{"id":1453153,"date":"2025-07-29T09:54:33","date_gmt":"2025-07-29T06:54:33","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1453153"},"modified":"2025-07-29T09:54:33","modified_gmt":"2025-07-29T06:54:33","slug":"cladirea-principala-a-spitalului-de-copii-din-timisoara-reabilitata-termic","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1453153","title":{"rendered":"Cl\u0103direa principal\u0103 a Spitalului de Copii din Timi\u015foara, reabilitat\u0103 termic"},"content":{"rendered":"<div class=\"pf-content\">\n<div id=\"attachment_59301\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/spitalul-de-copii-louis-turcanu-timisoara-foto-pmt.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-59301\" loading=\"lazy\" title=\"Spitalul de Copii Louis Turcanu Timisoara Foto PMT\" width=\"960\" height=\"540\" class=\"wp-image-59301 size-full lazyload\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/spitalul-de-copii-louis-turcanu-timisoara-foto-pmt.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-59301\" loading=\"lazy\" class=\"wp-image-59301 size-full\" title=\"Spitalul de Copii Louis Turcanu Timisoara Foto PMT\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/spitalul-de-copii-louis-turcanu-timisoara-foto-pmt.jpg\" width=\"960\" height=\"540\"><\/a><\/p>\n<p id=\"caption-attachment-59301\" class=\"wp-caption-text\">Foto: PMT<\/p>\n<\/div>\n<p><strong>Comisia Tehnico-Economic\u0103 a Prim\u0103riei Timi\u0219oara a avizat, azi, proiectul de eficientizare energetic\u0103 a corpului C1 al Spitalului de Copii \u201eLouis \u021aurcanu\u201d, anun\u0163\u0103 Municipalitatea. Investi\u021bia vizeaz\u0103 o reducere de peste 60% a consumului de energie, prin lucr\u0103ri ample de izolare termic\u0103, modernizare a instala\u021biilor \u0219i dot\u0103ri eficiente energetic.<\/strong><\/p>\n<p>\u00a0<\/p>\n<p>Proiectul avizat de Municipalitate pentru Spitalul de Copii include lucr\u0103ri de izolare termic\u0103, modernizare a instala\u021biilor \u0219i dot\u0103ri care vor reduce consumul de energie cu peste 60%. Astfel, cl\u0103direa va fi dotat\u0103 cu instala\u021bii moderne de ventila\u021bie cu recuperare de c\u0103ldur\u0103, corpuri de iluminat eficiente energetic \u0219i panouri fotovoltaice, care vor produce o parte din energia necesar\u0103 func\u021bion\u0103rii<em>. \u201cSpa\u021biile medicale vor deveni mai bine ventilate, mai u\u0219or de \u00eenc\u0103lzit sau r\u0103cit, iar costurile de func\u021bionare vor sc\u0103dea considerabil<\/em>\u201d, spun oficialii Prim\u0103riei.<\/p>\n<p>Pe l\u00e2ng\u0103 lucr\u0103rile de eficien\u021b\u0103 energetic\u0103, proiectul cuprinde \u0219i interven\u021bii esen\u021biale pentru cre\u0219terea siguran\u021bei \u0219i a accesibilit\u0103\u021bii. Vor fi \u00eenlocuite toate elementele de t\u00e2mpl\u0103rie exterioar\u0103 \u0219i interioar\u0103 care nu respect\u0103 standardele actuale. Va fi montat un nou lift, adaptat transportului pacien\u021bilor pe targ\u0103, iar pentru situa\u021biile de urgen\u021b\u0103 va fi construit\u0103 o cas\u0103 de scar\u0103 nou\u0103, care s\u0103 permit\u0103 evacuarea pacien\u021bilor \u00een condi\u021bii de siguran\u021b\u0103. De asemenea, va fi amenajat\u0103 o ramp\u0103 de acces pentru persoanele cu mobilitate redus\u0103.<\/p>\n<p>Valoarea estimat\u0103 a proiectului se ridic\u0103 la 11,5 milioane de lei (inclusiv TVA), iar documenta\u021bia va fi depus\u0103 pentru finan\u021bare din fonduri europene nerambursabile, prin Programul Regional Vest 2021\u20132027.<\/p>\n<p>Aceast\u0103 investi\u021bie vine \u00een completarea unui alt proiect avizat de Municipalitate pentru corpul C1 al Spitalului de Copii \u201eLouis \u021aurcanu\u201d, respectiv extinderea capacit\u0103\u021bii pentru \u00eengrijiri paliative. Proiectul prevede transformarea complet\u0103 a ultimului etaj al cl\u0103dirii \u0219i construirea unei mansarde noi, unde vor fi amenajate 13 paturi \u0219i cabinete specializate, dar \u0219i un loc de joac\u0103 pentru copii \u0219i apar\u021bin\u0103tori, o zon\u0103 pentru terapie vizual\u0103 \u0219i un spa\u021biu pentru reculegere.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<div id=\"metaslider-id-56545\" class=\"ml-slider-3-18-9 metaslider metaslider-responsive metaslider-56545 ml-slider nav-hidden nav-hidden nav-hidden\">\n<div id=\"metaslider_container_56545\">\n<ul id=\"metaslider_56545\" class=\"rslides\">\n<li><a href=\"https:\/\/www.iuliustown.ro\/ro\/winter-sale\" target=\"_blank\"><img decoding=\"async\" width=\"610\" height=\"260\" loading=\"lazy\" title=\"Banner Iulius Town - Winter Sales - ianuarie 2025 - 610x260\" class=\"slider-56545 slide-61078 lazyload\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/banner-iulius-town-winter-sales-ianuarie-2025-610x260-1-150.png\"><img decoding=\"async\" width=\"610\" height=\"260\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/banner-iulius-town-winter-sales-ianuarie-2025-610x260-1-150.png\" class=\"slider-56545 slide-61078\" loading=\"lazy\" title=\"Banner Iulius Town - Winter Sales - ianuarie 2025 - 610x260\"><\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"printfriendly pf-alignright\"><a href=\"https:\/\/timpolis.ro\/cladirea-principala-a-spitalului-din-timisoara-reabilitata-termic\/\" rel=\"nofollow\" title=\"Printer Friendly, PDF &amp; Email\"><img decoding=\"async\" alt=\"Print Friendly, PDF &amp; Email\" class=\"lazyload\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/print-button-150.png\" title=\"print-button-150\"><img decoding=\"async\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/print-button-150.png\" alt=\"Print Friendly, PDF &amp; Email\" title=\"print-button-150\"><\/a><\/div>\n<\/div>\n<p> Source URL: https:\/\/timpolis.ro\/cladirea-principala-a-spitalului-din-timisoara-reabilitata-termic\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Foto: PMT Comisia Tehnico-Economic\u0103 a Prim\u0103riei Timi\u0219oara a avizat, azi, proiectul de eficientizare energetic\u0103 a corpului C1 al Spitalului de Copii \u201eLouis \u021aurcanu\u201d, anun\u0163\u0103 Municipalitatea. Investi\u021bia vizeaz\u0103 o reducere de peste 60% a consumului de energie, prin lucr\u0103ri ample de izolare termic\u0103, modernizare a instala\u021biilor \u0219i dot\u0103ri eficiente energetic. \u00a0 Proiectul avizat de Municipalitate pentru [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[202],"class_list":["post-1453153","post","type-post","status-publish","format-standard","hentry","category-romania","tag-timpolis-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1453153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1453153"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1453153\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1453153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1453153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1453153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}