{"id":1091524,"date":"2025-02-06T19:01:11","date_gmt":"2025-02-06T16:01:11","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1091524"},"modified":"2025-02-06T19:01:11","modified_gmt":"2025-02-06T16:01:11","slug":"drumul-oaselor-tot-mai-aproape-de-redeschidere","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1091524","title":{"rendered":"Drumul Oaselor, tot mai aproape de redeschidere"},"content":{"rendered":"<article id=\"post-49669\" class=\"post-49669 post type-post status-publish format-standard has-post-thumbnail hentry category-local\">\n<div class=\"news-section-info clearfix\">\n<h3 class=\"section-title\">Drumul Oaselor, tot mai aproape de redeschidere<\/h3>\n<\/div>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/cj-februarie-01-scaled-2.jpg\" class=\"img-responsive wp-post-image\" alt=\"Drumul Oaselor, tot mai aproape de redeschidere\" title=\"cj-februarie-01-scaled-2\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2025\/02\/06\/reabilitarea-drumului-oaselor-ce-planuri-are-autoritatea-locala-pentru-finalizare\/\" rel=\"bookmark\"><time class=\"entry-date published\" datetime=\"2025-02-06T21:01:11+02:00\">6 februarie 2025<\/time><time class=\"updated\" datetime=\"2025-02-08T16:38:27+02:00\">8 februarie 2025<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/local\/\" rel=\"category tag\">Local<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p><strong>Reabilitarea Drumului Oaselor prinde vitez\u0103<\/strong><\/p>\n<p>Lucr\u0103rile de <a href=\"https:\/\/valceainfo.ro\/2024\/08\/14\/dupa-24-de-ani-drumul-oaselor-se-redeschide-in-curand-circulatiei-rutiere-pe-tronsonul-berbesti-copaceni\/\">reabilitare<\/a> a Drumului Oaselor continu\u0103 \u00eentre Berbe\u0219ti \u0219i Cop\u0103ceni, profit\u00e2nd de vremea favorabil\u0103. Dup\u0103 ani de stagnare, acest drum esen\u021bial pentru \u00a0cet\u0103\u021benii din zon\u0103 va fi redat circula\u021biei, obiectivul fiind finalizarea celor 10,5 km p\u00e2n\u0103 de Pa\u0219te.<\/p>\n<p><strong><a href=\"https:\/\/www.impactreal.ro\/2024\/08\/11\/drumul-oaselor-se-redeschide-ce-etape-urmeaza-pentru-finalizarea-lucrarilor\/\">Constantin R\u0103dulescu<\/a>: \u201dNe \u201eprimenim\u201d pentru Pa\u0219te!<\/strong><\/p>\n<p>\u201dVremea bun\u0103 ne permite s\u0103 lucr\u0103m pe drumurile jude\u021bene. Ast\u0103zi, am fost pe Drumul Oaselor, unde drumarii RAJDP lucreaz\u0103 pe sectorul dintre Berbe\u0219ti \u0219i Cop\u0103ceni. Lucr\u0103rile pe Drumul Oaselor au \u00eenceput de anul trecut, cu defri\u0219area zonei, decolmatarea \u0219an\u021burilor \u0219i a pode\u021belor, dar \u0219i cu asfaltarea unui tronson de 2 km. Vom lucra \u00een continuare pe acest drum, fiindc\u0103 \u00eemi doresc ca p\u00e2n\u0103 de Pa\u0219te s\u0103 avem reabilitat \u0219i s\u0103 red\u0103m circula\u021biei sectorul de 10,5 km dintre Berbe\u0219ti \u0219i Cop\u0103ceni.Ne \u021binem de cuv\u00e2nt \u0219i vom redeschide circula\u021bia pe Drumul Oaselor, un drum important pentru v\u00e2lcenii din aceast\u0103 zon\u0103 \u0219i care a stat \u00eenchis peste 20 de ani\u201d, <em><strong>a declarat pre\u0219edintele Consiliului Jude\u021bean V\u00e2lcea, Constantin R\u0103dulescu<\/strong><\/em>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-49671\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/cj-februarie-02-drumul-oaselor-e7313dfc142d-300x169-1.jpg\" width=\"300\" height=\"169\" title=\"cj-februarie-02-drumul-oaselor-e7313dfc142d-300x169-1\"><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<p> Source URL: https:\/\/www.impactreal.ro\/2025\/02\/06\/reabilitarea-drumului-oaselor-ce-planuri-are-autoritatea-locala-pentru-finalizare\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drumul Oaselor, tot mai aproape de redeschidere 6 februarie 20258 februarie 2025Claudia SchiopuLocal Reabilitarea Drumului Oaselor prinde vitez\u0103 Lucr\u0103rile de reabilitare a Drumului Oaselor continu\u0103 \u00eentre Berbe\u0219ti \u0219i Cop\u0103ceni, profit\u00e2nd de vremea favorabil\u0103. Dup\u0103 ani de stagnare, acest drum esen\u021bial pentru \u00a0cet\u0103\u021benii din zon\u0103 va fi redat circula\u021biei, obiectivul fiind finalizarea celor 10,5 km p\u00e2n\u0103 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1091525,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[212],"class_list":["post-1091524","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1091524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1091524"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1091524\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/1091525"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1091524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1091524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1091524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}