{"id":1794416,"date":"2026-02-26T10:55:01","date_gmt":"2026-02-26T07:55:01","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1794416"},"modified":"2026-02-26T10:55:01","modified_gmt":"2026-02-26T07:55:01","slug":"afacerea-nucleara-a-fratilor-muresan-lovita-de-scandalul-american-de-manipulare-nuscale-entra1","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1794416","title":{"rendered":"Afacerea nuclear\u0103 a fra\u021bilor Mure\u0219an, lovit\u0103 de scandalul american de manipulare NuScale\u2013ENTRA1"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/solidnews.ro\/wp-content\/uploads\/2026\/02\/afacere-nucleara-fratii-muresan.jpg.webp&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_120 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_120\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>Probleme nucleare c\u00e2t casa \u00een curtea fra\u021bilor Mure\u0219an, prin\u0219i cu pariul lor pe tehnologia american\u0103 NuScale pentru reactorul SMR de la Doice\u0219ti exact c\u00e2nd compania-mam\u0103 din SUA e t\u00e2r\u00e2t\u0103 \u00eentr-un proces colectiv pentru manipularea bursei \u0219i \u00een\u0219elarea investitorilor. Americanii de la NuScale, cei care furnizeaz\u0103 tehnologia pentru proiectul RoPower Nuclear al Nuclearelectrica \u0219i Nova Power &amp; Gas (E-INFRA), sunt acuza\u021bi \u00een Statele Unite c\u0103 au v\u00e2ndut investitorilor o poveste frumoas\u0103 pe h\u00e2rtie, sprijinit\u0103 pe un partener fantom\u0103: ENTRA1 Energy.<\/strong><\/p>\n<p>Asocia\u021bii americani ai Nova Power &amp; Gas, prin NuScale, au anun\u021bat cu surle \u0219i tr\u00e2mbi\u021be, anul trecut, semnarea unui contract pentru 6 noi centrale nucleare destinate s\u0103 livreze energie industriei din statul Tennessee, prin ENTRA1 Energy, o companie prezentat\u0103 ca \u201eplatform\u0103 global\u0103 independent\u0103 de produc\u021bie de energie\u201d. \u00cen realitate, din documentele depuse \u00een instan\u021b\u0103 reiese c\u0103 ENTRA1 este o firm\u0103 ap\u0103rut\u0103 \u00een 2022, cu doar 3 angaja\u021bi, f\u0103r\u0103 niciun proiect construit, finan\u021bat sau operat \u00een zona energiei, cu zero experien\u021b\u0103 \u00een domeniul nuclear \u0219i controlat\u0103 practic de o singur\u0103 persoan\u0103,\u00a0<strong>Wadie Habboush<\/strong>.<\/p>\n<p>Pl\u00e2ngerea colectiv\u0103 depus\u0103 \u00een SUA sus\u021bine c\u0103 NuScale a ascuns de investitori c\u0103: (1) ENTRA1 nu a construit, finan\u021bat sau operat vreodat\u0103 proiecte semnificative, cu at\u00e2t mai pu\u021bin \u00een domeniul extrem de tehnic al energiei nucleare; (2) compania american\u0103 a aruncat responsabilitatea comercializ\u0103rii, distribu\u021biei \u0219i implement\u0103rii reactoarelor sale, plus sute de milioane de dolari din capital, \u00eentr-o entitate f\u0103r\u0103 experien\u021b\u0103 real\u0103 \u00een centrale nucleare; (3) experien\u021ba \u0219i \u201epalmaresul\u201d prezentate investitorilor ca apar\u021bin\u00e2nd ENTRA1 erau, de fapt, ale unor directori de la Habboush Group, o alt\u0103 entitate, \u0219i ea f\u0103r\u0103 istoric serios \u00een nuclear; (4) toat\u0103 strategia de comercializare a NuScale a fost expus\u0103 unor riscuri majore \u0219i nedezv\u0103luite de e\u0219ec, \u00eent\u00e2rzieri, blocaje de reglementare \u0219i alte bombe cu ceas.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-333388 ewww_webp_loaded\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg.webp\" alt width=\"1200\" height=\"873\" data-src-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg\" data-src-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg.webp\" data-srcset-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg.webp 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-300x218.jpg.webp 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-768x559.jpg.webp 768w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-324x235.jpg.webp 324w\" data-srcset-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-300x218.jpg 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-768x559.jpg 768w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-324x235.jpg 324w\" data-eio=\"j\"><\/figure>\n<p>Pe 6 noiembrie 2025, NuScale a raportat o gaur\u0103 de peste jum\u0103tate de miliard de dolari pe trimestrul 3, dup\u0103 o plat\u0103 uria\u0219\u0103 de 495 milioane dolari c\u0103tre ENTRA1, legat\u0103 de un acord cu Tennessee Valley Authority (TVA), gigantul energetic de stat al SUA. Memorandumul prevedea ca ENTRA1 s\u0103 dezvolte, construiasc\u0103 \u0219i opereze 6 centrale nucleare bazate pe SMR-urile NuScale, cu o capacitate total\u0103 de p\u00e2n\u0103 la 6.000 MW, \u0219i s\u0103 v\u00e2nd\u0103 \u00een avans energia produs\u0103 c\u0103tre TVA. Dup\u0103 anun\u021barea pierderilor, ac\u021biunile NuScale au c\u0103zut cu peste 12% \u00een dou\u0103 zile, de la circa 32 dolari la 28 dolari pe ac\u021biune, continu\u00e2nd pr\u0103bu\u0219irea p\u00e2n\u0103 la aproximativ 17 dolari pe 21 noiembrie \u2013 peste 70% sub maximul perioadei vizate de proces, de peste 57 dolari pe ac\u021biune.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-333387 ewww_webp_loaded\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg.webp\" alt width=\"1200\" height=\"555\" data-src-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg\" data-src-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg.webp\" data-srcset-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg.webp 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-300x139.jpg.webp 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-768x355.jpg.webp 768w\" data-srcset-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-300x139.jpg 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-768x355.jpg 768w\" data-eio=\"j\"><\/figure>\n<p>Avoca\u021bii care reprezint\u0103 investitorii nu ocolesc cuvintele grele: \u2033P\u00e2r\u00e2\u021bii au avut \u0219i motiva\u021bia, \u0219i oportunitatea de a-i frauda pe investitori. \u00cen timp ce pre\u021bul ac\u021biunilor NuScale era umflat artificial, compania a emis \u0219i v\u00e2ndut ac\u021biuni de peste 475 milioane dolari \u00een august 2025, iar ac\u021bionarul Fluor a v\u00e2ndut alte peste 600 milioane dolari \u00een acela\u0219i interval, cu pu\u021bin \u00eenainte ca informa\u021biile reale s\u0103 ias\u0103 la suprafa\u021b\u0103\u2033. Cu alte cuvinte, cine \u0219tia, a avut timp s\u0103 ias\u0103 din schem\u0103, iar cine a crezut \u00een povestea \u201eindependen\u021bei energetice pe baz\u0103 de SMR-uri\u201d a r\u0103mas cu ac\u021biunile pr\u0103bu\u0219ite \u0219i cu avocatul la u\u0219\u0103.<\/p>\n<p>\u00cen tot acest timp, Rom\u00e2nia este \u00eempins\u0103 \u00eentr-un proiect construit exact pe aceast\u0103 tehnologie NuScale: centrala SMR de 462 MW de la Doice\u0219ti, dezvoltat\u0103 prin joint-venture-ul RoPower Nuclear SA, de\u021binut \u00een cote egale de Nuclearelectrica \u0219i Nova Power &amp; Gas din grupul E-INFRA al fra\u021bilor clujeni Teofil \u0219i Simion Mure\u0219an, al\u0103turi de Marian Pantazescu. Statul rom\u00e2n, prin Nuclearelectrica, a aprobat recent decizia final\u0103 de investi\u021bie, impus\u0103 cu votul decisiv al Ministerului Energiei, cu o arhitectur\u0103 financiar\u0103 care arat\u0103 clar c\u0103 Rom\u00e2nia va pl\u0103ti ini\u021bial un singur modul de 77 MW, restul urm\u00e2nd s\u0103 fie construite doar dac\u0103 primul reactor se dovede\u0219te func\u021bional \u0219i profitabil.<\/p>\n<p>Ministrul Energiei, Bogdan Ivan, a ie\u0219it de la Davos entuziasmat de scenariile discutate cu oficialii Administra\u021biei Federale Trump, inclusiv cu secretarul pentru Energie, Chris Wright, \u0219i a anun\u021bat public c\u0103 proiectul SMR de la Doice\u0219ti are verde \u0219i va face din Rom\u00e2nia un \u201elider regional\u201d \u00een tehnologia nuclear\u0103 modular\u0103. Statul american a subven\u021bionat cu sute de milioane de dolari dezvoltarea tehnologiei NuScale, iar la Bucure\u0219ti se vinde povestea drept model de \u201eparteneriat strategic\u201d \u00een energie, de\u0219i \u00een instan\u021bele americane aceea\u0219i tehnologie vine la pachet cu acuza\u021bii de manipulare de pia\u021b\u0103, divulg\u0103ri incomplete \u0219i parteneri f\u0103r\u0103 carte de vizit\u0103 \u00een energie-nucleara.<\/p>\n<p><strong>Planurile ministrului \u0219i ale fra\u021bilor Mure\u0219an lovesc \u00eens\u0103 de un zid la Palatul Victoria: premierul Ilie Bolojan a spus r\u0103spicat, \u00eentr-o emisiune radio, c\u0103 nu are \u00eencredere \u00eentr-o tehnologie netestat\u0103 \u0219i c\u0103 pentru statul rom\u00e2n prioritatea trebuie s\u0103 fie Cernavod\u0103, nu experimentele scumpe cu SMR-uri. Bolojan a subliniat c\u0103, \u00eenainte ca Guvernul s\u0103 bage miliarde \u00een Doice\u0219ti, trebuie v\u0103zut stadiul lucr\u0103rilor la reactorul 1 de la Cernavod\u0103, unde retehnologizarea trece de 3,5 miliarde euro, \u0219i proiectul de construire a unit\u0103\u021bilor 3 \u0219i 4, estimat la circa 7 miliarde euro, pe o tehnologie deja operat\u0103 cu succes \u00een Rom\u00e2nia.<\/strong><\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-333396 ewww_webp_loaded\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg.webp\" alt width=\"1200\" height=\"799\" data-src-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg\" data-src-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg.webp\" data-srcset-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg.webp 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-300x200.jpg.webp 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-768x511.jpg.webp 768w\" data-srcset-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-300x200.jpg 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-768x511.jpg 768w\" data-eio=\"j\"><\/figure>\n<p><strong>Premierul a amintit c\u0103 investi\u021bia de la Doice\u0219ti, de 6\u20137 miliarde dolari pentru 462 MW instala\u021bi, este comparabil\u0103 cu dou\u0103 treimi dintr-un reactor clasic de la Cernavod\u0103, dar cu incomparabil mai multe necunoscute: tehnologie nou\u0103, partener comercial controversat \u0219i un model de finan\u021bare care risc\u0103 s\u0103 fie \u00eempins pe spinarea consumatorilor prin contracte pentru diferen\u021b\u0103 (CfD) \u0219i pre\u021buri minime garantate. Tocmai de aceea, Bolojan estimeaz\u0103 c\u0103 nu vom vedea o investi\u021bie efectiv\u0103 peste noapte \u0219i c\u0103 proiectele mari de la Cernavod\u0103, pe tehnologie deja testat\u0103, sunt \u201emai fezabile\u201d dec\u00e2t mini-reactoarele NuScale de la Doice\u0219ti.<\/strong><\/p>\n<p><strong>Mesajul premierului, tradus \u00een limbajul pie\u021bei, sun\u0103 a trimis fra\u021bii Mure\u0219an la plimbare: proiectul lor nuclear nu este prioritar pentru Guvern, iar statul nu pare dispus s\u0103 se arunce cu ochii \u00eenchi\u0219i \u00eentr-o schem\u0103 \u00een care nici nu este clar cui \u0219i \u00een ce condi\u021bii se va livra energia. \u00cen asocierile RoPower\u2013NuScale \u00eenc\u0103 nu e l\u0103murit dac\u0103 energia va fi v\u00e2ndut\u0103 \u00een pia\u021ba liber\u0103, cu pre\u021b plafonat, \u0219i cine va acoperi diferen\u021ba dac\u0103 tariful se pr\u0103bu\u0219e\u0219te sub prag \u2013 un scenariu \u00een care nota de plat\u0103 ajunge inevitabil tot la consumatorul rom\u00e2n.<\/strong><\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-333390\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/nuscale-doicesti.webp\" alt width=\"770\" height=\"421\"><\/figure>\n<p>\u00cen timp ce proiectul SMR ridic\u0103 tot mai multe semne de \u00eentrebare, grupul E-INFRA al fra\u021bilor Mure\u0219an \u00ee\u0219i consolideaz\u0103 pozi\u021biile \u00een restul pie\u021bei energetice, de la achizi\u021bia Netcity de la UTI p\u00e2n\u0103 la inaugurarea parcului de baterii de la Flore\u0219ti \u0219i a centralei electrice pe gaz menit\u0103 s\u0103 acopere v\u00e2rfurile de consum din zona Clujului. Cu hidrocentralele de la M\u0103ri\u0219el \u0219i Colibi\u021ba blocate \u00een \u0219antiere care se \u00eentind pe ani, Clujul r\u0103m\u00e2ne \u00eentr-un deficit cronic de energie, iar Mure\u0219anii umplu elegant g\u0103urile cu propriile investi\u021bii \u2013 \u0219i, dac\u0103 le iese \u0219i Doice\u0219ti, ar urma s\u0103 joace \u00een liga mare a nuclearului, chiar dac\u0103 tehnologia pe care pariaz\u0103 este ast\u0103zi mai mult \u00een sala de judecat\u0103 dec\u00e2t \u00een teren.<\/p>\n<p><em><strong>surs\u0103:<a href=\"https:\/\/gazetadecluj.ro\/afacerea-nucleara-a-fratilor-muresan-lovita-de-scandalul-american-de-manipulare-nuscale-entra1\/\"> gazetadecluj.ro<\/a><\/strong><\/em><\/p>\n<\/div>\n<\/div>\n<div class=\"td_block_wrap tdb_single_content tdi_120 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_120\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>Probleme nucleare c\u00e2t casa \u00een curtea fra\u021bilor Mure\u0219an, prin\u0219i cu pariul lor pe tehnologia american\u0103 NuScale pentru reactorul SMR de la Doice\u0219ti exact c\u00e2nd compania-mam\u0103 din SUA e t\u00e2r\u00e2t\u0103 \u00eentr-un proces colectiv pentru manipularea bursei \u0219i \u00een\u0219elarea investitorilor. Americanii de la NuScale, cei care furnizeaz\u0103 tehnologia pentru proiectul RoPower Nuclear al Nuclearelectrica \u0219i Nova Power &amp; Gas (E-INFRA), sunt acuza\u021bi \u00een Statele Unite c\u0103 au v\u00e2ndut investitorilor o poveste frumoas\u0103 pe h\u00e2rtie, sprijinit\u0103 pe un partener fantom\u0103: ENTRA1 Energy.<\/strong><\/p>\n<p>Asocia\u021bii americani ai Nova Power &amp; Gas, prin NuScale, au anun\u021bat cu surle \u0219i tr\u00e2mbi\u021be, anul trecut, semnarea unui contract pentru 6 noi centrale nucleare destinate s\u0103 livreze energie industriei din statul Tennessee, prin ENTRA1 Energy, o companie prezentat\u0103 ca \u201eplatform\u0103 global\u0103 independent\u0103 de produc\u021bie de energie\u201d. \u00cen realitate, din documentele depuse \u00een instan\u021b\u0103 reiese c\u0103 ENTRA1 este o firm\u0103 ap\u0103rut\u0103 \u00een 2022, cu doar 3 angaja\u021bi, f\u0103r\u0103 niciun proiect construit, finan\u021bat sau operat \u00een zona energiei, cu zero experien\u021b\u0103 \u00een domeniul nuclear \u0219i controlat\u0103 practic de o singur\u0103 persoan\u0103,\u00a0<strong>Wadie Habboush<\/strong>.<\/p>\n<p>Pl\u00e2ngerea colectiv\u0103 depus\u0103 \u00een SUA sus\u021bine c\u0103 NuScale a ascuns de investitori c\u0103: (1) ENTRA1 nu a construit, finan\u021bat sau operat vreodat\u0103 proiecte semnificative, cu at\u00e2t mai pu\u021bin \u00een domeniul extrem de tehnic al energiei nucleare; (2) compania american\u0103 a aruncat responsabilitatea comercializ\u0103rii, distribu\u021biei \u0219i implement\u0103rii reactoarelor sale, plus sute de milioane de dolari din capital, \u00eentr-o entitate f\u0103r\u0103 experien\u021b\u0103 real\u0103 \u00een centrale nucleare; (3) experien\u021ba \u0219i \u201epalmaresul\u201d prezentate investitorilor ca apar\u021bin\u00e2nd ENTRA1 erau, de fapt, ale unor directori de la Habboush Group, o alt\u0103 entitate, \u0219i ea f\u0103r\u0103 istoric serios \u00een nuclear; (4) toat\u0103 strategia de comercializare a NuScale a fost expus\u0103 unor riscuri majore \u0219i nedezv\u0103luite de e\u0219ec, \u00eent\u00e2rzieri, blocaje de reglementare \u0219i alte bombe cu ceas.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-333388 ewww_webp_loaded\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg.webp\" alt width=\"1200\" height=\"873\" data-src-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg\" data-src-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg.webp\" data-srcset-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg.webp 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-300x218.jpg.webp 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-768x559.jpg.webp 768w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-324x235.jpg.webp 324w\" data-srcset-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23.jpg 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-300x218.jpg 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-768x559.jpg 768w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-23-324x235.jpg 324w\" data-eio=\"j\"><\/figure>\n<p>Pe 6 noiembrie 2025, NuScale a raportat o gaur\u0103 de peste jum\u0103tate de miliard de dolari pe trimestrul 3, dup\u0103 o plat\u0103 uria\u0219\u0103 de 495 milioane dolari c\u0103tre ENTRA1, legat\u0103 de un acord cu Tennessee Valley Authority (TVA), gigantul energetic de stat al SUA. Memorandumul prevedea ca ENTRA1 s\u0103 dezvolte, construiasc\u0103 \u0219i opereze 6 centrale nucleare bazate pe SMR-urile NuScale, cu o capacitate total\u0103 de p\u00e2n\u0103 la 6.000 MW, \u0219i s\u0103 v\u00e2nd\u0103 \u00een avans energia produs\u0103 c\u0103tre TVA. Dup\u0103 anun\u021barea pierderilor, ac\u021biunile NuScale au c\u0103zut cu peste 12% \u00een dou\u0103 zile, de la circa 32 dolari la 28 dolari pe ac\u021biune, continu\u00e2nd pr\u0103bu\u0219irea p\u00e2n\u0103 la aproximativ 17 dolari pe 21 noiembrie \u2013 peste 70% sub maximul perioadei vizate de proces, de peste 57 dolari pe ac\u021biune.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-333387 ewww_webp_loaded\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg.webp\" alt width=\"1200\" height=\"555\" data-src-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg\" data-src-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg.webp\" data-srcset-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg.webp 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-300x139.jpg.webp 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-768x355.jpg.webp 768w\" data-srcset-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22.jpg 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-300x139.jpg 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/image-8-22-768x355.jpg 768w\" data-eio=\"j\"><\/figure>\n<p>Avoca\u021bii care reprezint\u0103 investitorii nu ocolesc cuvintele grele: \u2033P\u00e2r\u00e2\u021bii au avut \u0219i motiva\u021bia, \u0219i oportunitatea de a-i frauda pe investitori. \u00cen timp ce pre\u021bul ac\u021biunilor NuScale era umflat artificial, compania a emis \u0219i v\u00e2ndut ac\u021biuni de peste 475 milioane dolari \u00een august 2025, iar ac\u021bionarul Fluor a v\u00e2ndut alte peste 600 milioane dolari \u00een acela\u0219i interval, cu pu\u021bin \u00eenainte ca informa\u021biile reale s\u0103 ias\u0103 la suprafa\u021b\u0103\u2033. Cu alte cuvinte, cine \u0219tia, a avut timp s\u0103 ias\u0103 din schem\u0103, iar cine a crezut \u00een povestea \u201eindependen\u021bei energetice pe baz\u0103 de SMR-uri\u201d a r\u0103mas cu ac\u021biunile pr\u0103bu\u0219ite \u0219i cu avocatul la u\u0219\u0103.<\/p>\n<p>\u00cen tot acest timp, Rom\u00e2nia este \u00eempins\u0103 \u00eentr-un proiect construit exact pe aceast\u0103 tehnologie NuScale: centrala SMR de 462 MW de la Doice\u0219ti, dezvoltat\u0103 prin joint-venture-ul RoPower Nuclear SA, de\u021binut \u00een cote egale de Nuclearelectrica \u0219i Nova Power &amp; Gas din grupul E-INFRA al fra\u021bilor clujeni Teofil \u0219i Simion Mure\u0219an, al\u0103turi de Marian Pantazescu. Statul rom\u00e2n, prin Nuclearelectrica, a aprobat recent decizia final\u0103 de investi\u021bie, impus\u0103 cu votul decisiv al Ministerului Energiei, cu o arhitectur\u0103 financiar\u0103 care arat\u0103 clar c\u0103 Rom\u00e2nia va pl\u0103ti ini\u021bial un singur modul de 77 MW, restul urm\u00e2nd s\u0103 fie construite doar dac\u0103 primul reactor se dovede\u0219te func\u021bional \u0219i profitabil.<\/p>\n<p>Ministrul Energiei, Bogdan Ivan, a ie\u0219it de la Davos entuziasmat de scenariile discutate cu oficialii Administra\u021biei Federale Trump, inclusiv cu secretarul pentru Energie, Chris Wright, \u0219i a anun\u021bat public c\u0103 proiectul SMR de la Doice\u0219ti are verde \u0219i va face din Rom\u00e2nia un \u201elider regional\u201d \u00een tehnologia nuclear\u0103 modular\u0103. Statul american a subven\u021bionat cu sute de milioane de dolari dezvoltarea tehnologiei NuScale, iar la Bucure\u0219ti se vinde povestea drept model de \u201eparteneriat strategic\u201d \u00een energie, de\u0219i \u00een instan\u021bele americane aceea\u0219i tehnologie vine la pachet cu acuza\u021bii de manipulare de pia\u021b\u0103, divulg\u0103ri incomplete \u0219i parteneri f\u0103r\u0103 carte de vizit\u0103 \u00een energie-nucleara.<\/p>\n<p><strong>Planurile ministrului \u0219i ale fra\u021bilor Mure\u0219an lovesc \u00eens\u0103 de un zid la Palatul Victoria: premierul Ilie Bolojan a spus r\u0103spicat, \u00eentr-o emisiune radio, c\u0103 nu are \u00eencredere \u00eentr-o tehnologie netestat\u0103 \u0219i c\u0103 pentru statul rom\u00e2n prioritatea trebuie s\u0103 fie Cernavod\u0103, nu experimentele scumpe cu SMR-uri. Bolojan a subliniat c\u0103, \u00eenainte ca Guvernul s\u0103 bage miliarde \u00een Doice\u0219ti, trebuie v\u0103zut stadiul lucr\u0103rilor la reactorul 1 de la Cernavod\u0103, unde retehnologizarea trece de 3,5 miliarde euro, \u0219i proiectul de construire a unit\u0103\u021bilor 3 \u0219i 4, estimat la circa 7 miliarde euro, pe o tehnologie deja operat\u0103 cu succes \u00een Rom\u00e2nia.<\/strong><\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-333396 ewww_webp_loaded\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg.webp\" alt width=\"1200\" height=\"799\" data-src-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg\" data-src-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg.webp\" data-srcset-webp=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg.webp 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-300x200.jpg.webp 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-768x511.jpg.webp 768w\" data-srcset-img=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta.jpg 1200w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-300x200.jpg 300w, https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/ilie-bolojan-ameninta-768x511.jpg 768w\" data-eio=\"j\"><\/figure>\n<p><strong>Premierul a amintit c\u0103 investi\u021bia de la Doice\u0219ti, de 6\u20137 miliarde dolari pentru 462 MW instala\u021bi, este comparabil\u0103 cu dou\u0103 treimi dintr-un reactor clasic de la Cernavod\u0103, dar cu incomparabil mai multe necunoscute: tehnologie nou\u0103, partener comercial controversat \u0219i un model de finan\u021bare care risc\u0103 s\u0103 fie \u00eempins pe spinarea consumatorilor prin contracte pentru diferen\u021b\u0103 (CfD) \u0219i pre\u021buri minime garantate. Tocmai de aceea, Bolojan estimeaz\u0103 c\u0103 nu vom vedea o investi\u021bie efectiv\u0103 peste noapte \u0219i c\u0103 proiectele mari de la Cernavod\u0103, pe tehnologie deja testat\u0103, sunt \u201emai fezabile\u201d dec\u00e2t mini-reactoarele NuScale de la Doice\u0219ti.<\/strong><\/p>\n<p><strong>Mesajul premierului, tradus \u00een limbajul pie\u021bei, sun\u0103 a trimis fra\u021bii Mure\u0219an la plimbare: proiectul lor nuclear nu este prioritar pentru Guvern, iar statul nu pare dispus s\u0103 se arunce cu ochii \u00eenchi\u0219i \u00eentr-o schem\u0103 \u00een care nici nu este clar cui \u0219i \u00een ce condi\u021bii se va livra energia. \u00cen asocierile RoPower\u2013NuScale \u00eenc\u0103 nu e l\u0103murit dac\u0103 energia va fi v\u00e2ndut\u0103 \u00een pia\u021ba liber\u0103, cu pre\u021b plafonat, \u0219i cine va acoperi diferen\u021ba dac\u0103 tariful se pr\u0103bu\u0219e\u0219te sub prag \u2013 un scenariu \u00een care nota de plat\u0103 ajunge inevitabil tot la consumatorul rom\u00e2n.<\/strong><\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-333390\" src=\"https:\/\/gazetadecluj.ro\/wp-content\/uploads\/2026\/02\/nuscale-doicesti.webp\" alt width=\"770\" height=\"421\"><\/figure>\n<p>\u00cen timp ce proiectul SMR ridic\u0103 tot mai multe semne de \u00eentrebare, grupul E-INFRA al fra\u021bilor Mure\u0219an \u00ee\u0219i consolideaz\u0103 pozi\u021biile \u00een restul pie\u021bei energetice, de la achizi\u021bia Netcity de la UTI p\u00e2n\u0103 la inaugurarea parcului de baterii de la Flore\u0219ti \u0219i a centralei electrice pe gaz menit\u0103 s\u0103 acopere v\u00e2rfurile de consum din zona Clujului. Cu hidrocentralele de la M\u0103ri\u0219el \u0219i Colibi\u021ba blocate \u00een \u0219antiere care se \u00eentind pe ani, Clujul r\u0103m\u00e2ne \u00eentr-un deficit cronic de energie, iar Mure\u0219anii umplu elegant g\u0103urile cu propriile investi\u021bii \u2013 \u0219i, dac\u0103 le iese \u0219i Doice\u0219ti, ar urma s\u0103 joace \u00een liga mare a nuclearului, chiar dac\u0103 tehnologia pe care pariaz\u0103 este ast\u0103zi mai mult \u00een sala de judecat\u0103 dec\u00e2t \u00een teren.<\/p>\n<p><em><strong>surs\u0103:<a href=\"https:\/\/gazetadecluj.ro\/afacerea-nucleara-a-fratilor-muresan-lovita-de-scandalul-american-de-manipulare-nuscale-entra1\/\"> gazetadecluj.ro<\/a><\/strong><\/em><\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/solidnews.ro\/afacerea-nucleara-a-fratilor-muresan-lovita-de-scandalul-american-de-manipulare-nuscale-entra1\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/solidnews.ro\/wp-content\/uploads\/2026\/02\/afacere-nucleara-fratii-muresan.jpg.webp&#8221;] Probleme nucleare c\u00e2t casa \u00een curtea fra\u021bilor Mure\u0219an, prin\u0219i cu pariul lor pe tehnologia american\u0103 NuScale pentru reactorul SMR de la Doice\u0219ti exact c\u00e2nd compania-mam\u0103 din SUA e t\u00e2r\u00e2t\u0103 \u00eentr-un proces colectiv pentru manipularea bursei \u0219i \u00een\u0219elarea investitorilor. Americanii de la NuScale, cei care furnizeaz\u0103 tehnologia pentru proiectul RoPower Nuclear al Nuclearelectrica [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,97],"class_list":["post-1794416","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-solidnews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1794416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1794416"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1794416\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1794416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1794416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1794416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}