul Programului cheie 5: Cogenerare de \u00eenalt\u0103 eficien\u021b\u0103 \u0219i modernizarea re\u021belelor de termoficare. Domeniul de investi\u021bii 5.3 Sprijin pentru modernizarea \u0219i dezvoltarea re\u021belelor inteligente de termoficare.<\/p>\n<p>Serviciu Comunicare<\/p>\n<div id=\"metaslider-id-56545\" class=\"ml-slider-3-18-9 metaslider metaslider-responsive metaslider-56545 ml-slider nav-hidden nav-hidden nav-hidden\">\n<div id=\"metaslider_container_56545\">\n<ul id=\"metaslider_56545\" class=\"rslides\">\n<li><a href=\"https:\/\/iuliustown.ro\/ro\" target=\"_blank\"><img decoding=\"async\" width=\"610\" height=\"260\" alt loading=\"lazy\" title=\"Banner Iulius Town 610x260 - februarie 2025\" class=\"slider-56545 slide-61310 lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2026\/02\/Banner-Iulius-Town-610x260-februarie-2025.png\"><img decoding=\"async\" width=\"610\" height=\"260\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2026\/02\/Banner-Iulius-Town-610x260-februarie-2025.png\" class=\"slider-56545 slide-61310\" alt loading=\"lazy\" title=\"Banner Iulius Town 610x260 - februarie 2025\"><\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"printfriendly pf-alignright\"><a href=\"https:\/\/timpolis.ro\/alti-13-kilometri-din-reteaua-de-termoficare-a-timisoarei-modernizati\/\" rel=\"nofollow\" title=\"Printer Friendly, PDF &amp; Email\"><img decoding=\"async\" alt=\"Print Friendly, PDF &amp; Email\" class=\"lazyload\" src=\"https:\/\/cdn.printfriendly.com\/buttons\/print-button.png\"><img decoding=\"async\" src=\"https:\/\/cdn.printfriendly.com\/buttons\/print-button.png\" alt=\"Print Friendly, PDF &amp; Email\"><\/a><\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/timpolis.ro\/alti-13-kilometri-din-reteaua-de-termoficare-a-timisoarei-modernizati\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpghttps:\/\/timpolis.ro\/wp-content\/uploads\/2023\/08\/Reabilitare-retea-termoficare-Timisoara-2-Foto-PMT.jpg&#8221;] Sur\u0103s foto: Prim\u0103ria Timi\u015foara Prim\u0103ria Municipiului Timi\u0219oara anun\u0163\u0103 c\u0103 a atribuit contractul pentru modernizarea a aproximativ 13 km din re\u021beaua primar\u0103 de termoficare, pe tronsoane unde se \u00eenregistreaz\u0103 \u00een prezent cele mai multe avarii \u0219i cele mai mari pierderi de energie. \u00a0 Investi\u021bia consolideaz\u0103 eforturile pentru modernizarea re\u021belei \u0219i vine \u00een completarea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,202],"class_list":["post-1804004","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-timpolis-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1804004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1804004"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1804004\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1804004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1804004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1804004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}