{"id":1503383,"date":"2026-01-28T16:57:43","date_gmt":"2026-01-28T13:57:43","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1503383"},"modified":"2026-01-28T16:57:43","modified_gmt":"2026-01-28T13:57:43","slug":"noul-cet-pas-cu-pas-cand-pornesc-cazanele-cum-se-asigura-incalzirea-si-ce-inseamna-investitia-de-140-de-milioane-de-euro","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1503383","title":{"rendered":"Noul CET, pas cu pas: c\u00e2nd pornesc cazanele, cum se asigur\u0103 \u00eenc\u0103lzirea \u0219i ce \u00eenseamn\u0103 investi\u021bia de 140 de milioane de euro"},"content":{"rendered":"<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2048\" height=\"1154\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/cj-constantin-radulescu-1.jpg\" class=\"img-responsive wp-post-image\" alt=\"Noul CET, pas cu pas: c\u00e2nd pornesc cazanele, cum se asigur\u0103 \u00eenc\u0103lzirea \u0219i ce \u00eenseamn\u0103 investi\u021bia de 140 de milioane de euro\" title=\"cj-constantin-radulescu-1\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/01\/28\/noul-cet-pas-cu-pas-cand-pornesc-cazanele-cum-se-asigura-incalzirea-si-ce-inseamna-investitia-de-140-de-milioane-de-euro\/\" rel=\"bookmark\"><time class=\"entry-date published\" datetime=\"2026-01-28T18:57:43+02:00\">28 ianuarie 2026<\/time><time class=\"updated\" datetime=\"2026-01-28T18:58:21+02:00\">28 ianuarie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/eveniment\/\" rel=\"category tag\">Eveniment<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Subiectul noului CET revine constant \u00een discu\u021biile publice, mai ales atunci c\u00e2nd oamenii se g\u00e2ndesc la iarn\u0103, la facturi \u0219i la siguran\u021ba \u00eenc\u0103lzirii. \u00a0Investi\u021bia este mare, presiunea este mare, \u00a0iar ne\u00eencrederea apare u\u0219or dup\u0103 ani \u00een care sistemul de termoficare a fost fragil. \u00a0De aceast\u0103 dat\u0103, pre\u0219edintele Consiliul Jude\u021bean V\u00e2lcea, <strong>Constantin R\u0103dulescu<\/strong>, revine cu explica\u021bii \u00a0\u0219i cu termene concrete despre ceea ce se \u00eent\u00e2mpl\u0103 la noul CET.<\/p>\n<p>Proiectul are o valoare de aproximativ <strong>140 de milioane de euro<\/strong> \u0219i se afl\u0103 \u00een grafic. Lucr\u0103rile sunt \u00een desf\u0103\u0219urare, contractele sunt semnate, iar primele rezultate vor fi vizibile chiar din acest an. \u00a0\u00cen luna septembrie, <strong>patru cazane de ap\u0103 fierbinte<\/strong> vor deveni opera\u021bionale \u0219i vor produce ap\u0103 cald\u0103 \u0219i agent termic pentru municipiu.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean spune \u00a0c\u0103 nu exist\u0103 motive de panic\u0103. \u00a0Locuitorii ora\u0219ului nu vor r\u0103m\u00e2ne f\u0103r\u0103 ap\u0103 cald\u0103 sau c\u0103ldur\u0103. Transformarea CET-ului este un proces \u00eenceput de mai bine de doi ani \u0219i se face etapizat, f\u0103r\u0103 oprirea sistemului: \u201e<strong><em>Nu r\u0103m\u00e2ne absolut nimeni f\u0103r\u0103 ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103. CET-ul se transform\u0103. Am spus asta de doi ani. Am semnat contractul, au \u00eenceput lucr\u0103rile, se lucreaz\u0103 la noul CET. Facem trecerea de la utilajele vechi la utilajele noi. Centrala veche nu o d\u0103r\u00e2m\u0103m. Nu func\u021bion\u0103m dup\u0103 ideea c\u0103, dac\u0103 \u00eemi bag gaze, d\u0103r\u00e2m soba. Vom avea \u00een continuare cazanul 7 \u0219i cazanul pe c\u0103rbune. Nu le distrugem. Construim noua central\u0103, care devine opera\u021bional\u0103 etapizat<\/em><\/strong>\u201d, a explicat Constantin R\u0103dulescu.<\/p>\n<p>El a subliniat c\u0103 investi\u021bia este g\u00e2ndit\u0103 pe trei ani, iar func\u021bionarea se face progresiv. \u00cen 2026, apa cald\u0103 \u0219i c\u0103ldura vor fi asigurate prin cele patru cazane de ap\u0103 fierbinte. \u00cen 2027, proiectul va fi completat cu motoarele tehnice care vor \u00eenchide \u00eentregul ciclu de produc\u021bie:\u00a0 \u201d\u201e <strong><em>Cheltuim peste 140 de milioane de euro \u0219i anul viitor vom avea ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103. Din septembrie, cele patru cazane de ap\u0103 fierbinte devin func\u021bionale \u0219i cu ele livr\u0103m agent termic. Proiectul se implementeaz\u0103 etapizat. \u00cen 2027 vin motoarele \u0219i complet\u0103m tot sistemul. Avem grij\u0103 de popula\u021bia municipiului cu ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103, dar devenim \u0219i furnizor important de abur industrial \u0219i energie pentru partenerii de pe platforma industrial\u0103. CET-ul r\u0103m\u00e2ne un punct esen\u021bial pentru zona industrial\u0103\u201d<\/em><\/strong>, a spus \u0219eful CJ V\u00e2lcea.<\/p>\n<p>P\u00e2n\u0103 la punerea \u00een func\u021biune a centralei de cogenerare, autorit\u0103\u021bile jude\u021bene \u0219i cele locale vor continua subven\u021bia la c\u0103ldur\u0103. \u00a0Constantin R\u0103dulescu a anun\u021bat c\u0103 exist\u0103 un acord clar cu primarul municipiului pentru \u00eemp\u0103r\u021birea acestui efort financiar: \u201d\u201e\u00a0 <strong><em>Am discutat cu primarul municipiului. Consiliul Jude\u021bean pune o sum\u0103 de bani, prim\u0103ria pune o sum\u0103 de bani \u0219i asigur\u0103m subven\u021bia la c\u0103ldur\u0103. Anul acesta vom aloca bani pentru subven\u021bie. A\u0219tept\u0103m bugetul, s\u0103 vedem exact c\u00e2\u021bi bani avem la dispozi\u021bie<\/em><\/strong>\u201d, a precizat acesta.<\/p>\n<p>A explicat \u0219i situa\u021bia de anul trecut, c\u00e2nd banii jude\u021bului au fost direc\u021biona\u021bi c\u0103tre Direc\u021bia General\u0103 de Asisten\u021b\u0103 Social\u0103 \u0219i Protec\u021bia Copilului: \u201d <strong><em>Anul trecut, sumele pentru subven\u021bie au mers c\u0103tre DGASPC. Acolo erau nevoi urgente. Medicamente, salarii, oameni cu probleme de s\u0103n\u0103tate. Nu erau op\u021biuni. Anul acesta, punem din start bani pentru subven\u021bie, iar prim\u0103ria este partener \u00een acest demers\u201d<\/em><\/strong>, a completat Constantin R\u0103dulescu.<\/p>\n<p>Un alt subiect sensibil este cel legat de angaja\u021bii de la CET Govora.\u00a0 Pre\u0219edintele Consiliului Jude\u021bean a explicat c\u0103 o mare parte dintre salaria\u021bi se apropie de v\u00e2rsta pension\u0103rii \u0219i c\u0103 restructur\u0103rile vor fi f\u0103cute cu grij\u0103: \u201e<strong><em>Aproximativ 250 de oameni vor ie\u0219i la pensie. Termoficarea r\u0103m\u00e2ne. Vor r\u0103m\u00e2ne angaja\u021bi \u0219i \u00een CET. Se fac optimiz\u0103ri, dar nu \u00eengrijor\u0103ri. Eu nu mi-am b\u0103tut joc de oameni. Vom face lucrurile astfel \u00eenc\u00e2t centrala s\u0103 func\u021bioneze bine, iar oamenii s\u0103 fie trata\u021bi corect<\/em><\/strong>\u201d, a declarat R\u0103dulescu.<\/p>\n<p>\u0218eful CJ a subliniat c\u0103 noul CET va avea un rol important \u0219i dincolo de ora\u0219: \u201e<strong><em>Centrala va func\u021biona la parametri optimi \u0219i va deveni un obiectiv strategic. Va intra \u00een sistemul energetic na\u021bional \u0219i va fi un partener important pentru industria din zon\u0103<\/em><\/strong>\u201d, a mai spus pre\u0219edintele CJ.<\/p>\n<p>A\u0219adar, \u00a0lucr\u0103rile sunt \u00een grafic, cazanele de ap\u0103 fierbinte au ajuns, instalarea \u00eencepe \u00een toamn\u0103, iar municipiul R\u00e2mnicu V\u00e2lcea va avea ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103 \u0219i iarna viitoare, a\u0219a cum s-a \u00eent\u00e2mplat \u0219i p\u00e2n\u0103 acum.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Subiectul noului CET revine constant \u00een discu\u021biile publice, mai ales atunci c\u00e2nd oamenii se g\u00e2ndesc la iarn\u0103, la facturi \u0219i la siguran\u021ba \u00eenc\u0103lzirii. \u00a0Investi\u021bia este mare, presiunea este mare, \u00a0iar ne\u00eencrederea apare u\u0219or dup\u0103 ani \u00een care sistemul de termoficare a fost fragil. \u00a0De aceast\u0103 dat\u0103, pre\u0219edintele Consiliul Jude\u021bean V\u00e2lcea, <strong>Constantin R\u0103dulescu<\/strong>, revine cu explica\u021bii \u00a0\u0219i cu termene concrete despre ceea ce se \u00eent\u00e2mpl\u0103 la noul CET.<\/p>\n<p>Proiectul are o valoare de aproximativ <strong>140 de milioane de euro<\/strong> \u0219i se afl\u0103 \u00een grafic. Lucr\u0103rile sunt \u00een desf\u0103\u0219urare, contractele sunt semnate, iar primele rezultate vor fi vizibile chiar din acest an. \u00a0\u00cen luna septembrie, <strong>patru cazane de ap\u0103 fierbinte<\/strong> vor deveni opera\u021bionale \u0219i vor produce ap\u0103 cald\u0103 \u0219i agent termic pentru municipiu.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean spune \u00a0c\u0103 nu exist\u0103 motive de panic\u0103. \u00a0Locuitorii ora\u0219ului nu vor r\u0103m\u00e2ne f\u0103r\u0103 ap\u0103 cald\u0103 sau c\u0103ldur\u0103. Transformarea CET-ului este un proces \u00eenceput de mai bine de doi ani \u0219i se face etapizat, f\u0103r\u0103 oprirea sistemului: \u201e<strong><em>Nu r\u0103m\u00e2ne absolut nimeni f\u0103r\u0103 ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103. CET-ul se transform\u0103. Am spus asta de doi ani. Am semnat contractul, au \u00eenceput lucr\u0103rile, se lucreaz\u0103 la noul CET. Facem trecerea de la utilajele vechi la utilajele noi. Centrala veche nu o d\u0103r\u00e2m\u0103m. Nu func\u021bion\u0103m dup\u0103 ideea c\u0103, dac\u0103 \u00eemi bag gaze, d\u0103r\u00e2m soba. Vom avea \u00een continuare cazanul 7 \u0219i cazanul pe c\u0103rbune. Nu le distrugem. Construim noua central\u0103, care devine opera\u021bional\u0103 etapizat<\/em><\/strong>\u201d, a explicat Constantin R\u0103dulescu.<\/p>\n<p>El a subliniat c\u0103 investi\u021bia este g\u00e2ndit\u0103 pe trei ani, iar func\u021bionarea se face progresiv. \u00cen 2026, apa cald\u0103 \u0219i c\u0103ldura vor fi asigurate prin cele patru cazane de ap\u0103 fierbinte. \u00cen 2027, proiectul va fi completat cu motoarele tehnice care vor \u00eenchide \u00eentregul ciclu de produc\u021bie:\u00a0 \u201d\u201e <strong><em>Cheltuim peste 140 de milioane de euro \u0219i anul viitor vom avea ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103. Din septembrie, cele patru cazane de ap\u0103 fierbinte devin func\u021bionale \u0219i cu ele livr\u0103m agent termic. Proiectul se implementeaz\u0103 etapizat. \u00cen 2027 vin motoarele \u0219i complet\u0103m tot sistemul. Avem grij\u0103 de popula\u021bia municipiului cu ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103, dar devenim \u0219i furnizor important de abur industrial \u0219i energie pentru partenerii de pe platforma industrial\u0103. CET-ul r\u0103m\u00e2ne un punct esen\u021bial pentru zona industrial\u0103\u201d<\/em><\/strong>, a spus \u0219eful CJ V\u00e2lcea.<\/p>\n<p>P\u00e2n\u0103 la punerea \u00een func\u021biune a centralei de cogenerare, autorit\u0103\u021bile jude\u021bene \u0219i cele locale vor continua subven\u021bia la c\u0103ldur\u0103. \u00a0Constantin R\u0103dulescu a anun\u021bat c\u0103 exist\u0103 un acord clar cu primarul municipiului pentru \u00eemp\u0103r\u021birea acestui efort financiar: \u201d\u201e\u00a0 <strong><em>Am discutat cu primarul municipiului. Consiliul Jude\u021bean pune o sum\u0103 de bani, prim\u0103ria pune o sum\u0103 de bani \u0219i asigur\u0103m subven\u021bia la c\u0103ldur\u0103. Anul acesta vom aloca bani pentru subven\u021bie. A\u0219tept\u0103m bugetul, s\u0103 vedem exact c\u00e2\u021bi bani avem la dispozi\u021bie<\/em><\/strong>\u201d, a precizat acesta.<\/p>\n<p>A explicat \u0219i situa\u021bia de anul trecut, c\u00e2nd banii jude\u021bului au fost direc\u021biona\u021bi c\u0103tre Direc\u021bia General\u0103 de Asisten\u021b\u0103 Social\u0103 \u0219i Protec\u021bia Copilului: \u201d <strong><em>Anul trecut, sumele pentru subven\u021bie au mers c\u0103tre DGASPC. Acolo erau nevoi urgente. Medicamente, salarii, oameni cu probleme de s\u0103n\u0103tate. Nu erau op\u021biuni. Anul acesta, punem din start bani pentru subven\u021bie, iar prim\u0103ria este partener \u00een acest demers\u201d<\/em><\/strong>, a completat Constantin R\u0103dulescu.<\/p>\n<p>Un alt subiect sensibil este cel legat de angaja\u021bii de la CET Govora.\u00a0 Pre\u0219edintele Consiliului Jude\u021bean a explicat c\u0103 o mare parte dintre salaria\u021bi se apropie de v\u00e2rsta pension\u0103rii \u0219i c\u0103 restructur\u0103rile vor fi f\u0103cute cu grij\u0103: \u201e<strong><em>Aproximativ 250 de oameni vor ie\u0219i la pensie. Termoficarea r\u0103m\u00e2ne. Vor r\u0103m\u00e2ne angaja\u021bi \u0219i \u00een CET. Se fac optimiz\u0103ri, dar nu \u00eengrijor\u0103ri. Eu nu mi-am b\u0103tut joc de oameni. Vom face lucrurile astfel \u00eenc\u00e2t centrala s\u0103 func\u021bioneze bine, iar oamenii s\u0103 fie trata\u021bi corect<\/em><\/strong>\u201d, a declarat R\u0103dulescu.<\/p>\n<p>\u0218eful CJ a subliniat c\u0103 noul CET va avea un rol important \u0219i dincolo de ora\u0219: \u201e<strong><em>Centrala va func\u021biona la parametri optimi \u0219i va deveni un obiectiv strategic. Va intra \u00een sistemul energetic na\u021bional \u0219i va fi un partener important pentru industria din zon\u0103<\/em><\/strong>\u201d, a mai spus pre\u0219edintele CJ.<\/p>\n<p>A\u0219adar, \u00a0lucr\u0103rile sunt \u00een grafic, cazanele de ap\u0103 fierbinte au ajuns, instalarea \u00eencepe \u00een toamn\u0103, iar municipiul R\u00e2mnicu V\u00e2lcea va avea ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103 \u0219i iarna viitoare, a\u0219a cum s-a \u00eent\u00e2mplat \u0219i p\u00e2n\u0103 acum.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Subiectul noului CET revine constant \u00een discu\u021biile publice, mai ales atunci c\u00e2nd oamenii se g\u00e2ndesc la iarn\u0103, la facturi \u0219i la siguran\u021ba \u00eenc\u0103lzirii. \u00a0Investi\u021bia este mare, presiunea este mare, \u00a0iar ne\u00eencrederea apare u\u0219or dup\u0103 ani \u00een care sistemul de termoficare a fost fragil. \u00a0De aceast\u0103 dat\u0103, pre\u0219edintele Consiliul Jude\u021bean V\u00e2lcea, <strong>Constantin R\u0103dulescu<\/strong>, revine cu explica\u021bii \u00a0\u0219i cu termene concrete despre ceea ce se \u00eent\u00e2mpl\u0103 la noul CET.<\/p>\n<p>Proiectul are o valoare de aproximativ <strong>140 de milioane de euro<\/strong> \u0219i se afl\u0103 \u00een grafic. Lucr\u0103rile sunt \u00een desf\u0103\u0219urare, contractele sunt semnate, iar primele rezultate vor fi vizibile chiar din acest an. \u00a0\u00cen luna septembrie, <strong>patru cazane de ap\u0103 fierbinte<\/strong> vor deveni opera\u021bionale \u0219i vor produce ap\u0103 cald\u0103 \u0219i agent termic pentru municipiu.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean spune \u00a0c\u0103 nu exist\u0103 motive de panic\u0103. \u00a0Locuitorii ora\u0219ului nu vor r\u0103m\u00e2ne f\u0103r\u0103 ap\u0103 cald\u0103 sau c\u0103ldur\u0103. Transformarea CET-ului este un proces \u00eenceput de mai bine de doi ani \u0219i se face etapizat, f\u0103r\u0103 oprirea sistemului: \u201e<strong><em>Nu r\u0103m\u00e2ne absolut nimeni f\u0103r\u0103 ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103. CET-ul se transform\u0103. Am spus asta de doi ani. Am semnat contractul, au \u00eenceput lucr\u0103rile, se lucreaz\u0103 la noul CET. Facem trecerea de la utilajele vechi la utilajele noi. Centrala veche nu o d\u0103r\u00e2m\u0103m. Nu func\u021bion\u0103m dup\u0103 ideea c\u0103, dac\u0103 \u00eemi bag gaze, d\u0103r\u00e2m soba. Vom avea \u00een continuare cazanul 7 \u0219i cazanul pe c\u0103rbune. Nu le distrugem. Construim noua central\u0103, care devine opera\u021bional\u0103 etapizat<\/em><\/strong>\u201d, a explicat Constantin R\u0103dulescu.<\/p>\n<p>El a subliniat c\u0103 investi\u021bia este g\u00e2ndit\u0103 pe trei ani, iar func\u021bionarea se face progresiv. \u00cen 2026, apa cald\u0103 \u0219i c\u0103ldura vor fi asigurate prin cele patru cazane de ap\u0103 fierbinte. \u00cen 2027, proiectul va fi completat cu motoarele tehnice care vor \u00eenchide \u00eentregul ciclu de produc\u021bie:\u00a0 \u201d\u201e <strong><em>Cheltuim peste 140 de milioane de euro \u0219i anul viitor vom avea ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103. Din septembrie, cele patru cazane de ap\u0103 fierbinte devin func\u021bionale \u0219i cu ele livr\u0103m agent termic. Proiectul se implementeaz\u0103 etapizat. \u00cen 2027 vin motoarele \u0219i complet\u0103m tot sistemul. Avem grij\u0103 de popula\u021bia municipiului cu ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103, dar devenim \u0219i furnizor important de abur industrial \u0219i energie pentru partenerii de pe platforma industrial\u0103. CET-ul r\u0103m\u00e2ne un punct esen\u021bial pentru zona industrial\u0103\u201d<\/em><\/strong>, a spus \u0219eful CJ V\u00e2lcea.<\/p>\n<p>P\u00e2n\u0103 la punerea \u00een func\u021biune a centralei de cogenerare, autorit\u0103\u021bile jude\u021bene \u0219i cele locale vor continua subven\u021bia la c\u0103ldur\u0103. \u00a0Constantin R\u0103dulescu a anun\u021bat c\u0103 exist\u0103 un acord clar cu primarul municipiului pentru \u00eemp\u0103r\u021birea acestui efort financiar: \u201d\u201e\u00a0 <strong><em>Am discutat cu primarul municipiului. Consiliul Jude\u021bean pune o sum\u0103 de bani, prim\u0103ria pune o sum\u0103 de bani \u0219i asigur\u0103m subven\u021bia la c\u0103ldur\u0103. Anul acesta vom aloca bani pentru subven\u021bie. A\u0219tept\u0103m bugetul, s\u0103 vedem exact c\u00e2\u021bi bani avem la dispozi\u021bie<\/em><\/strong>\u201d, a precizat acesta.<\/p>\n<p>A explicat \u0219i situa\u021bia de anul trecut, c\u00e2nd banii jude\u021bului au fost direc\u021biona\u021bi c\u0103tre Direc\u021bia General\u0103 de Asisten\u021b\u0103 Social\u0103 \u0219i Protec\u021bia Copilului: \u201d <strong><em>Anul trecut, sumele pentru subven\u021bie au mers c\u0103tre DGASPC. Acolo erau nevoi urgente. Medicamente, salarii, oameni cu probleme de s\u0103n\u0103tate. Nu erau op\u021biuni. Anul acesta, punem din start bani pentru subven\u021bie, iar prim\u0103ria este partener \u00een acest demers\u201d<\/em><\/strong>, a completat Constantin R\u0103dulescu.<\/p>\n<p>Un alt subiect sensibil este cel legat de angaja\u021bii de la CET Govora.\u00a0 Pre\u0219edintele Consiliului Jude\u021bean a explicat c\u0103 o mare parte dintre salaria\u021bi se apropie de v\u00e2rsta pension\u0103rii \u0219i c\u0103 restructur\u0103rile vor fi f\u0103cute cu grij\u0103: \u201e<strong><em>Aproximativ 250 de oameni vor ie\u0219i la pensie. Termoficarea r\u0103m\u00e2ne. Vor r\u0103m\u00e2ne angaja\u021bi \u0219i \u00een CET. Se fac optimiz\u0103ri, dar nu \u00eengrijor\u0103ri. Eu nu mi-am b\u0103tut joc de oameni. Vom face lucrurile astfel \u00eenc\u00e2t centrala s\u0103 func\u021bioneze bine, iar oamenii s\u0103 fie trata\u021bi corect<\/em><\/strong>\u201d, a declarat R\u0103dulescu.<\/p>\n<p>\u0218eful CJ a subliniat c\u0103 noul CET va avea un rol important \u0219i dincolo de ora\u0219: \u201e<strong><em>Centrala va func\u021biona la parametri optimi \u0219i va deveni un obiectiv strategic. Va intra \u00een sistemul energetic na\u021bional \u0219i va fi un partener important pentru industria din zon\u0103<\/em><\/strong>\u201d, a mai spus pre\u0219edintele CJ.<\/p>\n<p>A\u0219adar, \u00a0lucr\u0103rile sunt \u00een grafic, cazanele de ap\u0103 fierbinte au ajuns, instalarea \u00eencepe \u00een toamn\u0103, iar municipiul R\u00e2mnicu V\u00e2lcea va avea ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103 \u0219i iarna viitoare, a\u0219a cum s-a \u00eent\u00e2mplat \u0219i p\u00e2n\u0103 acum.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<\/div>\n<p> Source URL: https:\/\/www.impactreal.ro\/2026\/01\/28\/noul-cet-pas-cu-pas-cand-pornesc-cazanele-cum-se-asigura-incalzirea-si-ce-inseamna-investitia-de-140-de-milioane-de-euro\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>28 ianuarie 202628 ianuarie 2026Claudia SchiopuEveniment Subiectul noului CET revine constant \u00een discu\u021biile publice, mai ales atunci c\u00e2nd oamenii se g\u00e2ndesc la iarn\u0103, la facturi \u0219i la siguran\u021ba \u00eenc\u0103lzirii. \u00a0Investi\u021bia este mare, presiunea este mare, \u00a0iar ne\u00eencrederea apare u\u0219or dup\u0103 ani \u00een care sistemul de termoficare a fost fragil. \u00a0De aceast\u0103 dat\u0103, pre\u0219edintele Consiliul Jude\u021bean [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1503384,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[212],"class_list":["post-1503383","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1503383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1503383"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1503383\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/1503384"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1503383"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1503383"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1503383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}