{"id":1779884,"date":"2026-02-19T06:52:27","date_gmt":"2026-02-19T03:52:27","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1779884"},"modified":"2026-02-19T06:52:27","modified_gmt":"2026-02-19T03:52:27","slug":"noul-penitenciar-de-la-unguriu-prinde-contur-va-gazdui-900-de-detinuti","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1779884","title":{"rendered":"Noul penitenciar de la Unguriu prinde contur. Va g\u0103zdui 900 de de\u021binu\u021bi"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.buzau.net\/stiri-din-buzau\/wp-content\/uploads\/2026\/02\/noul-penitenciar-de-la-unguriu-prinde-contur.-va-gazdui-900-de-detinuti.jpg&#8221;]<\/p>\n<div id=\"mvp-content-main\" class=\"left relative\">\n<p>Lucr\u0103rile la viitorul penitenciar din localitatea buzoian\u0103 Unguriu avanseaz\u0103 \u00eentr-un ritm alert. Investi\u021bia a ajuns la un stadiu de execu\u021bie de 21%, \u00eenregistr\u00e2nd un avans considerabil fa\u021b\u0103 de aceea\u0219i perioad\u0103 a anului trecut, c\u00e2nd gradul de realizare era de 15%. Proiectul \u00eencepe s\u0103 prind\u0103 contur, marc\u00e2nd o etap\u0103 important\u0103 \u00een dezvoltarea infrastructurii penitenciare din Rom\u00e2nia.<\/p>\n<p>Potrivit datelor oficiale, structura de rezisten\u021b\u0103 este aproape integral finalizat\u0103 pentru pavilioanele func\u021bionale, care vor include spa\u021bii de cazare, birouri administrative, zone pentru activit\u0103\u021bi sportive \u0219i depozite. Aceast\u0103 etap\u0103 permite constructorilor s\u0103 se concentreze pe urm\u0103toarea faz\u0103 a proiectului, care vizeaz\u0103 lucr\u0103rile de arhitectur\u0103 \u0219i instala\u021bii, aflate momentan \u00een stadiu incipient. \u00cen paralel, au fost executate par\u021bial re\u021belele de canalizare \u0219i o parte dintre forajele de mare ad\u00e2ncime necesare pentru asigurarea aliment\u0103rii cu ap\u0103 a complexului.<\/p>\n<p>Viitoarea unitate de deten\u021bie, ce va fi ridicat\u0103 pe terenul a trei foste unit\u0103\u021bi militare, va func\u021biona \u00een regim semi-deschis \u0219i deschis \u0219i va avea o capacitate de 900 de locuri. Dintre acestea, 800 de locuri vor fi alocate regimului semi-deschis, iar 100 celui deschis, penitenciarul urm\u00e2nd s\u0103 fie administrat de Penitenciarul Foc\u0219ani. Proiectul include 12 pavilioane de deten\u021bie interioare \u0219i unul exterior, acesta din urm\u0103 fiind destinat persoanelor private de libertate aflate aproape de eliberare, pentru a le facilita reintegrarea social\u0103 \u0219i gestionarea autonom\u0103 a vie\u021bii.<\/p>\n<p>Investi\u021bia are deja un impact pozitiv major pentru comuna Unguriu, zeci de muncitori din comunitate \u0219i din \u00eemprejurimi fiind angaja\u021bi pe \u0219antier. Beneficiile economice vor fi \u0219i mai vizibile dup\u0103 finalizarea obiectivului, prin taxele \u0219i impozitele care vor ajunge la bugetul local, dar \u0219i prin crearea a sute de locuri de munc\u0103 pentru persoanele din zon\u0103, odat\u0103 cu darea \u00een folosin\u021b\u0103 a penitenciarului. Conform contractului, lucr\u0103rile la noua unitate de deten\u021bie ar trebui s\u0103 fie finalizate p\u00e2n\u0103 \u00een anul 2027.<\/p>\n<div class=\"heateor_sss_sharing_container heateor_sss_horizontal_sharing\" data-heateor-sss-href=\"https:\/\/www.buzau.net\/stiri-din-buzau\/noul-penitenciar-de-la-unguriu-prinde-contur-va-gazdui-900-de-detinuti\/\">\n<div class=\"heateor_sss_sharing_title\">DISTRIBUIE ACEST ARTICOL<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.buzau.net\/stiri-din-buzau\/noul-penitenciar-de-la-unguriu-prinde-contur-va-gazdui-900-de-detinuti\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.buzau.net\/stiri-din-buzau\/wp-content\/uploads\/2026\/02\/noul-penitenciar-de-la-unguriu-prinde-contur.-va-gazdui-900-de-detinuti.jpg&#8221;] Lucr\u0103rile la viitorul penitenciar din localitatea buzoian\u0103 Unguriu avanseaz\u0103 \u00eentr-un ritm alert. Investi\u021bia a ajuns la un stadiu de execu\u021bie de 21%, \u00eenregistr\u00e2nd un avans considerabil fa\u021b\u0103 de aceea\u0219i perioad\u0103 a anului trecut, c\u00e2nd gradul de realizare era de 15%. Proiectul \u00eencepe s\u0103 prind\u0103 contur, marc\u00e2nd o etap\u0103 important\u0103 \u00een dezvoltarea infrastructurii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[113,226],"class_list":["post-1779884","post","type-post","status-publish","format-standard","hentry","category-politics","tag-buzau-net","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1779884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1779884"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1779884\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1779884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1779884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1779884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}