{"id":1785195,"date":"2026-02-19T10:44:57","date_gmt":"2026-02-19T07:44:57","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1785195"},"modified":"2026-02-19T10:44:57","modified_gmt":"2026-02-19T07:44:57","slug":"podul-muncii-se-reface-incepand-cu-aceasta-primavara","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1785195","title":{"rendered":"Podul Muncii: se (re)face \u00eencep\u00e2nd cu aceast\u0103 prim\u0103var\u0103"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/02\/podul-muncii.jpg&#8221;]<\/p>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-post-featured-image\"><a href=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/02\/podul-muncii.jpg\" data-caption><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"392\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/02\/podul-muncii-696x392.jpg\" alt title=\"podul muncii\"><\/a><\/div>\n<p><strong>Podul Iuliu Maniu (Muncii) va intra, la \u00eenceputul acestei prim\u0103veri, \u00eentr-un proces de reabilitare care include \u00eenlocuirea suprastructurii \u0219i consolidarea picioarelor podului. La final, timi\u0219orenii care circul\u0103 \u00eentre Calea \u0218agului \u0219i zona G\u0103rii vor beneficia de o infrastructur\u0103 nou\u0103 \u0219i sigur\u0103.<\/strong><\/p>\n<p>Procedura de contractare a lucr\u0103rilor s-a finalizat dup\u0103 o perioad\u0103 extins\u0103 de contesta\u021bii, iar municipalitatea a semnat contractul cu asocierea ZSN CARDINAL (lider), ARDELEAN COMPANY NORD VEST SRL \u0219i CML.RO SRL.<\/p>\n<p>\u00centr-o prim\u0103 etap\u0103, contractul a fost atribuit unei firme, a c\u0103rei ofert\u0103 a fost declarat\u0103 c\u00e2\u0219tig\u0103toare. Rezultatul a fost contestat la Consiliul Na\u021bional de Solu\u021bionare a Contesta\u021biilor (CNSC) de c\u0103tre o asociere a c\u0103rei ofert\u0103 a fost respins\u0103 de municipalitate pentru c\u0103 nu \u00eendeplinea condi\u021biile. CNSC a confirmat evaluarea realizat\u0103 de Prim\u0103ria Timi\u0219oara, iar legisla\u021bia oblig\u0103 autorit\u0103\u021bile s\u0103 semneze contractul, chiar dac\u0103 decizia CNSC a fost contestat\u0103 \u00een instan\u021b\u0103 \u0219i nu exist\u0103 o decizie definitiv\u0103.<\/p>\n<p>Ulterior, Curtea de Apel a admis contesta\u021bia, a anulat decizia CNSC \u0219i a dispus reluarea procedurii de evaluare. \u00cen urma acestei reanaliz\u0103ri, oferta asocierii a fost declarat\u0103 conform\u0103, iar \u00een baza acestui rezultat a fost semnat contractul actual.<\/p>\n<p>Investi\u021bia Prim\u0103riei Timi\u0219oara vizeaz\u0103 consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii cu o structur\u0103 mixt\u0103 o\u021bel-beton, cu p\u0103strarea a c\u00e2te dou\u0103 benzi pe sens, cu l\u0103\u021bimea de 3,50 metri fiecare. Totodat\u0103, trotuarele vor fi l\u0103rgite p\u00e2n\u0103 la 1,75 m, pentru a oferi mai mult spa\u021biu pietonilor, \u0219i vor fi amenajate piste pentru biciclete. Proiectul include \u0219i reabilitarea rampelor, refacerea sc\u0103rilor de acces cu elemente metalice, instalarea unui iluminat arhitectural modern, consolidarea malului Canalului Bega, precum \u0219i plantarea de arbori, pentru \u00eembun\u0103t\u0103\u021birea calit\u0103\u021bii aerului \u0219i a aspectului urban. Dup\u0103 finalizarea lucr\u0103rilor, municipalitatea va putea reintroduce circula\u021bia troleibuzelor pe pod.<\/p>\n<p>Valoarea total\u0103 a proiectului este de aproape 10 milioane de euro, din care aproximativ 7,4 milioane de euro reprezint\u0103 fonduri europene nerambursabile, prin Programul Regional Vest 2021 \u2013 2027, Interven\u021bia regional\u0103 4.1 Mobilitate Urban\u0103 Sustenabil\u0103. Lucr\u0103rile de reabilitare a Podului Iuliu Maniu se ridic\u0103 la peste 7,2 milioane de euro (TVA inclus) \u0219i sunt programate s\u0103 fie finalizate p\u00e2n\u0103 \u00een februarie 2027.<\/p>\n<\/div>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-post-featured-image\"><a href=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/02\/podul-muncii.jpg\" data-caption><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"392\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/02\/podul-muncii-696x392.jpg\" alt title=\"podul muncii\"><\/a><\/div>\n<p><strong>Podul Iuliu Maniu (Muncii) va intra, la \u00eenceputul acestei prim\u0103veri, \u00eentr-un proces de reabilitare care include \u00eenlocuirea suprastructurii \u0219i consolidarea picioarelor podului. La final, timi\u0219orenii care circul\u0103 \u00eentre Calea \u0218agului \u0219i zona G\u0103rii vor beneficia de o infrastructur\u0103 nou\u0103 \u0219i sigur\u0103.<\/strong><\/p>\n<p>Procedura de contractare a lucr\u0103rilor s-a finalizat dup\u0103 o perioad\u0103 extins\u0103 de contesta\u021bii, iar municipalitatea a semnat contractul cu asocierea ZSN CARDINAL (lider), ARDELEAN COMPANY NORD VEST SRL \u0219i CML.RO SRL.<\/p>\n<p>\u00centr-o prim\u0103 etap\u0103, contractul a fost atribuit unei firme, a c\u0103rei ofert\u0103 a fost declarat\u0103 c\u00e2\u0219tig\u0103toare. Rezultatul a fost contestat la Consiliul Na\u021bional de Solu\u021bionare a Contesta\u021biilor (CNSC) de c\u0103tre o asociere a c\u0103rei ofert\u0103 a fost respins\u0103 de municipalitate pentru c\u0103 nu \u00eendeplinea condi\u021biile. CNSC a confirmat evaluarea realizat\u0103 de Prim\u0103ria Timi\u0219oara, iar legisla\u021bia oblig\u0103 autorit\u0103\u021bile s\u0103 semneze contractul, chiar dac\u0103 decizia CNSC a fost contestat\u0103 \u00een instan\u021b\u0103 \u0219i nu exist\u0103 o decizie definitiv\u0103.<\/p>\n<p>Ulterior, Curtea de Apel a admis contesta\u021bia, a anulat decizia CNSC \u0219i a dispus reluarea procedurii de evaluare. \u00cen urma acestei reanaliz\u0103ri, oferta asocierii a fost declarat\u0103 conform\u0103, iar \u00een baza acestui rezultat a fost semnat contractul actual.<\/p>\n<p>Investi\u021bia Prim\u0103riei Timi\u0219oara vizeaz\u0103 consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii cu o structur\u0103 mixt\u0103 o\u021bel-beton, cu p\u0103strarea a c\u00e2te dou\u0103 benzi pe sens, cu l\u0103\u021bimea de 3,50 metri fiecare. Totodat\u0103, trotuarele vor fi l\u0103rgite p\u00e2n\u0103 la 1,75 m, pentru a oferi mai mult spa\u021biu pietonilor, \u0219i vor fi amenajate piste pentru biciclete. Proiectul include \u0219i reabilitarea rampelor, refacerea sc\u0103rilor de acces cu elemente metalice, instalarea unui iluminat arhitectural modern, consolidarea malului Canalului Bega, precum \u0219i plantarea de arbori, pentru \u00eembun\u0103t\u0103\u021birea calit\u0103\u021bii aerului \u0219i a aspectului urban. Dup\u0103 finalizarea lucr\u0103rilor, municipalitatea va putea reintroduce circula\u021bia troleibuzelor pe pod.<\/p>\n<p>Valoarea total\u0103 a proiectului este de aproape 10 milioane de euro, din care aproximativ 7,4 milioane de euro reprezint\u0103 fonduri europene nerambursabile, prin Programul Regional Vest 2021 \u2013 2027, Interven\u021bia regional\u0103 4.1 Mobilitate Urban\u0103 Sustenabil\u0103. Lucr\u0103rile de reabilitare a Podului Iuliu Maniu se ridic\u0103 la peste 7,2 milioane de euro (TVA inclus) \u0219i sunt programate s\u0103 fie finalizate p\u00e2n\u0103 \u00een februarie 2027.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/gazetadinvest.ro\/podul-muncii-se-reface-incepand-cu-aceasta-primavara\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/gazetadinvest.ro\/wp-content\/uploads\/2026\/02\/podul-muncii.jpg&#8221;] Podul Iuliu Maniu (Muncii) va intra, la \u00eenceputul acestei prim\u0103veri, \u00eentr-un proces de reabilitare care include \u00eenlocuirea suprastructurii \u0219i consolidarea picioarelor podului. La final, timi\u0219orenii care circul\u0103 \u00eentre Calea \u0218agului \u0219i zona G\u0103rii vor beneficia de o infrastructur\u0103 nou\u0103 \u0219i sigur\u0103. Procedura de contractare a lucr\u0103rilor s-a finalizat dup\u0103 o perioad\u0103 extins\u0103 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,203],"class_list":["post-1785195","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-gazetadinvest-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1785195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1785195"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1785195\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1785195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1785195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1785195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}