{"id":1567166,"date":"2025-04-23T11:42:40","date_gmt":"2025-04-23T08:42:40","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1567166"},"modified":"2025-04-23T11:42:40","modified_gmt":"2025-04-23T08:42:40","slug":"alfred-simonis-anunta-un-pas-important-in-licitatia-pentru-stadionul-dan-paltinisanu","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1567166","title":{"rendered":"Alfred Simonis anun\u021b\u0103 un pas important \u00een licita\u021bia pentru Stadionul \u201dDan P\u0103ltini\u0219anu\u201d!"},"content":{"rendered":"<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-post-featured-image\">\n<figure><a href=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/simonis-8.jpg\" data-caption=\"stadion nou\"><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"381\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/simonis-696x381-2.jpg\" title=\"simonis\"><\/a><figcaption class=\"wp-caption-text\">stadion nou<\/figcaption><\/figure>\n<\/div>\n<p><strong>S\u0103pt\u0103m\u00e2na Luminat\u0103 aduce o veste bun\u0103 pentru iubitorii fotbalului. Licita\u021bia de proiectare \u0219i execu\u021bie a viitorului Stadion \u201dDan P\u0103ltini\u0219anu\u201d are un constructor desemnat, dar, deocamdat\u0103, nu se spune oficial nici asocierea de firme, nici suma, deoarece mai este timp pentru contesta\u021bii.<\/strong><\/p>\n<p>Arena se va ridica cu bani de la Compania Na\u021bional\u0103 de Investi\u021bii pe locul stadionului ce acum se demoleaz\u0103. Au fost depuse \u0219apte oferte, asocieri ce totalizeaz\u0103 84 de firme. \u201d<em>Stadionul \u00abDan P\u0103ltini\u0219anu\u00bb are constructor desemnat! Procedurile pentru stabilirea c\u00e2\u0219tig\u0103torului licita\u021biei de proiectare \u0219i construc\u021bie a stadionului Dan P\u0103ltin\u0219anu s-au \u00eencheiat \u0219i, dac\u0103 nu vor exista contesta\u021bii, compania se poate apuca de treab\u0103. Proiectarea, conform caietului de sarcini, va dura 8 luni, iar construirea efectiv\u0103 a celei mai moderne arene din Rom\u00e2nia este estimat\u0103 la 24 de luni\u201d<\/em>, anun\u021b\u0103 vicepre\u0219edintele CJT, Alfred Simonis, f\u0103r\u0103 a nominaliza oferta c\u00e2\u0219tig\u0103toare.<\/p>\n<p>O eventual\u0103 contesta\u021bie ar mai \u00eent\u00e2rzia procedura cu luni de zile, \u00een func\u021bie de respingere saa acceptare, ceea ce ar \u00eensemna reluarea procedurii! \u201d<em>Alfred Simonis, pre\u0219edintele Consiliului Jude\u021bean Timi\u0219 \u2013 beneficiar al construc\u021biei stadionului \u0219i cofinan\u021bator al investi\u021biei \u2013 a anun\u021bat finalizarea evalu\u0103rii ofertelor depuse. Urmeaz\u0103 publicarea raportului procedurii, iar dac\u0103 \u00een termen de 10 zile de la publicare nu sunt depuse contesta\u021bii, se va semna contractul cu constructorul. Ulterior, va fi publicat anun\u021bul de atribuire, care va include numele constructorului \u0219i valoarea contractului atribuit\u201d<\/em>, informeaz\u0103 purt\u0103toare de cuv\u00e2nt a CJT, Loredana Lungu.<\/p>\n<p>Din februarie, arena actual\u0103 se demoleaz\u0103, iar dorin\u021ba e ca proiectarea s\u0103 se suprapun\u0103 cu acest proces, \u00eenceput \u00een februarie. Simonis spune \u00eens\u0103 c\u0103 vechiul stadion ar putea deveni istorie mai repede de luna octombrie. \u201d<em>Situa\u021bia la zi a procesului de demolare a legendarului stadion timi\u0219orean se prezint\u0103 bine pentru c\u0103 lucr\u0103rile avanseaz\u0103 \u00eentr-un ritm bun, estim\u0103rile societ\u0103\u021bii care efectueaz\u0103 demolarea fiind c\u0103 punerea la p\u0103m\u00e2nt a arenei va fi finalizat\u0103 \u00eenainte de termenul prev\u0103zut \u00een contract, adic\u0103 8 luni. Facem totul pentru Timi\u0219!\u201d<\/em>, a mai spus Simonis.<\/p>\n<p>Viitorul stadion va avea 32.000 de locuri, tribune acoperite \u0219i o alt\u0103 form\u0103, nu oval\u0103. Teoretic, f\u0103r\u0103 vreo reluare a licita\u021biei, ar urma s\u0103 fie gata \u00een 2027, dac\u0103 nu vor ap\u0103rea blocaje economice.<\/p>\n<\/div>\n<div class=\"td-post-content tagdiv-type\">\n<div class=\"td-post-featured-image\">\n<figure><a href=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/simonis-8.jpg\" data-caption=\"stadion nou\"><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"381\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/simonis-696x381-2.jpg\" title=\"simonis\"><\/a><figcaption class=\"wp-caption-text\">stadion nou<\/figcaption><\/figure>\n<\/div>\n<p><strong>S\u0103pt\u0103m\u00e2na Luminat\u0103 aduce o veste bun\u0103 pentru iubitorii fotbalului. Licita\u021bia de proiectare \u0219i execu\u021bie a viitorului Stadion \u201dDan P\u0103ltini\u0219anu\u201d are un constructor desemnat, dar, deocamdat\u0103, nu se spune oficial nici asocierea de firme, nici suma, deoarece mai este timp pentru contesta\u021bii.<\/strong><\/p>\n<p>Arena se va ridica cu bani de la Compania Na\u021bional\u0103 de Investi\u021bii pe locul stadionului ce acum se demoleaz\u0103. Au fost depuse \u0219apte oferte, asocieri ce totalizeaz\u0103 84 de firme. \u201d<em>Stadionul \u00abDan P\u0103ltini\u0219anu\u00bb are constructor desemnat! Procedurile pentru stabilirea c\u00e2\u0219tig\u0103torului licita\u021biei de proiectare \u0219i construc\u021bie a stadionului Dan P\u0103ltin\u0219anu s-au \u00eencheiat \u0219i, dac\u0103 nu vor exista contesta\u021bii, compania se poate apuca de treab\u0103. Proiectarea, conform caietului de sarcini, va dura 8 luni, iar construirea efectiv\u0103 a celei mai moderne arene din Rom\u00e2nia este estimat\u0103 la 24 de luni\u201d<\/em>, anun\u021b\u0103 vicepre\u0219edintele CJT, Alfred Simonis, f\u0103r\u0103 a nominaliza oferta c\u00e2\u0219tig\u0103toare.<\/p>\n<p>O eventual\u0103 contesta\u021bie ar mai \u00eent\u00e2rzia procedura cu luni de zile, \u00een func\u021bie de respingere saa acceptare, ceea ce ar \u00eensemna reluarea procedurii! \u201d<em>Alfred Simonis, pre\u0219edintele Consiliului Jude\u021bean Timi\u0219 \u2013 beneficiar al construc\u021biei stadionului \u0219i cofinan\u021bator al investi\u021biei \u2013 a anun\u021bat finalizarea evalu\u0103rii ofertelor depuse. Urmeaz\u0103 publicarea raportului procedurii, iar dac\u0103 \u00een termen de 10 zile de la publicare nu sunt depuse contesta\u021bii, se va semna contractul cu constructorul. Ulterior, va fi publicat anun\u021bul de atribuire, care va include numele constructorului \u0219i valoarea contractului atribuit\u201d<\/em>, informeaz\u0103 purt\u0103toare de cuv\u00e2nt a CJT, Loredana Lungu.<\/p>\n<p>Din februarie, arena actual\u0103 se demoleaz\u0103, iar dorin\u021ba e ca proiectarea s\u0103 se suprapun\u0103 cu acest proces, \u00eenceput \u00een februarie. Simonis spune \u00eens\u0103 c\u0103 vechiul stadion ar putea deveni istorie mai repede de luna octombrie. \u201d<em>Situa\u021bia la zi a procesului de demolare a legendarului stadion timi\u0219orean se prezint\u0103 bine pentru c\u0103 lucr\u0103rile avanseaz\u0103 \u00eentr-un ritm bun, estim\u0103rile societ\u0103\u021bii care efectueaz\u0103 demolarea fiind c\u0103 punerea la p\u0103m\u00e2nt a arenei va fi finalizat\u0103 \u00eenainte de termenul prev\u0103zut \u00een contract, adic\u0103 8 luni. Facem totul pentru Timi\u0219!\u201d<\/em>, a mai spus Simonis.<\/p>\n<p>Viitorul stadion va avea 32.000 de locuri, tribune acoperite \u0219i o alt\u0103 form\u0103, nu oval\u0103. Teoretic, f\u0103r\u0103 vreo reluare a licita\u021biei, ar urma s\u0103 fie gata \u00een 2027, dac\u0103 nu vor ap\u0103rea blocaje economice.<\/p>\n<\/div>\n<p> Source URL: https:\/\/gazetadinvest.ro\/alfred-simonis-anunta-un-pas-important-in-licitatia-pentru-stadionul-dan-paltinisanu\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>stadion nou S\u0103pt\u0103m\u00e2na Luminat\u0103 aduce o veste bun\u0103 pentru iubitorii fotbalului. Licita\u021bia de proiectare \u0219i execu\u021bie a viitorului Stadion \u201dDan P\u0103ltini\u0219anu\u201d are un constructor desemnat, dar, deocamdat\u0103, nu se spune oficial nici asocierea de firme, nici suma, deoarece mai este timp pentru contesta\u021bii. Arena se va ridica cu bani de la Compania Na\u021bional\u0103 de Investi\u021bii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1567167,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[203],"class_list":["post-1567166","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-gazetadinvest-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1567166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1567166"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1567166\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/1567167"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1567166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1567166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1567166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}