{"id":1784150,"date":"2026-02-21T11:03:00","date_gmt":"2026-02-21T08:03:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1784150"},"modified":"2026-02-21T11:03:00","modified_gmt":"2026-02-21T08:03:00","slug":"rock-solid-is-attempting-its-most-ambitious-project-ever-for-a-single-season","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1784150","title":{"rendered":"Rock Solid is attempting its ???most ambitious project ever for a single season???"},"content":{"rendered":"<div class=\"entry-content\">\n<div id=\"wp_content_article\" class=\"st_article_class\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"878\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20878'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2-1170x878.jpg\" alt class=\"wp-image-713480 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2-1170x878.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2-750x563.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2-768x576.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2-1536x1152.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2-600x450.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DJI_20260109135104_0069_D-2-2.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><figcaption class=\"wp-element-caption\">All photos courtesy Adam Munich, Rock Solid<\/figcaption><\/figure>\n<p>Rock Solid Trail Contracting is widely regarded as the largest trail building contractor in the world, with crews spanning the USA from coast to coast out of their dual headquarters in Bentonville, AR, and Copper Harbor, MI. While theyve completed innumerable massive trail projects over the years, theyre currently building Rock Solids most ambitious project ever for a single season, according to Adam Munich, Digital Marketing Coordinator for Rock Solid. Were planning on constructing anywhere from 25 to 30 miles of trail this season.???<\/p>\n<p>That 25-30 miles is not across the entire company, but in a single trail project over a 6-7 month build window. The project in question? The Albert and Bessie Kronkosky State Natural Area in Pipe Creek, Texas (or ABKSNA, for short).\u00a0<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"878\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20878'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2-1170x878.jpg\" alt class=\"wp-image-713491 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2-1170x878.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2-750x563.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2-768x576.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2-1536x1152.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2-600x450.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Backcountry-Flag-Line2.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><figcaption class=\"wp-element-caption\">Flagging one of the new backcountry trails.<\/figcaption><\/figure>\n<h2 class=\"wp-block-heading\" id=\"h-a-new-state-natural-area-in-texas-s-portfolio\">A new state natural area in Texass portfolio<\/h2>\n<p>ABKSNA represents a significant addition to Texas???s public lands portfolio. Located in Pipe Creeknorthwest of San Antonio in the heart of Texas Hill Countrythis protected area has transitioned from private ranch land to a conservation-focused state natural area. ???It used to be [the] Albert and Bessie Kronkosky ranch, and they donated it to Texas State Parks, and it???s currently under development,??? Munich explained.<\/p>\n<div style=\"min-height: 250px;padding: auto;margin-bottom: 20px\" class=\"singl-1490e92312f7d11ed7800225c4a5ea06 singl-content\" id=\"singl-1490e92312f7d11ed7800225c4a5ea06\"><\/div>\n<p>What sets ABKSNA apart from a traditional state park is its conservation mandate. ???So this is different because it???s a state natural area. It???s not a state park like <a href=\"https:\/\/www.singletracks.com\/mtb-trails\/palo-pinto-mountains-state-park-in-texas-is-opening-soon-with-16-miles-of-mtb-trails\/\">Palo Pinto Mountains State Park<\/a>, said Munich. However, both entities are managed by Texas Parks and Wildlife (TPWD).<\/p>\n<p>A state natural area is a piece of land with unique natural, cultural, and historical features, <a href=\"https:\/\/tpwd.texas.gov\/state-parks\/albert-bessie-kronkosky\">according to TPWD<\/a>. Protecting and managing these features is our highest priority.\u00a0<\/p>\n<p>The area protects several endangered species, including the golden-cheeked warbler, alligator lizard, sycamore leaf snowbell, bigtooth maple, Bernie bean, and Texas spring salamander. The landscape features springs, seeps, and waterfalls, along with big rolling hills characteristic of Texas Hill Country.<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713489\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-1170x780.jpg\" alt class=\"wp-image-713489 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-vs-topsoil.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713490\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-1170x780.jpg\" alt class=\"wp-image-713490 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0658-1.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye-.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713488\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--1170x780.jpg\" alt class=\"wp-image-713488 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye--600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Fisheye-.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<\/figure>\n<p><em>StaLock trail under construction.<\/em><\/p>\n<h2 class=\"wp-block-heading\" id=\"h-what-is-rock-solid-building-in-abksna\">What is Rock Solid building in ABKSNA?<\/h2>\n<p>Rock Solids crews are currently building three different types of trails in this expansive network: ADA-accessible trails, front country natural-surface trails, and back country natural-surface trails. The accessible trails are fully ADA-compliant and measure about four feet wide. Theyre built utilizing StaLok to harden the surface: a natural aggregate soil enhanced with polymer technology. StaLok is used widely across many TPWD parks. But of course, mountain bikers will be most interested in the front country and backcountry singletrack trails.<\/p>\n<div style=\"min-height: 250px;padding: auto;margin-bottom: 20px\" class=\"singl-83bec667a9c08f7aa73681b1b7533e18 singl-content\" id=\"singl-83bec667a9c08f7aa73681b1b7533e18\"><\/div>\n<p>But what exactly differentiates a frontcountry trail from a backcountry trail? Part of it???s going to be how wide it is, said Munich. Part of it???s going to be how close it is to the infrastructure, parking, roads, all that fun stuff. He noted that there will be significant differences between the two types of trail. The backcountry trails will measure about two feet wide, versus three feet for the frontcountry trail, and will provide a more traditional singletrack feel. Theres some really cool ridgeline, black diamond, backcountry trails as well, he added.<\/p>\n<p>At this time, its unclear precisely how much of the 25-30 miles of trails under construction will be open to mountain bikes. However, according to James Rice, TPWD Superintendent for ABKSNA, ???The majority of the trail systemis considered appropriate and safe to accommodate hikers and bikers.??? Unfortunately, e-bikers are out of luck: e-bikes are currently classified as motor vehicles by TPWD and will not be allowed on the trails.<\/p>\n<div style=\"min-height: 250px;padding: auto;margin-bottom: 20px\" class=\"singl-48160eb12ac913d8dd0e68b9c05a20d5 singl-content\" id=\"singl-48160eb12ac913d8dd0e68b9c05a20d5\"><\/div>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713486\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-1170x780.jpg\" alt class=\"wp-image-713486 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/sta-lok-handling.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713487\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-1170x780.jpg\" alt class=\"wp-image-713487 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/tight-corridor-for-accessibletrail.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713484\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-1170x780.jpg\" alt class=\"wp-image-713484 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/buggy-brigade.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" data-id=\"713485\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-1170x780.jpg\" alt class=\"wp-image-713485 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/DSC0509.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<\/figure>\n<h2 class=\"wp-block-heading\" id=\"h-the-scale-of-this-trail-build-is-absolutely-massive\">The scale of this trail build is absolutely massive<\/h2>\n<p>Building 25-30 miles of singletrack in about six months is a mammoth undertaking that very few companies could tackle. But as the biggest trail building company in the world, Rock Solid was able to allocate eight full crews to the ABKSNA project. Each crew typically consists of three people, including one machine operator\/foreman and one or more handworkers. After adding site superintendents and a lead foreman, Munich estimated that at least 27 people are currently working on the ABKSNA project concurrently.\u00a0\u00a0<\/p>\n<p>All of these crews are moving in different directions and working on different parts of the network, so organization and coordination of the various teams is of paramount importance. The site superintendent can communicate with the project manager and the office staff, and then the site superintendent can connect with either the crews or the lead foreman, and then the lead foreman can help manage everything, all the smaller stuff, Munich explained. So theres a clear structure in place that allows everyone to really have their specialty, whether it???s managing client expectations\/relations, making sure that everything on the site is going smoothly and that everyone has all the resources they need, or just telling people, Go here, do this thing, and this is how you do it. Everyone has their own spot and their own way to coordinate the chaos. I mean, eight machines moving forward at the same time. That???s a lot moving at once.<\/p>\n<div style=\"min-height: 250px;padding: auto;margin-bottom: 20px\" class=\"singl-ae4d0faf5cdbcdd6bce6959cf8b241df singl-content\" id=\"singl-ae4d0faf5cdbcdd6bce6959cf8b241df\"><\/div>\n<p>The coordination required for this project is more akin to a heavy construction site than to a couple of friends digging a new trail in the woods, especially on surfaced, ADA-accessible trails. For those more complex builds, one crew builds the base tread, another brings in the base rock, and a third crew surfaces it. The crews and project managers all have to communicate several times per day to keep the various moving parts and pieces aligned. It really takes a company of Rock Solids scale to pull this off.<\/p>\n<p>So just how big a company <em>is <\/em>Rock Solid? To put it in perspective, theyve assigned eight of their crews to ABKSNA, but they still have 10 additional crews working on various projects across the country. As big a project as ABKSNA might be, it still only requires about 44% of Rock Solids total workforce.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1170\" height=\"780\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201170%20780'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-1170x780.jpg\" alt class=\"wp-image-713483 lazy\" data-srcset=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-1170x780.jpg 1170w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-750x500.jpg 750w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-375x250.jpg 375w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-768x512.jpg 768w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-1536x1024.jpg 1536w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks-600x400.jpg 600w, https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/Rocks.jpg 2048w\" data-sizes=\"auto, (max-width: 1170px) 100vw, 1170px\"><\/a><\/figure>\n<h2 class=\"wp-block-heading\" id=\"h-how-does-this-compare-to-other-rock-solid-projects\">How does this compare to other Rock Solid projects?<\/h2>\n<p>While Munich confirmed that this is indeed Rock Solids most ambitious project, its not too crazy off from some of the projects theyve completed before. Theyre currently building about <a href=\"https:\/\/www.singletracks.com\/mtb-trails\/norman-ok-is-spending-1-million-to-transform-spaghetti-loops-into-bentonville-quality-trails\/\">20 miles in one shot in Norman, OK<\/a>. Rock Solid built the 80-mile network at Cuyuna Lakes and estimated that their largest build there in a single season was between 20 and 22 miles. Still, leveling up to 25-30 miles in just 6 months of building is a truly ambitious endeavor.<\/p>\n<div style=\"min-height: 250px;padding: auto;margin-bottom: 20px\" class=\"singl-f1ec2cae928de88faa793d10fc1cea90 singl-content\" id=\"singl-f1ec2cae928de88faa793d10fc1cea90\"><\/div>\n<p>One reason they can commit so much labor to a single project is the time of year. The crews really enjoy just working down in the warmer weather and experiencing the sunshine, said Munich. A lot of our crews are from up north, whether it???s Wisconsin, Minnesota, Michigan, so being able to get away from some of the snow and cold weather and just be able to enjoy being outside in the sun is a pretty cool aspect of working down there.???<\/p>\n<p>While the 60-70 degree temps are great during mid-winter, Rock Solid intends to have the build done before the mercury climbs too high. They aim to complete the full build by April or May, 2026.\u00a0<\/p>\n<p>Details about public access to the trails are still to be determined, but San Antonio mountain bikers should definitely add this new network to their list of spots to check out soon.<\/p>\n<p class=\"has-very-light-gray-background-color has-background\"><strong>Know about a new trail project we should cover?<\/strong> Whether you???re breaking ground on the next must-ride destination or putting the finishing touches on a neighborhood flow trail, we want to hear about it. Drop us a line at <a href=\"https:\/\/www.singletracks.com\/cdn-cgi\/l\/email-protection#8ee9fcebe9cefde7e0e9e2ebfafcefede5fda0ede1e3\"><span class=\"__cf_email__\" data-cfemail=\"81e6f3e4e6c1f2e8efe6ede4f5f3e0e2eaf2afe2eeec\">[email\u00a0protected]<\/span><\/a> with high-quality photos of your build, plus details like trail mileage, location, difficulty, and what makes it special. We???re always on the hunt for the next great trail story, and there???s a good chance your project could be featured in an upcoming article.<\/p>\n<div style=\"min-height: 250px;padding: auto;margin-bottom: 20px\" class=\"singl-4179ba2cef182d4359d348783dd37af9 singl-content\" id=\"singl-4179ba2cef182d4359d348783dd37af9\"><\/div>\n<p>\t\t\t\t\t\t\t&lt;!&#8211;<\/p>\n<hr \/>\n<h4>Related articles<\/h4>\n<p>\t\t\t\t\t\t\t&#8211;&gt;<\/p>\n<div style=\"height: 30px\">\u00a0<\/div>\n<p>\t\t\t\tjQuery(function() {<br \/>\n\t\t\t\t\tpostpayloads._4b0a8b57f78a88ff96a42bd1f34d2693 = {&#8220;ids&#8221;:&#8221;712092,710163,704512,695364&#8243;,&#8221;posts_per_page&#8221;:null,&#8221;offset&#8221;:0,&#8221;style&#8221;:&#8221;4up&#8221;};<br \/>\n\t\t\t\t\tpostcounter._4b0a8b57f78a88ff96a42bd1f34d2693 = {start: 0, step: 0, end: 0};<br \/>\n\t\t\t\t});<\/p>\n<div class=\"row\" style=\"background: #fff\">\n<div class=\"col-xs-6 col-md-3 st_archive_4up\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.singletracks.com\/mtb-trails\/palo-pinto-mountains-state-park-in-texas-is-opening-soon-with-16-miles-of-mtb-trails\/\"><img decoding=\"async\" class=\"lazy\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201%201'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/02\/switchback-hero-1-2-750x500.jpg\" alt=\"Aerial view of a winding dirt path surrounded by dense green trees, showcasing a mix of rocky terrain and lush foliage.\"><\/a><\/p>\n<div class=\"st_archive_tag\"><a href=\"https:\/\/www.singletracks.com\/bike-trails\/region\/texas\/\">Texas<\/a><\/div>\n<div class=\"st_archive_title\"><a href=\"https:\/\/www.singletracks.com\/mtb-trails\/palo-pinto-mountains-state-park-in-texas-is-opening-soon-with-16-miles-of-mtb-trails\/\">Palo Pinto Mountains State Park in Texas is opening soon with 16 miles of MTB trails<\/a><\/div>\n<\/p><\/div>\n<div class=\"col-xs-6 col-md-3 st_archive_4up\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.singletracks.com\/mtb-trails\/how-binkley-bike-park-transformed-sherman-tx-from-trail-desert-to-regional-mtb-destination\/\"><img decoding=\"async\" class=\"lazy\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201%201'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2026\/01\/image4-750x500.jpg\" alt=\"Aerial view of a bike trail and pump track in a park, featuring a winding dirt path with jumps and mounds, surrounded by grassy areas and trees. In the background, a concrete pump track with pink outlines can be seen, where several people are riding bikes.\"><\/a><\/p>\n<div class=\"st_archive_tag\"><a href=\"https:\/\/www.singletracks.com\/bike-trails\/region\/texas\/\">Texas<\/a><\/div>\n<div class=\"st_archive_title\"><a href=\"https:\/\/www.singletracks.com\/mtb-trails\/how-binkley-bike-park-transformed-sherman-tx-from-trail-desert-to-regional-mtb-destination\/\">How Binkley Bike Park transformed Sherman, TX, from trail desert to regional MTB destination<\/a><\/div>\n<\/p><\/div>\n<div class=\"clearfix visible-xs\"><\/div>\n<div class=\"col-xs-6 col-md-3 st_archive_4up\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.singletracks.com\/mtb-trails\/station-mountain-bike-park-is-shutting-down-after-less-than-2-years-in-operation\/\"><img decoding=\"async\" class=\"lazy\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201%201'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2025\/10\/IMG_4881-750x500.jpg\" alt=\"A mountain biker performing a jump over a dirt ramp, surrounded by greenery and a distant landscape. The rider is wearing a helmet and casual clothing, with trees and brush evident in the background under a clear blue sky.\"><\/a><\/p>\n<div class=\"st_archive_tag\"><a href=\"https:\/\/www.singletracks.com\/bike-trails\/region\/texas\/\">Texas<\/a><\/div>\n<div class=\"st_archive_title\"><a href=\"https:\/\/www.singletracks.com\/mtb-trails\/station-mountain-bike-park-is-shutting-down-after-less-than-2-years-in-operation\/\">Station Mountain Bike Park is shutting down after less than 2 years in operation<\/a><\/div>\n<\/p><\/div>\n<div class=\"col-xs-6 col-md-3 st_archive_4up\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.singletracks.com\/mtb-trails\/the-brand-new-cross-texas-trail-will-take-bikepackers-on-a-remote-rugged-and-romantic-1500-mile-adventure\/\"><img decoding=\"async\" class=\"lazy\" src=\"\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%201%201'%3E%3C\/svg%3E\" data-src=\"https:\/\/images.singletracks.com\/blog\/wp-content\/uploads\/2025\/05\/IMG_2572-Charlie-Gandy-West-Texas-Self-Portrait-Wide-1-750x500.jpg\" alt='A Van parked in a desert landscape with a Texas map displayed on the side. A person is sitting by the open door, surrounded by various items inside the van. A wooden sign in front reads \"xtexas.org.\" The scene is set under a clear blue sky.'><\/a><\/p>\n<div class=\"st_archive_tag\"><a href=\"https:\/\/www.singletracks.com\/bike-trails\/region\/texas\/\">Texas<\/a><\/div>\n<div class=\"st_archive_title\"><a href=\"https:\/\/www.singletracks.com\/mtb-trails\/the-brand-new-cross-texas-trail-will-take-bikepackers-on-a-remote-rugged-and-romantic-1500-mile-adventure\/\">The brand-new Cross Texas Trail will take bike riders on a &#8216;remote, rugged, and romantic&#8217; 1,500-mile adventure<\/a><\/div>\n<\/p><\/div>\n<div class=\"clearfix visible-xs\"><\/div>\n<\/div><\/div>\n<div class=\"clearfix\"><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>All photos courtesy Adam Munich, Rock Solid Rock Solid Trail Contracting is widely regarded as the largest trail building contractor in the world, with crews spanning the USA from coast to coast out of their dual headquarters in Bentonville, AR, and Copper Harbor, MI. While theyve completed innumerable massive trail projects over the years, theyre [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[226,274],"class_list":["post-1784150","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-crawlmanager","tag-singletracks-com"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1784150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1784150"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1784150\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1784150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1784150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1784150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}