{"id":1053543,"date":"2025-11-05T13:14:15","date_gmt":"2025-11-05T10:14:15","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1053543"},"modified":"2025-11-05T13:14:15","modified_gmt":"2025-11-05T10:14:15","slug":"ppc-renewables-romania-va-extinde-parcul-eolian-deleni-cel-mai-mare-din-regiunea-moldovei-cu-inca-85-mw-ziarul-de-vaslui","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1053543","title":{"rendered":"PPC Renewables Rom\u00e2nia va extinde parcul eolian Deleni, cel mai mare din regiunea Moldovei, cu \u00eenc\u0103 85 MW &#8211; Ziarul de Vaslui"},"content":{"rendered":"<div class=\"entry-content clearfix\">\n<ul>\n<li><em>PPC Renewables Rom\u00e2nia continu\u0103 planul de cre\u0219tere a portofoliului de energie regenerabil\u0103 prin lansarea celei de-a doua faze a parcului Deleni, jude\u021bul Vaslui<\/em><\/li>\n<li><em>Parcul eolian de 140 MW este cel mai mare din Moldova,\u00a0<a>iar faza a doua va ad\u0103uga 85 MW de\u00a0<\/a>capacitate instalat\u0103 de produc\u021bie\u00a0<\/em><\/li>\n<\/ul>\n<p>PPC Renewables Rom\u00e2nia va \u00eencepe lucr\u0103rile la cea de-a doua faz\u0103 a parcului eolian Deleni din jude\u021bul Vaslui, cel mai mare proiect eolian din regiunea Moldovei. Capacitatea parcului, a c\u0103rui prim\u0103 faz\u0103 de 140 MW este \u00een construc\u021bie, va fi majorat\u0103 cu 85 MW, prin construirea a 14 noi turbine eoliene de 6,1 MW fiecare.\u00a0<\/p>\n<p>Turbinele vor fi\u00a0amplasate \u00een proximitatea localit\u0103\u021bii Bogd\u0103ni\u021ba \u0219i vor ridica puterea total\u0103 instalat\u0103 a proiectului la peste 225 MW.\u00a0<\/p>\n<p>\u201eContinu\u0103m s\u0103 facem pa\u0219i concre\u021bi \u00een dezvoltarea portofoliului nostru \u0219i r\u0103m\u00e2nem primul investitor privat major care contribuie la dezvoltarea regional\u0103 a Moldovei. Dup\u0103 prima etap\u0103 a parcului eolian de 140 MW de la Deleni, extindem investi\u021bia cu \u00eenc\u0103 85 MW prin acest proiect. Astfel, contribuim cu peste 225 MW de energie verde \u00een mixul energetic na\u021bional \u0219i sprijinim reducerea deficitului de capacit\u0103\u021bi de produc\u021bie din nordul \u021b\u0103rii,\u201d a declarat Adrian Dugulan, Director General al PPC Renewables Rom\u00e2nia.<\/p>\n<p>Proiectul face parte din programul de extindere a portofoliului de energie regenerabil\u0103 al PPC Renewables Rom\u00e2nia \u0219i continu\u0103 investi\u021bia local\u0103 \u00eenceput\u0103 prin\u00a0<a href=\"https:\/\/www.ppcenergy.ro\/media\/comunicate-de-presa\/ppc-renewables-romania-a-instalat-primele-turbine-pentru-cel-mai-mare-parc-eolian-din-moldova-in-judetul-vaslui\/\">parcul eolian Deleni de 140 MW, aflat deja \u00eentr-o etap\u0103 avansat\u0103 de construc\u021bie<\/a>. \u00cen ultimul an, PPC Renewables Rom\u00e2nia a extins portofoliul de energie verde, ajung\u00e2nd la peste 1,3 GW, prin noi proiecte eoliene, fotovoltaice \u0219i de stocare.<\/p>\n<p>Extinderea produc\u021biei din surse regenerabile \u00een regiunea Moldovei contribuie la diversificarea geografic\u0103 a mixului energetic na\u021bional \u0219i la consolidarea securit\u0103\u021bii energetice. \u00cempreun\u0103, cele dou\u0103 proiecte vor ajuta la reducerea deficitului de capacit\u0103\u021bi de produc\u021bie din nordul \u021b\u0103rii, \u00een contextul \u00een care energia regenerabil\u0103 devine o component\u0103 tot mai important\u0103 pentru siguran\u021ba energetic\u0103 a Rom\u00e2niei.<\/p>\n<p>\u00cen urma finaliz\u0103rii celor dou\u0103 etape, PPC Renewables Rom\u00e2nia va dep\u0103\u0219i pragul de 1,5 GW \u00een capacit\u0103\u021bi de energie din surse regenerabile. \u00cen prezent, PPC Renewables Rom\u00e2nia are o capacitate instalat\u0103 de peste 1,3 GW \u0219i este cel mai mare produc\u0103tor privat de energie regenerabil\u0103 din Rom\u00e2nia.\u00a0<\/p>\n<p>Grupul PPC \u00ee\u0219i dezvolt\u0103 rapid portofoliul de surse regenerabile \u00een Grecia, Rom\u00e2nia, Italia \u0219i Bulgaria, av\u00e2nd o capacitate instalat\u0103 crescut\u0103 de la 4,7 GW, \u00een prima jum\u0103tate a anului 2024, la 6,3 GW la sf\u00e2r\u0219itul lunii iunie 2025. Obiectivul Grupului PPC este de a ajunge la o capacitate instalat\u0103 din surse regenerabile de 11,8 GW p\u00e2n\u0103 \u00een 2027. \u00cen prezent, noi proiecte de 3,7 GW se afl\u0103 \u00een stadiul de construc\u021bie sau preg\u0103tite pentru construire. \u00cen Rom\u00e2nia, PPC Renewables, parte a Grupului PPC, este lider \u00een energia regenerabil\u0103, cu o capacitate instalat\u0103 \u00een prezent de peste 1,3 GW \u0219i continu\u0103 \u00eentr-un ritm alert s\u0103 \u00ee\u0219i \u00eent\u0103reasc\u0103 portofoliul prin proiecte de mare anvergur\u0103, fiind cel mare produc\u0103tor privat de energie regenerabil\u0103 din Rom\u00e2nia.<\/p>\n<figure class=\"wp-block-gallery columns-3 is-cropped\">\n<ul class=\"blocks-gallery-grid\">\n<li class=\"blocks-gallery-item\">\n<figure><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"576\" src=\"https:\/\/www.ziaruldevaslui.ro\/?attachment_id=47628\" alt class=\"wp-image-47628\"><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"576\" src=\"https:\/\/www.ziaruldevaslui.ro\/?attachment_id=47629\" alt class=\"wp-image-47629\"><figcaption class=\"blocks-gallery-item__caption\">default<\/figcaption><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"576\" src=\"https:\/\/www.ziaruldevaslui.ro\/?attachment_id=47630\" alt class=\"wp-image-47630\"><figcaption class=\"blocks-gallery-item__caption\">default<\/figcaption><\/figure>\n<\/li>\n<\/ul>\n<\/figure>\n<aside class=\"mashsb-container mashsb-main \">\n<div class=\"mashsb-box\">\n<div class=\"mashsb-count mash-medium\">\n<div class=\"counts mashsbcount\">0<\/div>\n<p><span class=\"mashsb-sharetext\">SHARES<\/span><\/div>\n<div class=\"mashsb-buttons\"><a class=\"mashicon-facebook mash-medium mashsb-noshadow\" href=\"https:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Fwww.ziaruldevaslui.ro%2Fppc-renewables-romania-va-extinde-parcul-eolian-deleni-cel-mai-mare-din-regiunea-moldovei-cu-inca-85-mw%2F\" target=\"_top\" rel=\"nofollow\"><span class=\"text\">Share\u00a0pe\u00a0facebook<\/span><\/a><a class=\"mashicon-twitter mash-medium mashsb-noshadow\" href=\"https:\/\/twitter.com\/intent\/tweet?text=PPC%20Renewables%20Rom%C3%A2nia%20va%20extinde%20parcul%20eolian%20Deleni%2C%20cel%20mai%20mare%20din%20regiunea%20Moldovei%2C%20cu%20%C3%AEnc%C4%83%2085%20MW&amp;url=https:\/\/www.ziaruldevaslui.ro\/?p=47627\" target=\"_top\" rel=\"nofollow\"><span class=\"text\">Share\u00a0pe\u00a0twitter<\/span><\/a><\/div>\n<\/div>\n<\/aside>\n<\/div>\n<div class=\"entry-content\">\n<p>Ini\u021bial am crezut c\u0103 Ionel Sandu s-a apucat de Stand Up Comedy. Cu afacerile nu st\u0103 extraordinar, cu politica nici<\/p>\n<\/div>\n<p> Source URL: https:\/\/www.ziaruldevaslui.ro\/ppc-renewables-romania-va-extinde-parcul-eolian-deleni-cel-mai-mare-din-regiunea-moldovei-cu-inca-85-mw\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PPC Renewables Rom\u00e2nia continu\u0103 planul de cre\u0219tere a portofoliului de energie regenerabil\u0103 prin lansarea celei de-a doua faze a parcului Deleni, jude\u021bul Vaslui Parcul eolian de 140 MW este cel mai mare din Moldova,\u00a0iar faza a doua va ad\u0103uga 85 MW de\u00a0capacitate instalat\u0103 de produc\u021bie\u00a0 PPC Renewables Rom\u00e2nia va \u00eencepe lucr\u0103rile la cea de-a doua [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[218],"class_list":["post-1053543","post","type-post","status-publish","format-standard","hentry","category-romania","tag-ziaruldevaslui-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1053543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1053543"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1053543\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1053543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1053543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1053543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}