{"id":1084595,"date":"2025-10-09T09:59:34","date_gmt":"2025-10-09T06:59:34","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1084595"},"modified":"2025-10-09T09:59:34","modified_gmt":"2025-10-09T06:59:34","slug":"sedinta-care-a-pus-pe-masa-planul-de-afaceri-al-apavil-redeventa-retelele-care-cedeaza-si-proiectul-regional-blocat","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1084595","title":{"rendered":"\u0218edin\u021ba care a pus pe mas\u0103 planul de afaceri al Apavil: redeven\u021ba, re\u021belele care cedeaz\u0103 \u0219i proiectul regional blocat"},"content":{"rendered":"<article id=\"post-53976\" class=\"post-53976 post type-post status-publish format-standard has-post-thumbnail hentry category-1slider category-actualitate category-eveniment\">\n<div class=\"news-section-info clearfix\">\n<h3 class=\"section-title\">\u0218edin\u021ba care a pus pe mas\u0103 planul de afaceri al Apavil: redeven\u021ba, re\u021belele care cedeaz\u0103 \u0219i proiectul regional blocat<\/h3>\n<\/div>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2040\" height=\"1530\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/apavil-08-octombrie-699-1.jpg\" class=\"img-responsive wp-post-image\" alt=\"\u0218edin\u021ba care a pus pe mas\u0103 planul de afaceri al Apavil: redeven\u021ba, re\u021belele care cedeaz\u0103 \u0219i proiectul regional blocat\" title=\"apavil-08-octombrie-699-1\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2025\/10\/09\/apa-cifre-si-nerabdare-sedinta-care-a-pus-pe-masa-planul-de-afaceri-al-apavil-redeventa-retelele-care-cedeaza-si-proiectul-regional-blocat\/\" rel=\"bookmark\"><time class=\"entry-date published\" datetime=\"2025-10-09T12:59:34+03:00\">9 octombrie 2025<\/time><time class=\"updated\" datetime=\"2025-10-10T18:24:22+03:00\">10 octombrie 2025<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/1slider\/\" rel=\"category tag\">1Slider<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/actualitate\/\" rel=\"category tag\">Actual<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/eveniment\/\" rel=\"category tag\">Eveniment<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>Adunarea General\u0103 a Asocia\u021bilor din cadrul Asocia\u021biei de Dezvoltare Intercomunitar\u0103 \u201eAp\u0103 V\u00e2lcea\u201d s-a desf\u0103\u0219urat pe 8 octombrie 2025, la sediul din R\u00e2mnicu V\u00e2lcea, de pe strada C\u0103pitan M\u0103r\u0103\u0219eanu nr. 3. A fost o \u0219edin\u021b\u0103 a\u0219teptat\u0103. Pe ordinea de zi, puncte aparent tehnice, dar cu efect direct asupra oamenilor: procesul-verbal din 24 septembrie, completarea Scrisorii de a\u0219tept\u0103ri pentru selec\u021bia a doi membri \u00een Consiliul de Administra\u021bie al Apavil S.A., propunerea unui administrator provizoriu \u00een CA la ini\u021biativa municipiului \u0219i discu\u021bii aplicate cu directorul general Ion Florescu despre preluarea \u0219i extinderea re\u021belelor de ap\u0103 \u0219i canalizare din localit\u0103\u021bile membre, plus diverse.<\/p>\n<p>F\u0103r\u0103 artificii, f\u0103r\u0103 ocoli\u0219uri \u2013 s-a vorbit despre bani, proceduri, acte, pierderi, avarii, resurse umane, responsabilit\u0103\u021bi \u00eemp\u0103r\u021bite \u00eentre operator \u0219i UAT-uri, despre redeven\u021b\u0103 \u0219i cadrul legal, despre ruralul care seac\u0103 la f\u00e2nt\u00e2n\u0103 \u0219i despre un proiect regional de 160 de milioane de euro care tot promite, dar nu ajunge la semnare.<\/p>\n<p>Pe scurt, a fost o radiografie a unui sistem aflat sub presiune. \u00a0Presiunea vine din mai multe direc\u021bii: \u00a0legisla\u021bia care cere plan de afaceri actualizat \u0219i o strategie de redeven\u021b\u0103 clar\u0103, \u00a0operatorul care spune c\u0103 lucreaz\u0103 la plan, \u00a0dar nu \u00eel poate prezenta \u00eenc\u0103, localit\u0103\u021bile care a\u0219teapt\u0103 preluarea re\u021belelor \u0219i extinderi, sta\u021bii acre trebuie aduse la standard, conducte vechi care pocnesc \u00een serie, oameni care nu pot fi angaja\u021bi din cauza unor restric\u021bii, \u00a0iar la orizont st\u0103 un contract de finan\u021bare anun\u021bat ca \u201eimminent\u201d de prea mult timp.<\/p>\n<p>La mas\u0103 au stat pre\u0219edintele ADI Ap\u0103 V\u00e2lcea, C\u0103t\u0103lin Avan, directorul general al Apavil S.A., Ion Florescu, viceprimarul municipiului R\u00e2mnicu V\u00e2lcea, Eusebiu Ve\u021beleanu, \u00eempreun\u0103 cu directori din operator: David Borleanu (Tehnic-Exploatare), Constantin Tudora (Comercial), Nicoleta B\u0103l\u0103 (Economic). Au venit \u0219i reprezentan\u021bi din teritoriu. Unii au ridicat probleme punctuale, al\u021bii au cerut termene. To\u021bi au vrut r\u0103spunsuri.<\/p>\n<p><strong>Ordinea de zi care apas\u0103: h\u00e2rtii, criterii, responsabilit\u0103\u021bi<\/strong><\/p>\n<p>Primul strat al \u0219edin\u021bei a fost administrativ, dar cu mize reale. Aprobarea procesului-verbal precedent nu a ridicat valuri. S-a intrat rapid \u00een tema Scrisorii de a\u0219tept\u0103ri pentru selec\u021bia a doi membri \u00een Consiliul de Administra\u021bie al Apavil S.A., \u00een acord cu solicitarea AMEPIP, apoi \u00een propunerea unui administrator provizoriu \u00een CA, venit\u0103 prin Hot\u0103r\u00e2rea Consiliului Local nr. 236\/29.08.2025 a municipiului R\u00e2mnicu V\u00e2lcea. \u00a0Aici, lucrurile s-au \u00eencordat: numele propus, Marian Dumitru, a fost analizat pe criteriile cerute de legisla\u021bia privind guvernan\u021ba \u00eentreprinderilor publice. \u00a0Documentele depuse pe 26 septembrie arat\u0103 studii \u00een domeniul educa\u021biei fizice \u0219i sport, plus un master \u00een management sportiv. \u00cens\u0103 Autoritatea pentru Monitorizarea \u0219i Evaluarea Performan\u021belor \u00centreprinderilor Publice a clarificat prin adres\u0103 c\u0103, pentru administratori provizorii, se cer studii \u0219i experien\u021b\u0103 de cel pu\u021bin 7 ani \u00een \u0219tiin\u021be inginere\u0219ti, economice, sociale, juridice sau \u00een domeniul de activitate al operatorului public, precum \u0219i experien\u021b\u0103 \u00een conducerea unor societ\u0103\u021bi ori regii. <strong><em>Concluzia a fost net\u0103: \u00eencadrarea legal\u0103 nu este \u00eendeplinit\u0103<\/em><\/strong>.<\/p>\n<p><strong><u>C\u0103t\u0103lin Avan a rezumat sec situa\u021bia<\/u><\/strong><strong>:<\/strong> \u201e<strong><em>La nivelul asocia\u021biei, dup\u0103 noua lege, ADI Apa V\u00e2lcea a devenit autoritate tutelar\u0103, nu mai este prim\u0103ria. Propunerea trimis\u0103 nu bifeaz\u0103 condi\u021biile cerute. Vom cere \u00eenc\u0103 o dat\u0103 puncte de vedere scrise \u0219i vom decide \u00een comisia desemnat\u0103<\/em><\/strong>.\u201d Decizia pe subiect r\u0103m\u00e2ne la ADI. Semnalul, \u00eens\u0103, e clar: la un operator de ap\u0103 \u0219i canalizare, criteriile de selec\u021bie nu pot fi tratate formal. \u00a0Alegerea oamenilor potrivi\u021bi influen\u021beaz\u0103 investi\u021biile, mentenan\u021ba, modul \u00een care se r\u0103sppunde la avarii \u0219i felul \u00een care se explic\u0103 publicului de ce \u201enu curge la robinet\u201d.<\/p>\n<p><strong>Planul de afaceri care nu mai vine: redeven\u021ba, legea \u0219i nota ANRSC<\/strong><\/p>\n<p>A urmat punctul fierbinte: planul de afaceri al Apavil S.A., pies\u0103 obligatorie potrivit Ordinului ANRSC nr. 231\/2022. \u00cen mod concret, documentul ar trebui s\u0103 con\u021bin\u0103, pe l\u00e2ng\u0103 direc\u021biile strategice de dezvoltare a serviciilor de ap\u0103 \u0219i canalizare, m\u0103suri de cre\u0219tere a eficien\u021bei, planuri de investi\u021bii \u0219i o strategie de redeven\u021b\u0103. \u00a0Redeven\u021ba nu e doar o formul\u0103, \u00a0ea trebuie calculat\u0103 cu includerea gradual\u0103, \u00een pre\u021buri \u0219i tarife, a echivalentului amortiz\u0103rii patrimoniului public folosit, \u021bin\u00e2nd cont de termenele de amortizare din legisla\u021bie \u0219i de suportabilitatea oamenilor. \u00a0Ast\u0103zi, a subliniat ADI, procentul aplicat \u2013 0,015% din valoarea bunurilor UAT-urilor concesionate c\u0103tre operator \u2013 nu este aliniat cu prevederile art. 29 alin. (11) din Legea 51\/2006 \u0219i ale art. 25 din Legea 241\/2006. Iar ANRSC, dup\u0103 un control \u00een 2023, a l\u0103sat scris c\u0103 nivelul redeven\u021bei \u0219i modul de stabilire trebuie aduse \u00een litera legii. F\u0103r\u0103 plan, nu se poate corecta.<\/p>\n<p><strong><u>C\u0103t\u0103lin Avan a spus ap\u0103sat<\/u><\/strong><strong>:<\/strong> \u201e<strong><em>De aceast\u0103 dat\u0103, operatorul nu a prezentat planul de afaceri. F\u0103r\u0103 el, redeven\u021ba nu poate fi recalculat\u0103 a\u0219a cum cere legea, nu pot fi asumate direc\u021biile de \u00eenlocuire a conductelor vechi \u0219i nici calendarul de investi\u021bii pentru prelu\u0103ri \u0219i extinderi. De aici deriv\u0103 blocaje reale la preluarea re\u021belelor din localit\u0103\u021bi.<\/em><\/strong>\u201d<\/p>\n<p><strong><u>R\u0103spunsul lui Ion Florescu a fost calm, dar nu a lini\u0219tit sala<\/u><\/strong>: \u201e<em>Nu e corect s\u0103 se spun\u0103 c\u0103 nu avem plan. Este \u00een lucru, am achizi\u021bionat serviciile unei firme. Nu e finalizat, dar se lucreaz\u0103. \u0218ti\u021bi cum e cu achizi\u021biile. Termenul estimat: p\u00e2n\u0103 la finele acestei luni<\/em>.\u201d<\/p>\n<p><strong><u>Replica a venit sec de la prezidiu<\/u><\/strong>: \u201e<strong><em>Nu \u00eel avem. \u0218i dac\u0103 nu \u00eel avem, nu calcul\u0103m redeven\u021ba<\/em><\/strong>.\u201d<\/p>\n<p><strong><u>Directorul general a admis<\/u><\/strong>: \u201e<em>Corect c\u0103 nu \u00eel avem predat. Dar se lucreaz\u0103 la el. Sunt multe cifre, multe localit\u0103\u021bi. Planul nu \u00eenseamn\u0103 dou\u0103 pagini, e un material stufos.<\/em>\u201d<\/p>\n<p><strong><u>Avan a punctat distan\u021ba de timp<\/u><\/strong>: \u201e<strong><em>Din 2022 avem sarcin\u0103 de la ANRSC \u2013 nou\u0103, la ADI, \u0219i operatorului. Au trecut trei ani<\/em><\/strong>.\u201d<\/p>\n<p><strong>Florescu a invocat contextul:<\/strong> \u201e<em>Nu pot \u00eenc\u0103lca legea. \u00cen 2022 \u0219i 2023 nu s-au putut face achizi\u021bii. Dac\u0103 nu \u0219ti\u021bi, v\u0103 spun eu<\/em>.\u201d<\/p>\n<p><strong><u>Avan a r\u0103spuns din \u201dteren\u201d<\/u><\/strong>: \u201e<strong><em>Ca primar la P\u0103u\u0219e\u0219ti-Ot\u0103s\u0103u am reu\u0219it achizi\u021bii. F\u0103r\u0103 plan predat \u0219i aprobat, re\u021belele nu pot fi preluate. Nu pentru c\u0103 cineva nu vrea, ci pentru c\u0103 lipsesc pa\u0219ii de procedur\u0103<\/em><\/strong>.\u201d<\/p>\n<p>Pe o tem\u0103 tehnic\u0103 s-a construit, de fapt, miza major\u0103 a \u0219edin\u021bei: f\u0103r\u0103 plan, operatorul r\u0103m\u00e2ne f\u0103r\u0103 busol\u0103 pe redeven\u021b\u0103, f\u0103r\u0103 list\u0103 de priorit\u0103\u021bi pe \u00eenlocuiri \u0219i f\u0103r\u0103 instrument pentru prelu\u0103ri. Iar ADI nu poate \u021bine locul operatorului, dar nici nu poate accepta \u00eent\u00e2rzierea la nesf\u00e2r\u0219it. Toate celelalte discu\u021bii acre \u00a0au urmat pleac\u0103 din aceast\u0103 lips\u0103.<\/p>\n<p><strong>Galicea: \u201eSta\u021bia e func\u021bional\u0103.\u201d \u2013 \u201e\u00cen procedura noastr\u0103, nu.\u201d<\/strong><\/p>\n<p>Din sal\u0103, <strong>administratorul public de la Galicea<\/strong> a ridicat o problem\u0103 concret\u0103: \u201e<em>\u00centreb \u00een numele primarului despre preluarea sistemului de canalizare. Din c\u00e2te am \u00een\u021beles, trebuia preluat din 2020. \u00cen ce stadiu e? Se pune problema extinderii, \u021bin\u00e2nd cont c\u0103 \u00een localitate sunt circa 4.000 de locuitori<\/em>?\u201d<\/p>\n<p><strong><u>R\u0103spunsul directorului Apavil a fost sec<\/u><\/strong>: \u201ePrima condi\u021bie ca s\u0103 putem prelua este ca sta\u021bia \u0219i re\u021beaua s\u0103 fie func\u021bionale. La dumneavoastr\u0103 nu sunt. Am transmis tuturor prim\u0103riilor o procedur\u0103 scris\u0103. Fiecare \u0219tie ce are de f\u0103cut. Primarul de la Galicea \u0219tie exact care e problema cu sta\u021bia \u0219i re\u021beaua.\u201d<\/p>\n<p><strong><u>Replica din sal\u0103<\/u><\/strong>: \u201eL-am sunat pe primar. Spune c\u0103 sta\u021bia \u0219i sistemul sunt func\u021bionale.\u201d<\/p>\n<p><strong><u>Ion Florescu:<\/u><\/strong> \u201eVom face o \u00eent\u00e2lnire.\u201d<\/p>\n<p>\u00centre \u201efunc\u021bional\u201d local \u0219i \u201efunc\u021bional\u201d \u00een procedura operatorului e o pr\u0103pastie. Cuvintele pot fi acelea\u0219i, fi\u0219ele tehnice \u2013 nu. Iar f\u0103r\u0103 o certificare la indicatorii ceru\u021bi de operator, preluarea nu se produce. Din nou, planul de afaceri ar trebui s\u0103 pun\u0103 criterii, termene, pa\u0219i.<\/p>\n<p><strong>Lunge\u0219ti: \u201eToate sunt rezolvate.\u201d \u2013 \u201e\u00centr-o s\u0103pt\u0103m\u00e2n\u0103 \u00eencepem preluarea.\u201d<\/strong><\/p>\n<p>Cazul Lunge\u0219ti a adus o raz\u0103 de claritate. Directorul general a anun\u021bat c\u0103 mai sunt documente de \u00eenchis \u0219i c\u0103 a trimis clarific\u0103ri. <strong>Primarul Tiberiu Costea a intervenit<\/strong>: \u201eLe-am primit. Toate sunt rezolvate.\u201d<\/p>\n<p><strong>Florescu a replicat prompt<\/strong>: \u201eAtunci, \u00een cel mai scurt timp, \u00eentr-o s\u0103pt\u0103m\u00e2n\u0103 \u00eencepem preluarea.\u201d<\/p>\n<p>A urmat o \u00eentrebare t\u0103ioas\u0103 din prezidiu: \u201e<strong>Deci nu mai a\u0219tepta\u021bi planul de afaceri? Pute\u021bi face preluarea, iar planul se finalizeaz\u0103 pe parcurs<\/strong>?\u201d<\/p>\n<p><strong><u>R\u0103spunsul directorului<\/u><\/strong>: \u201eExact. C\u00e2nd se semneaz\u0103 contractul de concesiune, se lucreaz\u0103 \u0219i la plan. Vom \u00eencerca s\u0103 prelu\u0103m re\u021belele existente \u0219i \u00een alte localit\u0103\u021bi. Problema cea mare e cu re\u021belele vechi, f\u0103cute c\u00e2ndva de prim\u0103rii, cu \u021bevi sub standard. Acolo bubuitul e frecvent. Primarii nu au bani \u0219i arunc\u0103 problema la operator.\u201d<\/p>\n<p><strong><u>C\u0103t\u0103lin Avan a mu\u0219cat din miez:<\/u><\/strong> \u201e <strong><em>Pune\u021bi aceste probleme \u00een plan, cu m\u0103suri pentru reducerea pierderilor. \u00cenlocuirea acelor sisteme trebuie s\u0103 fie pe operator, nu pe prim\u0103rii<\/em><\/strong>.\u201d<\/p>\n<p><strong>Florescu a recunoscut gravitatea<\/strong>: \u201e<em>Dup\u0103 10 ani de exploatare a unui sistem, dac\u0103 ai 30 de avarii pe zi sau pe s\u0103pt\u0103m\u00e2n\u0103, e clar c\u0103 ceva nu e \u00een regul\u0103<\/em>.\u201d<\/p>\n<p><strong>Resursa uman\u0103: locuri libere, dar m\u00e2ini legate<\/strong><\/p>\n<p>De la avarii s-a ajuns firesc la oameni. <strong>Avan a indicat zona Govora:<\/strong> \u201eAcolo e pr\u0103p\u0103d. Nu sunt oameni.\u201d<\/p>\n<p><strong>Ion Florescu a r\u0103spuns ap\u0103sat<\/strong>: \u201e <em>Da\u021bi-mi varianta. Pot s\u0103 angajez 500 de salaria\u021bi m\u00e2ine. Am cinci memorandumuri la Guvern pentru a ni se permite angaj\u0103ri. E vina mea c\u0103 nu primesc voie? O ordonan\u021b\u0103 ne-a interzis angaj\u0103rile<\/em>.\u201d<\/p>\n<p>Mesajul e clar: operatorul are posturi, are nevoie de echipe de interven\u021bie, dar se love\u0219te de un \u201e NU \u201d pe linie administrativ\u0103. Aici, ADI nu poate \u00eenlocui Guvernul, dar poate sus\u021bine demersul \u2013 pentru c\u0103 f\u0103r\u0103 echipe complete, orice plan de investi\u021bii r\u0103m\u00e2ne pe h\u00e2rtie.<\/p>\n<p><strong>Cazul P\u0103u\u0219e\u0219ti-Ot\u0103s\u0103u \u2013 Fr\u00e2nce\u0219ti: \u201eCurge din bazin ca pe picior.\u201d Cine \u00eenchide robinetul?<\/strong><\/p>\n<p>Discu\u021bia a devenit foarte concret\u0103 c\u00e2nd C\u0103t\u0103lin Avan, \u00een dubl\u0103 calitate \u2013 pre\u0219edinte ADI \u0219i primar la P\u0103u\u0219e\u0219ti-Ot\u0103s\u0103u \u2013 a descris o situa\u021bie greu de acceptat: <em>\u201eAvem o extindere de re\u021bea bran\u0219at\u0103 ilegal la sistemul nostru, aflat\u0103 pe teritoriul comunei Fr\u00e2nce\u0219ti. \u021aeava este spart\u0103 \u00een zeci de locuri. Apavil remediaz\u0103 c\u00e2te o sp\u0103rtur\u0103 la un interval mediu de un an. Nu exagerez. Pe c\u00e2nd alte zone se v\u0103itau de lips\u0103 de ap\u0103 din cauza secetei, pe drumul jude\u021bean la noi era lac, pentru c\u0103 acea \u021beav\u0103 curgea continuu. \u201d <strong>Nu am oameni<\/strong> \u201d nu \u0219tiu dac\u0103 e cel mai bun argument. Nu putem accepta ca ap\u0103 din sistemul nostru s\u0103 ajung\u0103, printr-o conduct\u0103 pr\u0103p\u0103dit\u0103, \u00een alt\u0103 parte. V-am trimis filmare, v\u0103 mai trimit. De ce s\u0103 curg\u0103 non-stop \u0219i s\u0103 oprim alimentarea \u00een localitate ca s\u0103 lipim \u00eenc\u0103 un petic<\/em>?\u201d<\/p>\n<p><strong><u>Florescu a r\u0103spuns defensiv<\/u><\/strong>: \u201e<em>Apavil e concesionar, proprietar e UAT. Rezolva\u021bi problema propriet\u0103\u021bii. Noi schimb\u0103m membranele la bazine<\/em>.\u201d<\/p>\n<p><strong><u>Avan a taxat formula<\/u><\/strong>: \u201e<strong><em>Despre ce membrane vorbi\u021bi? La noi, membrana are 25 de ani. Cost\u0103 13 mii de euro. De trei ani tot aud c\u0103 se rezolv\u0103. Am v\u0103zut c\u0103 Apavil a avut profit anul trecut<\/em><\/strong>.\u201d<\/p>\n<p><strong><u>Directorul general<\/u><\/strong>: \u201e<em>S-au schimbat \u00een alte localit\u0103\u021bi. Urmeaz\u0103 \u0219i la dumneavoastr\u0103. Putem face situa\u021bii pe fiecare localitate \u0219i investi din profitul aferent.\u201d<\/em><\/p>\n<p><strong><u>Avan a t\u0103iat scurt<\/u><\/strong>: \u201e<strong><em>Ce profit s\u0103 aib\u0103 o prim\u0103rie<\/em><\/strong>?\u201d<\/p>\n<p><strong><em><u>Florescu a ripostat<\/u><\/em><\/strong>: \u201eDe ce nu vre\u021bi s\u0103 lua\u021bi \u00een administrare sistemul de ap\u0103 \u0219i canalizare?\u201d<\/p>\n<p><strong><u>Avan a \u00eenchis cercul:<\/u><\/strong> \u00a0\u201e <strong><em>A\u021bi promis anul trecut c\u0103 include\u021bi problema \u00een programul de investi\u021bii. Nu a\u021bi inclus. Normal s\u0103 fiu nemul\u021bumit. Dup\u0103 aceea spune\u021bi c\u0103 sunt pierderi la P\u0103u\u0219e\u0219ti-Ot\u0103s\u0103u. P\u0103i curge pe drum<\/em><\/strong> \u201d<\/p>\n<p><strong>\u00cen discu\u021bie a intrat \u0219i primarul din Fr\u00e2nce\u0219ti, Daniel Paraschiv:<\/strong> \u201e<em>Nu se poate interveni u\u0219or acolo. Drumul are garan\u021bie, e modernizat cu bani europeni. Trebuie acordul constructorului pentru partea de acostament.<\/em>\u201d<\/p>\n<p>Chiar \u0219i a\u0219a, esen\u021ba r\u0103m\u00e2ne: pierderile de ap\u0103 sunt uria\u0219e, iar opera\u021bional e nevoie de o sec\u021bionare curat\u0103, proiectat\u0103 corect, cu avize \u0219i responsabilit\u0103\u021bi stabilite. Altfel, se toarn\u0103 ap\u0103 \u00eentr-o sit\u0103.<\/p>\n<p><strong>\u201e\u00cenc\u0103 JASPERS g\u00e2nde\u0219te\u201d: proiectul regional de 160 de milioane de euro<\/strong><\/p>\n<p>Primarul din Fr\u00e2nce\u0219ti a deschis alt dosar: proiectul regional de ap\u0103 \u0219i canalizare, plimbat de la POS Mediu la POIM \u0219i acum la Programul Dezvoltare Durabil\u0103. \u201e<strong><em>Timp de 10 ani am a\u0219teptat, nu am putut depune solicit\u0103ri pe nicio m\u0103sur\u0103, pentru c\u0103 eram prin\u0219i \u00een proiectul Apavil. A\u0219a era condi\u021bia. Au trecut anii, vine Garda de Mediu \u0219i ne \u00eentreab\u0103 de ce nu avem canalizare. E comod s\u0103 se arunce mingea c\u0103tre localit\u0103\u021bi. Dar \u00een tot acest timp s-au pierdut finan\u021b\u0103ri. Acum, finan\u021b\u0103ri noi pe ap\u0103 \u0219i canalizare aproape c\u0103 nu mai exist\u0103. Iar \u00een rural problema apei e critic\u0103. \u00cen dou\u0103 sate nu mai avem ap\u0103 \u00een f\u00e2nt\u00e2ni. <u>P\u00e2nza a cobor\u00e2t din cauza exploat\u0103rii haotice de agregate de pe cursuri<\/u><\/em><\/strong><u>.<\/u>\u201d<\/p>\n<p><strong>Ion Florescu a admis criza<\/strong>: \u201e\u00cen zonele afectate de secet\u0103, anul trecut \u0219i anul acesta, nu am putut face mare lucru. Trebuie s\u0103 g\u00e2ndim pu\u021buri forate.\u201d<\/p>\n<p><strong>Despre proiectul regional, a ad\u0103ugat<\/strong>: \u201e <strong><em><u>\u00cenc\u0103 JASPERS g\u00e2nde\u0219te<\/u>. Ni s-a promis c\u0103 p\u00e2n\u0103 cel t\u00e2rziu pe 10 decembrie se semneaz\u0103 contractul de finan\u021bare. Au mai r\u0103mas \u00een proiect: Muereasca, Brezoi, Voineasa, Bujoreni, D\u0103e\u0219ti, P\u0103u\u0219e\u0219ti-M\u0103gla\u0219i, Mih\u0103e\u0219ti, Horezu, Vaideeni, Fr\u00e2nce\u0219ti, Bude\u0219ti, Dr\u0103g\u0103\u0219ani. Valoarea actual\u0103: 160 milioane de euro.<\/em><\/strong>\u201d<\/p>\n<p><strong><u>C\u0103t\u0103lin Avan a r\u0103spuns cu pruden\u021b\u0103<\/u><\/strong>: \u201e Este foarte important. Spune\u021bi c\u0103, cel t\u00e2rziu, pe 10 decembrie se semneaz\u0103. S\u0103 tr\u0103im s-o vedem \u0219i pe asta. C\u00e2nd am depus proiectul de ap\u0103 \u0219i canalizare pe POIM, ghidul s-a schimbat de nenum\u0103rate ori, de parc\u0103 s\u0103 nu apuc\u0103m s\u0103 lu\u0103m bani. S\u0103 dea Dumnezeu s\u0103 o vedem \u0219i pe asta.\u201d<\/p>\n<p>\u00centr-o fraz\u0103: localit\u0103\u021bile sper\u0103, operatorul promite, ADI cere termene ferme, iar finan\u021batorii \u00eenchid ghiduri \u0219i le redeschid cu alte cerin\u021be. Iar \u00een sate, apa scade la f\u00e2nt\u00e2ni.<\/p>\n<p><strong>Membrane, bazine, pu\u021buri, conducte: lista scurt\u0103 a lucrurilor care trebuie f\u0103cute \u201eieri\u201d<\/strong><\/p>\n<p>Dincolo de polemica juridic\u0103 pe redeven\u021b\u0103, exist\u0103 lucruri simple, cuantificabile, de natur\u0103 tehnic\u0103: membrane de bazine vechi de un sfert de secol, conducte neconforme care pocnesc \u00een lan\u021b, sec\u021biuni improvizate f\u0103r\u0103 proiect, bazine care pierd, pu\u021buri care trebuie forate rapid \u00een zone aride. Directorul general a promis: \u201e<strong><em>Vor ajunge echipele \u0219i la P\u0103u\u0219e\u0219ti-Ot\u0103s\u0103u. La unii s-au schimbat, urmeaz\u0103 \u0219i acolo<\/em><\/strong>.\u201d A ad\u0103ugat inclusiv ideea unei eviden\u021be separate pe localit\u0103\u021bi, pentru ca interven\u021biile s\u0103 fie mai transparente. Dar p\u00e2n\u0103 la transparen\u021b\u0103, oamenii a\u0219teapt\u0103 robinetul deschis.<\/p>\n<p><strong><u>C\u0103t\u0103lin Avan a fixat o m\u0103sur\u0103 minim\u0103<\/u><\/strong>: \u201e<em>Bugeta\u021bi pentru anul viitor \u00eenlocuirea membranei \u0219i interven\u021bia pe acea extindere. Nu mai pierde\u021bi timp<\/em>.\u201d<\/p>\n<p><strong><u>Florescu a r\u0103spuns prudent<\/u><\/strong>: \u201eV<em>om face un studiu, vedem ce bani su<\/em>nt.\u201d<\/p>\n<p>C\u00e2nd r\u0103spunsurile sunt la condi\u021bional, nervozitatea cre\u0219te. \u00a0Dar f\u0103r\u0103 posturi deschise pentru interven\u021bii \u0219i f\u0103r\u0103 plan aprobat, \u00a0condi\u021bionalul pare s\u0103 fie limba de serviciu.<\/p>\n<p>\u00cen \u00eenchiderea \u0219edin\u021bei a fost loc \u0219i de promisiuni: \u201e<strong><em>S\u0103 o vedem \u0219i pe asta<\/em><\/strong>\u201d, a spus C\u0103t\u0103lin Avan, cu referire la semnarea contractului p\u00e2n\u0103 pe 10 decembrie.<\/p>\n<p>Restul e deja cunoscut: proceduri, note, tabele, explica\u021bii tehnice.<\/p>\n<p>P\u00e2n\u0103 la urm\u0103toarea \u0219edin\u021b\u0103, planul de afaceri, redeven\u021ba, prelu\u0103rile \u0219i investi\u021biile fac parte din acela\u0219i mecanism, care trebuie s\u0103 func\u021bioneze. Restul sunt detalii.<\/p>\n<p>Pentru c\u0103 problema nu e \u00een paragrafe \u0219i articole, ci \u00een teren \u2013 acolo unde sunt pierderi de ap\u0103 sau nu mai curge. Iar oamenii nu pot pl\u0103ti, la nesf\u00e2r\u0219it, pentru \u201eaproape gata.\u201d<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-53977\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/apavil-08-octombrie-1-300x225-1.jpg\" width=\"300\" height=\"225\" title=\"apavil-08-octombrie-1-300x225-1\"><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<p> Source URL: https:\/\/www.impactreal.ro\/2025\/10\/09\/apa-cifre-si-nerabdare-sedinta-care-a-pus-pe-masa-planul-de-afaceri-al-apavil-redeventa-retelele-care-cedeaza-si-proiectul-regional-blocat\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0218edin\u021ba care a pus pe mas\u0103 planul de afaceri al Apavil: redeven\u021ba, re\u021belele care cedeaz\u0103 \u0219i proiectul regional blocat 9 octombrie 202510 octombrie 2025Claudia Schiopu1SliderActualEveniment Adunarea General\u0103 a Asocia\u021bilor din cadrul Asocia\u021biei de Dezvoltare Intercomunitar\u0103 \u201eAp\u0103 V\u00e2lcea\u201d s-a desf\u0103\u0219urat pe 8 octombrie 2025, la sediul din R\u00e2mnicu V\u00e2lcea, de pe strada C\u0103pitan M\u0103r\u0103\u0219eanu nr. 3. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1084596,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[212],"class_list":["post-1084595","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1084595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1084595"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1084595\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/1084596"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1084595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1084595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1084595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}