{"id":1441622,"date":"2022-08-15T00:00:00","date_gmt":"2022-08-14T21:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1441622"},"modified":"2022-08-15T00:00:00","modified_gmt":"2022-08-14T21:00:00","slug":"foto-tronsonul-doi-al-rutei-alternative-suceava-botosani-aproape-de-finalizare","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1441622","title":{"rendered":"FOTO Tronsonul doi al rutei alternative Suceava- Boto\u0219ani, aproape de finalizare"},"content":{"rendered":"<div class=\"entry-content\">\n<p><a href=\"https:\/\/www.botosaninews.ro\/wp-content\/uploads\/2022\/08\/ruta-botosani-suceava4.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignright size-medium wp-image-536328\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/ruta-botosani-suceava4-300x183-1.jpg\" width=\"300\" height=\"183\" title=\"ruta-botosani-suceava4-300x183-1\"><\/a>Tronsonul doi al rutei alternative Suceava- Boto\u0219ani este aproape de finalizare, potrivit unui anun\u021b f\u0103cut de primarul municipiului Suceava, Ion Lungu. Potrivit acestuia, <em><strong>\u201eeste \u00een faza de finalizare tronsonul II din Ruta Alternativ\u0103 Suceava- Boto\u0219ani, cu prins\u0103 \u00eentre Podul Unirii \u0219i strada Apeductului<\/strong><\/em>\u201d.<\/p>\n<p>Din suma de 43.000.000 lei, primit\u0103 \u00een cadrul Programului Na\u021bional de Investi\u021bii Anghel Saligny, va fi finan\u021bat par\u021bial Viaductul de peste calea ferat\u0103 \u00een lungime de 1.015 metri.<\/p>\n<div class=\"cxmmr5t8 oygrvhab hcukyx3x c1et5uql o9v6fnle ii04i59q\">\n<p dir=\"auto\"><em><strong>\u201eEste \u00een curs de finalizare tronsonul II din Ruta Alternativ\u0103 Suceava -Boto\u0219ani. Preg\u0103tim demararea lucr\u0103rilor la ultimul tronson cel cuprins \u00eentre Podul Unirii \u0219i DN 29. Ultimul tronson are o lungime de 2.142 metri din care cel mai important obiectiv este viaductul peste calea ferat\u0103 \u00een lungime de 1.015 metri. Ne-a fost alocat\u0103 prin PNI Anghel Saligny suma de 43.000.000 lei. Valoarea actualizat\u0103 a proiectului depus la ministerul dezvolt\u0103rii este de 96.084. 406,44 lei(19.525.382 euro). De aceea am decis s\u0103 finan\u021b\u0103m par\u021bial din banii de la guvern viaductul de peste calea ferat\u0103. Valoarea actualizat\u0103 pentru realizarea viaductului se ridic\u0103 la 71.022.234,50 lei(14.432.480 euro)\u201d<\/strong><\/em>, spune Ion Lungu.<\/p>\n<p dir=\"auto\">\u00cen paralel vor finan\u021ba din surse proprii, diferen\u021ba de finalizare a \u00eentregului tronson cu por\u021biunea cuprins\u0103 \u00eentre Podul Unirii \u0219i viaduct \u0219i ultima por\u021biune dup\u0103 viaduct, cu ie\u0219ire \u00een DN 29, unde va fi realizat un sens giratoriu. Durata de finalizare a ultimului tronson este de 36 de luni.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-312226 gallery-columns-3 gallery-size-thumbnail\">\n<dl class=\"gallery-item\">\n<dt class=\"gallery-icon portrait\"><a href=\"https:\/\/suceavanews.ro\/wp-content\/uploads\/2022\/08\/ruta-botosani-suceava3.jpg\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/ruta-botosani-suceava3-150x150-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" loading=\"lazy\" title=\"ruta-botosani-suceava3-150x150-1\"><\/a><\/dt>\n<\/dl>\n<dl class=\"gallery-item\">\n<dt class=\"gallery-icon landscape\"><a href=\"https:\/\/suceavanews.ro\/wp-content\/uploads\/2022\/08\/ruta-botosani-suceava.jpg\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/ruta-botosani-suceava-150x150-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" loading=\"lazy\" title=\"ruta-botosani-suceava-150x150-1\"><\/a><\/dt>\n<\/dl>\n<dl class=\"gallery-item\">\n<dt class=\"gallery-icon landscape\"><a href=\"https:\/\/suceavanews.ro\/wp-content\/uploads\/2022\/08\/ruta-botosani-suceava2.jpg\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/ruta-botosani-suceava2-150x150-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" loading=\"lazy\" title=\"ruta-botosani-suceava2-150x150-1\"><\/a><\/dt>\n<\/dl>\n<p><\/p>\n<dl class=\"gallery-item\">\n<dt class=\"gallery-icon landscape\"><a href=\"https:\/\/suceavanews.ro\/wp-content\/uploads\/2022\/08\/ruta-botosani-suceava4.jpg\"><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2026\/01\/ruta-botosani-suceava4-150x150-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" loading=\"lazy\" title=\"ruta-botosani-suceava4-150x150-1\"><\/a><\/dt>\n<\/dl>\n<p><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tronsonul doi al rutei alternative Suceava- Boto\u0219ani este aproape de finalizare, potrivit unui anun\u021b f\u0103cut de primarul municipiului Suceava, Ion Lungu. Potrivit acestuia, \u201eeste \u00een faza de finalizare tronsonul II din Ruta Alternativ\u0103 Suceava- Boto\u0219ani, cu prins\u0103 \u00eentre Podul Unirii \u0219i strada Apeductului\u201d. Din suma de 43.000.000 lei, primit\u0103 \u00een cadrul Programului Na\u021bional de Investi\u021bii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[174],"class_list":["post-1441622","post","type-post","status-publish","format-standard","hentry","category-romania","tag-suceavanews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1441622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1441622"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1441622\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1441622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1441622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1441622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}