{"id":1106162,"date":"2025-12-16T13:29:24","date_gmt":"2025-12-16T10:29:24","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1106162"},"modified":"2025-12-16T13:29:24","modified_gmt":"2025-12-16T10:29:24","slug":"patru-oferte-la-licitatia-pentru-construirea-halei-de-mentenanta-a-tramvaielor-noi","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1106162","title":{"rendered":"Patru oferte, la licita\u021bia pentru construirea halei de mentenan\u021b\u0103 a tramvaielor noi"},"content":{"rendered":"<div class=\"pf-content\">\n<div id=\"attachment_54812\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/tramvai-5-foto-pmt-scaled-1.jpeg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-54812\" loading=\"lazy\" title=\"Tramvai 5 Foto PMT\" width=\"1685\" height=\"1200\" class=\"wp-image-54812 size-full lazyload\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/tramvai-5-foto-pmt-scaled-1.jpeg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-54812\" loading=\"lazy\" class=\"wp-image-54812 size-full\" title=\"Tramvai 5 Foto PMT\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/tramvai-5-foto-pmt-scaled-1.jpeg\" width=\"1685\" height=\"1200\"><\/a><\/p>\n<p id=\"caption-attachment-54812\" class=\"wp-caption-text\">Surs\u0103 foto_Prim\u0103ria Timi\u015foara<\/p>\n<\/div>\n<p><strong>Licita\u021bia lansat\u0103 de Prim\u0103ria Municipiului Timi\u0219oara pentru construirea halei de mentenan\u021b\u0103 a tramvaielor noi a atras patru asocieri de firme. Investi\u021bia completeaz\u0103 infrastructura existent\u0103 \u0219i va permite \u00eentre\u021binerea simultan\u0103 a mai multor tramvaie din flota modernizat\u0103 a ora\u0219ului, anun\u0163\u0103 Municipalitatea.<\/strong><\/p>\n<p>\u00a0<\/p>\n<p>Proiectul Municipalit\u0103\u021bii prevede construirea unei hale moderne de mentenan\u021b\u0103, cu o lungime de 90 de metri, conform cerin\u021belor tehnice ale noilor tramvaie. Hala va asigura condi\u021bii optime pentru opera\u021biunile de \u00eentre\u021binere \u0219i va fi dotat\u0103 cu echipamente specializate, precum groap\u0103 tehnic\u0103, cale de rulare, pod rulant de 5 tone \u0219i 12 elevatoare, care vor permite interven\u021bii inclusiv la nivelul vagoanelor. Accesul la noua hal\u0103 va fi asigurat din bulevardul D\u00e2mbovi\u021ba \u0219i din Strada Ardealului.<\/p>\n<p>Investi\u021bia completeaz\u0103 proiectul de \u00eennoire a flotei de tramvaie \u0219i contribuie la reducerea costurilor de exploatare \u0219i \u00eentre\u021binere, precum \u0219i la diminuarea consumului de energie, cu impact direct asupra eficien\u021bei \u0219i costurilor transportului public pentru c\u0103l\u0103tori.<\/p>\n<p>Durata de execu\u021bie a lucr\u0103rilor este de zece luni, iar valoarea estimat\u0103 a contractului este de aproximativ 14 milioane lei, finan\u021bat\u0103 din bugetul local.<\/p>\n<p>Asocierile de firme interesate s\u0103 participae la licita\u0163ie sunt: Jerom Busines Developmen SRL (lider), London Gates &amp; Railnings LTD; Imo Plus Developer SRL (lider), Montifish; Zaron SRL (lider), En Electric Proiect Office \u0219i Belcons Civil Eengineering SRL (lider), JDA Consult.<\/p>\n<p>Municipalitatea spune c\u0103 a achizi\u021bionat ini\u021bial serviciile de proiectare tehnic\u0103 \u0219i execu\u021bie \u00eentr-un singur contract. Ulterior, \u00een baza solu\u021biei finale \u0219i a proiectului tehnic aprobat, valoarea estimat\u0103 a lucr\u0103rilor a fost majorat\u0103. \u00cen aceste condi\u021bii, contractul cu constructorul anterior a fost \u00eencetat de comun acord, iar procedura de achizi\u021bie pentru execu\u021bia lucr\u0103rilor a fost reluat\u0103.<\/p>\n<p>Totodat\u0103, Prim\u0103ria Municipiului Timi\u0219oara a finalizat \u00een aceast\u0103 toamn\u0103 noua platform\u0103 de la depoul din zona D\u00e2mbovi\u021ba, dotat\u0103 cu 44 de sta\u021bii de \u00eenc\u0103rcare lent\u0103 \u0219i 4 sta\u021bii de \u00eenc\u0103rcare rapid\u0103. Platforma va fi utilizat\u0103 de Societatea de Transport Public Timi\u0219oara pentru operarea autobuzelor electrice.<\/p>\n<div id=\"metaslider-id-56545\" class=\"ml-slider-3-18-9 metaslider metaslider-responsive metaslider-56545 ml-slider nav-hidden nav-hidden nav-hidden\">\n<div id=\"metaslider_container_56545\">\n<ul id=\"metaslider_56545\" class=\"rslides\">\n<li><a href=\"https:\/\/iuliustown.ro\/ro\" target=\"_blank\"><img decoding=\"async\" width=\"610\" height=\"260\" loading=\"lazy\" title=\"Banner Iulius Town - decembrie 2025 - 610x260\" class=\"slider-56545 slide-60736 lazyload\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/banner-iulius-town-decembrie-2025-610x260-1-97.png\"><img decoding=\"async\" width=\"610\" height=\"260\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/banner-iulius-town-decembrie-2025-610x260-1-97.png\" class=\"slider-56545 slide-60736\" loading=\"lazy\" title=\"Banner Iulius Town - decembrie 2025 - 610x260\"><\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"printfriendly pf-alignright\"><a href=\"https:\/\/timpolis.ro\/patru-oferte-la-licitatia-pentru-construirea-halei-de-mentenanta-a-tramvaielor-noi\/\" rel=\"nofollow\" title=\"Printer Friendly, PDF &amp; Email\"><img decoding=\"async\" alt=\"Print Friendly, PDF &amp; Email\" class=\"lazyload\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/print-button-97.png\" title=\"print-button-97\"><img decoding=\"async\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/print-button-97.png\" alt=\"Print Friendly, PDF &amp; Email\" title=\"print-button-97\"><\/a><\/div>\n<\/div>\n<p> Source URL: https:\/\/timpolis.ro\/patru-oferte-la-licitatia-pentru-construirea-halei-de-mentenanta-a-tramvaielor-noi\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Surs\u0103 foto_Prim\u0103ria Timi\u015foara Licita\u021bia lansat\u0103 de Prim\u0103ria Municipiului Timi\u0219oara pentru construirea halei de mentenan\u021b\u0103 a tramvaielor noi a atras patru asocieri de firme. Investi\u021bia completeaz\u0103 infrastructura existent\u0103 \u0219i va permite \u00eentre\u021binerea simultan\u0103 a mai multor tramvaie din flota modernizat\u0103 a ora\u0219ului, anun\u0163\u0103 Municipalitatea. \u00a0 Proiectul Municipalit\u0103\u021bii prevede construirea unei hale moderne de mentenan\u021b\u0103, cu o [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1106163,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[202],"class_list":["post-1106162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-timpolis-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1106162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1106162"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1106162\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/1106163"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1106162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1106162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1106162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}