{"id":1559509,"date":"2023-12-05T17:53:31","date_gmt":"2023-12-05T14:53:31","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1559509"},"modified":"2023-12-05T17:53:31","modified_gmt":"2023-12-05T14:53:31","slug":"progresul-lucrarilor-aquatim-timisoara-nord-lot1-94-timisoara-sud-lot-2-77","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1559509","title":{"rendered":"Progresul lucr\u0103rilor Aquatim: Timi\u0219oara Nord Lot1 \u2013 94 %. Timi\u0219oara Sud. Lot 2 \u2013 77 %"},"content":{"rendered":"<div class=\"td-post-content td-pb-padding-side\">\n<p><a href=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/aquatim-lucrari-9.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-285498\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/aquatim-lucrari-9.jpg\" width=\"650\" height=\"488\" title=\"aquatim-lucrari-9\"><\/a>Pentru c\u0103 ne dore\u0219te ca locuitorii Timi\u0219oarei s\u0103 fie informa\u021bi cu privire la progresul lucr\u0103rilor realizate din fonduri europene, Aquatim ofer\u0103 \u0219i \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103 detalii despre fiecare strad\u0103 pe care desf\u0103\u0219oar\u0103 lucr\u0103ri.<\/p>\n<p>S\u0103pt\u0103m\u00e2na 04 \u2013 08.12.2023<\/p>\n<p>TIMISOARA NORD<\/p>\n<p>LOT 1<\/p>\n<p>Progres: 94 %<\/p>\n<p>Calea Torontalului: se continu\u0103 execu\u021bia lucr\u0103rilor de refacere a\u00a0 trotuarului;<\/p>\n<p>Str. G\u0103rii:\u00a0 se execut\u0103 lucr\u0103ri de refacere a sistemului rutier;<\/p>\n<p>Str. Balta Verde:\u00a0 se\u00a0 continu\u0103 execu\u021bia lucr\u0103rii de reabilitarea a conductelor de canalizare; se continua lucr\u0103rile de refacere a sistemului rutier;<\/p>\n<p>Str. B.P. Ha\u0219deu: \u00a0de mar\u021bi 05.12.2023 p\u00e2n\u0103 \u00een 07.12.2023, se execut\u0103 leg\u0103tura dintre conducta nou\u0103 DN800 \u0219i cea existent\u0103 la intersec\u021bia cu str. Aprodul Movil\u0103 \u0219i intersec\u021bia cu str. Bogd\u0103ne\u0219tilor;<\/p>\n<p>Str. B\u00e2rzava:\u00a0 se execut\u0103 \u00een continuare lucr\u0103ri de reabilitare a conductei \u00a0de ap\u0103\u00a0 din font\u0103 DN800; se execut\u0103 lucr\u0103ri de refacere a\u00a0 sistemul rutier;<\/p>\n<p>\u00a0<\/p>\n<p>LOT 2<\/p>\n<p>Progres: 81 %<\/p>\n<p>Str. Avram Imbroane:\u00a0 se execut\u0103 \u00een continuare lucr\u0103ri de reabilitare a conductei\u00a0 de ap\u0103\u00a0 din font\u0103 DN400 de la\u00a0 str. Gheorghe Adam spre str. M\u0103cin; se execut\u0103 lucr\u0103ri de refacere a\u00a0 sistemul rutier;<\/p>\n<p>Bd. Take Ionescu:\u00a0 se execut\u0103 lucr\u0103ri de refacere a sistemului rutier la intersec\u021bia cu str. A. Popovici;\u00a0 se execut\u0103\u00a0 leg\u0103tura dintre conducta nou\u0103 \u0219i cea existent\u0103 la intersec\u021bia cu str. Badeer;<\/p>\n<p>Str. Simion B\u0103rnu\u021biu: se execut\u0103 lucr\u0103ri de refacere a\u00a0 sistemul rutier;<\/p>\n<p>Str. Lugojului: se continu\u0103 lucr\u0103rile la re\u021beaua de canalizare; se execut\u0103 in continuare lucr\u0103ri de refacere a\u00a0 sistemul rutier;<\/p>\n<p>Str. Lorena: se execut\u0103 sondaje pentru stabilirea modului \u00een care se va face subtraversarea liniilor de tramvai la intersec\u021bia cu str. Gh. Adam;<\/p>\n<p>\u00a0<\/p>\n<p>LOT 3 Progres: 91,5 %<\/p>\n<p>Str. Sf. Ap. Petru si Pavel: se\u00a0 execut\u0103 lucr\u0103rile de refacere a sistemului rutier aferent re\u021belei de canalizare pe tronsonul str. C-tin cel Mare \u2013 str. Perlei ; se continu\u0103 execu\u021bia lucr\u0103rilor de reabilitare a conductei\u00a0 de apa\u00a0 din fonta DN400 \u0219i a conductei de distribuitei apa PEID 110 mm, precum \u0219i bran\u0219amente imobilelor pe tronsonul str. C-tin cel Mare \u2013 Str. Holdelor;<\/p>\n<p>TIMISOARA SUD<\/p>\n<p>LOT 2 Progres: 77 %<\/p>\n<p>Str. Ulpia Traiana: se lucreaz\u0103\u00a0 \u00een continuare\u00a0 la conducta de font\u0103 DN600 de la str. Mure\u0219 spre Str. Averescu; se execut\u0103 lucr\u0103ri de refacere a sistemului rutier;<\/p>\n<p>Str. Mure\u0219: se lucreaz\u0103 \u00een continuare la conducta de font\u0103 DN600 de la str. Drubeta spre Calea Martirilor; se execut\u0103 lucr\u0103ri de refacere a sistemului rutier.<\/p>\n<p>LOT 3 Progres: 71 %<\/p>\n<p>Str. Batania:\u00a0 se lucreaz\u0103 la conducta de font\u0103 DN1000 spre str. Herodot; se execut\u0103 lucr\u0103rile de refacere a sistemului rutier pe tronsonul str. Apateu \u2013 str. Herodot;<\/p>\n<p>Str. Industriei:\u00a0\u00a0 se execut\u0103 lucr\u0103ri preg\u0103titoare pentru leg\u0103turile din intersec\u021biile cu str. Francesco Illy \u0219i str. Torac, care vor avea loc s\u0103pt\u0103m\u00e2na viitoare;<\/p>\n<p>\u00cenchiderile aferente acestor ample \u0219antiere sunt, de altfel, anun\u021bate, din timp \u0219i zilnic,\u00a0 pe site-ul Aquatim, <a href=\"http:\/\/www.aquatim.ro\/\">www.aquatim.ro<\/a>, respectiv pe Facebook-ul companiei.\u00a0 Mul\u021bumim pentru \u00een\u021belegere, r\u0103bdare \u0219i \u00eencredere! \u2013 este mesajul Aquatim.<\/p>\n<p>CALL-CENTER\/ DISPECERAT: 0356 914, program 24\/7<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<h3>Comentarii<\/h3>\n<p> comentarii<\/p>\n<\/div>\n<p> Source URL: https:\/\/www.ziuadevest.ro\/progresul-lucrarilor-aquatim-timisoara-nord-lot1-94-timisoara-sud-lot-2-77\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pentru c\u0103 ne dore\u0219te ca locuitorii Timi\u0219oarei s\u0103 fie informa\u021bi cu privire la progresul lucr\u0103rilor realizate din fonduri europene, Aquatim ofer\u0103 \u0219i \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103 detalii despre fiecare strad\u0103 pe care desf\u0103\u0219oar\u0103 lucr\u0103ri. S\u0103pt\u0103m\u00e2na 04 \u2013 08.12.2023 TIMISOARA NORD LOT 1 Progres: 94 % Calea Torontalului: se continu\u0103 execu\u021bia lucr\u0103rilor de refacere a\u00a0 trotuarului; Str. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1559516,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[187],"class_list":["post-1559509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-ziuadevest-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1559509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1559509"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1559509\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/1559516"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1559509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1559509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1559509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}