{"id":1770183,"date":"2026-02-09T19:40:43","date_gmt":"2026-02-09T16:40:43","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1770183"},"modified":"2026-02-09T19:40:43","modified_gmt":"2026-02-09T16:40:43","slug":"primaria-bujoreni-pregateste-modernizarea-a-15-kilometri-de-drumuri-primarul-explica-de-ce-lucrarile-nu-pot-incepe-peste-noapte-2","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1770183","title":{"rendered":"Prim\u0103ria Bujoreni preg\u0103te\u0219te modernizarea a 15 kilometri de drumuri: primarul explic\u0103 de ce lucr\u0103rile nu pot \u00eencepe peste noapte"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2024\/03\/BUJORENI-2.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2016\" height=\"1512\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2024\/03\/BUJORENI-2.jpg\" class=\"img-responsive wp-post-image\" alt=\"Prim\u0103ria Bujoreni preg\u0103te\u0219te modernizarea a 15 kilometri de drumuri: primarul explic\u0103 de ce lucr\u0103rile nu pot \u00eencepe peste noapte\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/02\/09\/primaria-bujoreni-pregateste-modernizarea-a-15-kilometri-de-drumuri-primarul-explica-de-ce-lucrarile-nu-pot-incepe-peste-noapte\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2026-02-09T21:40:43+02:00\">9 februarie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/cele-mai-noi-stiri-despre-bujoreni-o-comuna-olteniana-cu-traditii-autentice-si-agricultura-prospera\/\" rel=\"category tag\">Bujoreni<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>\u00cen Bujoreni, anul acesta \u00eencepe una dintre cele mai ample moderniz\u0103ri de drumuri locale din ultimii ani. Aproape 15 kilometri de str\u0103zi sunt prin\u0219i \u00een proiecte aprobate \u0219i finan\u021bate, aflate acum \u00een fazele legale de evaluare \u0219i achizi\u021bie. Primarul Gheorghe G\u00eengu explic\u0103 faptul c\u0103 lucr\u0103rile nu pot porni \u00eenainte de finalizarea procedurilor, tocmai pentru a evita riscuri legate de finan\u021bare \u0219i pentru a asigura interven\u021bii corecte, durabile \u0219i f\u0103cute dup\u0103 reguli clare.<\/p>\n<p>\u00a0<\/p>\n<p>\u201dAnul acesta d\u0103m startul moderniz\u0103rii a circa 15 kilometri de drumuri locale. \u00cen ultimele zile, \u00een spa\u021biul public au ap\u0103rut\u00a0 post\u0103ri \u0219i comentarii referitoare la starea unor drumuri din comuna Bujoreni. Doresc s\u0103 informez cet\u0103\u021benii cu claritate, pentru a face diferen\u021ba dintre realitate \u0219i specula\u021bii.Majoritatea str\u0103zilor despre care se discut\u0103 fac parte din proiecte de modernizare deja aprobate \u0219i finan\u021bate, care se afl\u0103 \u00een acest moment \u00een procedur\u0103 de evaluare tehnic\u0103 \u0219i financiar\u0103 a ofertelor de c\u0103tre cei care au depus oferte la aceste licita\u021bii. Conform legisla\u021biei \u00een vigoare, nu se pot efectua cheltuieli suplimentare pe aceste drumuri \u00eenainte de finalizarea procedurilor de achizi\u021bie, pentru a evita dubla finan\u021bare. Aceasta nu este o problem\u0103, ci o prevedere legal\u0103 menit\u0103 s\u0103 protejeze fondurile publice \u0219i s\u0103 garanteze lucr\u0103ri corecte \u0219i transparente.<\/p>\n<p>Anul acesta, comuna Bujoreni va demara dou\u0103 proiecte majore de modernizare a infrastructurii rutiere, cu o valoare total\u0103 estimat\u0103 la peste 5 milioane de euro:<\/p>\n<ol>\n<li>Proiect finan\u021bat prin PNDR \u2013 aproximativ 1,4 milioane de euro, pentru modernizarea a 3,45 km de str\u0103zi:<\/li>\n<\/ol>\n<p>\u2013 Veseliei (417 m)<\/p>\n<p>\u2013 Salc\u00e2milor (330 m)<\/p>\n<p>\u2013 P\u0103ducelului (168 m)<\/p>\n<p>\u2013 Liliacului (231 m)<\/p>\n<p>\u2013 Principal\u0103 \u2013 Bogd\u0103ne\u0219ti<\/p>\n<p>\u2013 DC 164 (742 m)<\/p>\n<p>\u2013 Armoniei (195 m)<\/p>\n<p>\u2013 Muzeului (1.368 m)<\/p>\n<p>Proiectul include construirea a 4 pode\u021be, amenajarea zonelor de acces pentru peste 40 de propriet\u0103\u021bi \u0219i realizarea unui sistem de colectare \u0219i evacuare a apelor pluviale.<\/p>\n<ol start=\"2\">\n<li>Proiect prin PNI \u201eAnghel Saligny\u201d \u2013 aproape 4 milioane de euro, pentru modernizarea a 19 str\u0103zi (11,45 km):<\/li>\n<\/ol>\n<p>\u2013 Abatorului \u2013 satul Bujoreni<\/p>\n<p>\u2013 Morii \u2013 Malu V\u00e2rtop<\/p>\n<p>\u2013 Principal\u0103 \u2013 Bogd\u0103ne\u0219ti<\/p>\n<p>\u2013 Doctorului \u2013 Lunca<\/p>\n<p>\u2013 Vatra Satului \u2013 Gura V\u0103ii<\/p>\n<p>\u2013 Tineretului \u2013 Gura V\u0103ii<\/p>\n<p>\u2013 Monumentului<\/p>\n<p>\u2013 Trandafirilor<\/p>\n<p>\u2013 C\u00e2mpului<\/p>\n<p>\u2013 Barajului<\/p>\n<p>\u2013 Canalului<\/p>\n<p>\u2013 Dumbravei<\/p>\n<p>\u2013 Busuiocului<\/p>\n<p>\u2013 Spicului<\/p>\n<p>\u2013 C\u0103minului<\/p>\n<p>\u2013 Piscinei<\/p>\n<p>\u2013 Castanilor 1 \u0219i 2 \u2013 Olteni<\/p>\n<p>\u2013 Barajului \u2013 Malu Alb<\/p>\n<p>\u2013 Speran\u021bei \u2013 Malu Alb<\/p>\n<p>Procedurile de achizi\u021bie pentru ambele proiecte au \u00eenceput \u00een decembrie 2025, iar termenul limit\u0103 de depunere a ofertelor a fost \u00een ianuarie 2026. Competi\u021bia dintre constructori este intens\u0103, ceea ce garanteaz\u0103 calitatea lucr\u0103rilor \u0219i respectarea termenelor.<\/p>\n<p>Facem apel la cet\u0103\u021beni s\u0103 se informeze din surse oficiale \u0219i s\u0103 priveasc\u0103 cu \u00eencredere aceste proiecte care vor transforma infrastructura local\u0103. Comunitatea noastr\u0103 merit\u0103 adev\u0103rul, nu specula\u021biile sau dezinform\u0103rile care circul\u0103 \u00een spa\u021biul public\u201d, \u00a0<strong>a transmis primarului\u00a0 comunei Bujoreni, Gheorghe G\u00eengu.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>\u00cen Bujoreni, anul acesta \u00eencepe una dintre cele mai ample moderniz\u0103ri de drumuri locale din ultimii ani. Aproape 15 kilometri de str\u0103zi sunt prin\u0219i \u00een proiecte aprobate \u0219i finan\u021bate, aflate acum \u00een fazele legale de evaluare \u0219i achizi\u021bie. Primarul Gheorghe G\u00eengu explic\u0103 faptul c\u0103 lucr\u0103rile nu pot porni \u00eenainte de finalizarea procedurilor, tocmai pentru a evita riscuri legate de finan\u021bare \u0219i pentru a asigura interven\u021bii corecte, durabile \u0219i f\u0103cute dup\u0103 reguli clare.<\/p>\n<p>\u00a0<\/p>\n<p>\u201dAnul acesta d\u0103m startul moderniz\u0103rii a circa 15 kilometri de drumuri locale. \u00cen ultimele zile, \u00een spa\u021biul public au ap\u0103rut\u00a0 post\u0103ri \u0219i comentarii referitoare la starea unor drumuri din comuna Bujoreni. Doresc s\u0103 informez cet\u0103\u021benii cu claritate, pentru a face diferen\u021ba dintre realitate \u0219i specula\u021bii.Majoritatea str\u0103zilor despre care se discut\u0103 fac parte din proiecte de modernizare deja aprobate \u0219i finan\u021bate, care se afl\u0103 \u00een acest moment \u00een procedur\u0103 de evaluare tehnic\u0103 \u0219i financiar\u0103 a ofertelor de c\u0103tre cei care au depus oferte la aceste licita\u021bii. Conform legisla\u021biei \u00een vigoare, nu se pot efectua cheltuieli suplimentare pe aceste drumuri \u00eenainte de finalizarea procedurilor de achizi\u021bie, pentru a evita dubla finan\u021bare. Aceasta nu este o problem\u0103, ci o prevedere legal\u0103 menit\u0103 s\u0103 protejeze fondurile publice \u0219i s\u0103 garanteze lucr\u0103ri corecte \u0219i transparente.<\/p>\n<p>Anul acesta, comuna Bujoreni va demara dou\u0103 proiecte majore de modernizare a infrastructurii rutiere, cu o valoare total\u0103 estimat\u0103 la peste 5 milioane de euro:<\/p>\n<ol>\n<li>Proiect finan\u021bat prin PNDR \u2013 aproximativ 1,4 milioane de euro, pentru modernizarea a 3,45 km de str\u0103zi:<\/li>\n<\/ol>\n<p>\u2013 Veseliei (417 m)<\/p>\n<p>\u2013 Salc\u00e2milor (330 m)<\/p>\n<p>\u2013 P\u0103ducelului (168 m)<\/p>\n<p>\u2013 Liliacului (231 m)<\/p>\n<p>\u2013 Principal\u0103 \u2013 Bogd\u0103ne\u0219ti<\/p>\n<p>\u2013 DC 164 (742 m)<\/p>\n<p>\u2013 Armoniei (195 m)<\/p>\n<p>\u2013 Muzeului (1.368 m)<\/p>\n<p>Proiectul include construirea a 4 pode\u021be, amenajarea zonelor de acces pentru peste 40 de propriet\u0103\u021bi \u0219i realizarea unui sistem de colectare \u0219i evacuare a apelor pluviale.<\/p>\n<ol start=\"2\">\n<li>Proiect prin PNI \u201eAnghel Saligny\u201d \u2013 aproape 4 milioane de euro, pentru modernizarea a 19 str\u0103zi (11,45 km):<\/li>\n<\/ol>\n<p>\u2013 Abatorului \u2013 satul Bujoreni<\/p>\n<p>\u2013 Morii \u2013 Malu V\u00e2rtop<\/p>\n<p>\u2013 Principal\u0103 \u2013 Bogd\u0103ne\u0219ti<\/p>\n<p>\u2013 Doctorului \u2013 Lunca<\/p>\n<p>\u2013 Vatra Satului \u2013 Gura V\u0103ii<\/p>\n<p>\u2013 Tineretului \u2013 Gura V\u0103ii<\/p>\n<p>\u2013 Monumentului<\/p>\n<p>\u2013 Trandafirilor<\/p>\n<p>\u2013 C\u00e2mpului<\/p>\n<p>\u2013 Barajului<\/p>\n<p>\u2013 Canalului<\/p>\n<p>\u2013 Dumbravei<\/p>\n<p>\u2013 Busuiocului<\/p>\n<p>\u2013 Spicului<\/p>\n<p>\u2013 C\u0103minului<\/p>\n<p>\u2013 Piscinei<\/p>\n<p>\u2013 Castanilor 1 \u0219i 2 \u2013 Olteni<\/p>\n<p>\u2013 Barajului \u2013 Malu Alb<\/p>\n<p>\u2013 Speran\u021bei \u2013 Malu Alb<\/p>\n<p>Procedurile de achizi\u021bie pentru ambele proiecte au \u00eenceput \u00een decembrie 2025, iar termenul limit\u0103 de depunere a ofertelor a fost \u00een ianuarie 2026. Competi\u021bia dintre constructori este intens\u0103, ceea ce garanteaz\u0103 calitatea lucr\u0103rilor \u0219i respectarea termenelor.<\/p>\n<p>Facem apel la cet\u0103\u021beni s\u0103 se informeze din surse oficiale \u0219i s\u0103 priveasc\u0103 cu \u00eencredere aceste proiecte care vor transforma infrastructura local\u0103. Comunitatea noastr\u0103 merit\u0103 adev\u0103rul, nu specula\u021biile sau dezinform\u0103rile care circul\u0103 \u00een spa\u021biul public\u201d, \u00a0<strong>a transmis primarului\u00a0 comunei Bujoreni, Gheorghe G\u00eengu.<\/strong><\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>\u00cen Bujoreni, anul acesta \u00eencepe una dintre cele mai ample moderniz\u0103ri de drumuri locale din ultimii ani. Aproape 15 kilometri de str\u0103zi sunt prin\u0219i \u00een proiecte aprobate \u0219i finan\u021bate, aflate acum \u00een fazele legale de evaluare \u0219i achizi\u021bie. Primarul Gheorghe G\u00eengu explic\u0103 faptul c\u0103 lucr\u0103rile nu pot porni \u00eenainte de finalizarea procedurilor, tocmai pentru a evita riscuri legate de finan\u021bare \u0219i pentru a asigura interven\u021bii corecte, durabile \u0219i f\u0103cute dup\u0103 reguli clare.<\/p>\n<p>\u00a0<\/p>\n<p>\u201dAnul acesta d\u0103m startul moderniz\u0103rii a circa 15 kilometri de drumuri locale. \u00cen ultimele zile, \u00een spa\u021biul public au ap\u0103rut\u00a0 post\u0103ri \u0219i comentarii referitoare la starea unor drumuri din comuna Bujoreni. Doresc s\u0103 informez cet\u0103\u021benii cu claritate, pentru a face diferen\u021ba dintre realitate \u0219i specula\u021bii.Majoritatea str\u0103zilor despre care se discut\u0103 fac parte din proiecte de modernizare deja aprobate \u0219i finan\u021bate, care se afl\u0103 \u00een acest moment \u00een procedur\u0103 de evaluare tehnic\u0103 \u0219i financiar\u0103 a ofertelor de c\u0103tre cei care au depus oferte la aceste licita\u021bii. Conform legisla\u021biei \u00een vigoare, nu se pot efectua cheltuieli suplimentare pe aceste drumuri \u00eenainte de finalizarea procedurilor de achizi\u021bie, pentru a evita dubla finan\u021bare. Aceasta nu este o problem\u0103, ci o prevedere legal\u0103 menit\u0103 s\u0103 protejeze fondurile publice \u0219i s\u0103 garanteze lucr\u0103ri corecte \u0219i transparente.<\/p>\n<p>Anul acesta, comuna Bujoreni va demara dou\u0103 proiecte majore de modernizare a infrastructurii rutiere, cu o valoare total\u0103 estimat\u0103 la peste 5 milioane de euro:<\/p>\n<ol>\n<li>Proiect finan\u021bat prin PNDR \u2013 aproximativ 1,4 milioane de euro, pentru modernizarea a 3,45 km de str\u0103zi:<\/li>\n<\/ol>\n<p>\u2013 Veseliei (417 m)<\/p>\n<p>\u2013 Salc\u00e2milor (330 m)<\/p>\n<p>\u2013 P\u0103ducelului (168 m)<\/p>\n<p>\u2013 Liliacului (231 m)<\/p>\n<p>\u2013 Principal\u0103 \u2013 Bogd\u0103ne\u0219ti<\/p>\n<p>\u2013 DC 164 (742 m)<\/p>\n<p>\u2013 Armoniei (195 m)<\/p>\n<p>\u2013 Muzeului (1.368 m)<\/p>\n<p>Proiectul include construirea a 4 pode\u021be, amenajarea zonelor de acces pentru peste 40 de propriet\u0103\u021bi \u0219i realizarea unui sistem de colectare \u0219i evacuare a apelor pluviale.<\/p>\n<ol start=\"2\">\n<li>Proiect prin PNI \u201eAnghel Saligny\u201d \u2013 aproape 4 milioane de euro, pentru modernizarea a 19 str\u0103zi (11,45 km):<\/li>\n<\/ol>\n<p>\u2013 Abatorului \u2013 satul Bujoreni<\/p>\n<p>\u2013 Morii \u2013 Malu V\u00e2rtop<\/p>\n<p>\u2013 Principal\u0103 \u2013 Bogd\u0103ne\u0219ti<\/p>\n<p>\u2013 Doctorului \u2013 Lunca<\/p>\n<p>\u2013 Vatra Satului \u2013 Gura V\u0103ii<\/p>\n<p>\u2013 Tineretului \u2013 Gura V\u0103ii<\/p>\n<p>\u2013 Monumentului<\/p>\n<p>\u2013 Trandafirilor<\/p>\n<p>\u2013 C\u00e2mpului<\/p>\n<p>\u2013 Barajului<\/p>\n<p>\u2013 Canalului<\/p>\n<p>\u2013 Dumbravei<\/p>\n<p>\u2013 Busuiocului<\/p>\n<p>\u2013 Spicului<\/p>\n<p>\u2013 C\u0103minului<\/p>\n<p>\u2013 Piscinei<\/p>\n<p>\u2013 Castanilor 1 \u0219i 2 \u2013 Olteni<\/p>\n<p>\u2013 Barajului \u2013 Malu Alb<\/p>\n<p>\u2013 Speran\u021bei \u2013 Malu Alb<\/p>\n<p>Procedurile de achizi\u021bie pentru ambele proiecte au \u00eenceput \u00een decembrie 2025, iar termenul limit\u0103 de depunere a ofertelor a fost \u00een ianuarie 2026. Competi\u021bia dintre constructori este intens\u0103, ceea ce garanteaz\u0103 calitatea lucr\u0103rilor \u0219i respectarea termenelor.<\/p>\n<p>Facem apel la cet\u0103\u021beni s\u0103 se informeze din surse oficiale \u0219i s\u0103 priveasc\u0103 cu \u00eencredere aceste proiecte care vor transforma infrastructura local\u0103. Comunitatea noastr\u0103 merit\u0103 adev\u0103rul, nu specula\u021biile sau dezinform\u0103rile care circul\u0103 \u00een spa\u021biul public\u201d, \u00a0<strong>a transmis primarului\u00a0 comunei Bujoreni, Gheorghe G\u00eengu.<\/strong><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/02\/09\/primaria-bujoreni-pregateste-modernizarea-a-15-kilometri-de-drumuri-primarul-explica-de-ce-lucrarile-nu-pot-incepe-peste-noapte\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2024\/03\/BUJORENI-2.jpg&#8221;] 9 februarie 2026Claudia SchiopuAdministra\u0163ieBujoreni \u00cen Bujoreni, anul acesta \u00eencepe una dintre cele mai ample moderniz\u0103ri de drumuri locale din ultimii ani. Aproape 15 kilometri de str\u0103zi sunt prin\u0219i \u00een proiecte aprobate \u0219i finan\u021bate, aflate acum \u00een fazele legale de evaluare \u0219i achizi\u021bie. Primarul Gheorghe G\u00eengu explic\u0103 faptul c\u0103 lucr\u0103rile nu pot porni [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-1770183","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1770183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1770183"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1770183\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1770183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1770183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1770183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}