{"id":1048207,"date":"2025-08-25T00:00:00","date_gmt":"2025-08-24T21:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1048207"},"modified":"2025-08-25T00:00:00","modified_gmt":"2025-08-24T21:00:00","slug":"a-fost-lansata-licitatia-pentru-ultimul-tronson-al-rutei-alternative-suceava-botosani-bugetul-alocat-depaseste-60-de-milioane-de-lei","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1048207","title":{"rendered":"A fost lansat\u0103 licita\u021bia pentru ultimul tronson al rutei alternative Suceava- Boto\u0219ani. Bugetul alocat dep\u0103\u0219e\u0219te 60 de milioane de lei"},"content":{"rendered":"<div class=\"entry-content\">\n<p><a href=\"https:\/\/www.botosaninews.ro\/wp-content\/uploads\/2018\/01\/sosea-cde-centura-stiri-botosani.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignright size-medium wp-image-342356\" src=\"https:\/\/www.botosaninews.ro\/wp-content\/uploads\/2018\/01\/sosea-cde-centura-stiri-botosani-300x185.jpg\" alt=\"sosea de centura, stiri, botosani\" width=\"300\" height=\"185\"><\/a>Prim\u0103ria municipiului Suceava a lansat <a href=\"https:\/\/www.botosaninews.ro\/575719\/economic\/cel-mai-scump-apartament-din-botosani-pretul-de-vanzare-depaseste-un-milion-de-lei\/\"><span>licita\u021bia<\/span><\/a>pentru ultimul tronson al rutei alternative Suceava- Boto\u0219ani. Procedura de achizi\u021bie are ca scop contractarea firmelor care s\u0103 asigure at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia pentru etapa a treia a \u201cRute alternativ\u0103 Suceava- Boto\u0219ani, pe tronsonul de la pod peste r\u00e2ul Suceava p\u00e2n\u0103 la DN29), respectiv drum, canalizare pluvial\u0103 \u0219i pasaj superior de cale ferat\u0103\u201d.<\/p>\n<p>Acest tronson de drum are \u00een total 1.284 metri \u0219i va dispune de un viaduct peste calea ferat\u0103 de 1.015 metri. L\u0103\u021bimea drumului va fi de 12 metri, din care 8 metri sunt parte carosabil\u0103, la care se adaug\u0103 trotuarele, cu l\u0103\u021bime de 1,5 metri<\/p>\n<p>Valoarea estimata a achizitiei este de 62.947.430,00 lei fara TVA si se compune din proiectare si asistenta tehnica- 2.190.000,00 lei fara TVA, cheltuieli pentru relocarea\/protectia utilitatilor- 2.000.000,00 lei fara TVA; cheltuieli pentru investitia de baza- cheltuieli de executie: 57.257.430,00 lei fara TVA, dar \u0219i cheltuieli pentru organizarea de santier- 1.500.000,00 lei fara TVA.<\/p>\n<p>Termenul limit\u0103 pentru depunerea ofertelor din partea firmelor interesate este de 3 august.<\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"PVnV65TPKz\">\n<p><a href=\"https:\/\/www.botosaninews.ro\/576458\/social\/sofer-de-19-ani-din-botosani-prins-in-timp-ce-oferea-mita-politistilor-ca-sa-l-ierte-ca-a-circulat-cu-viteza\/\">\u0218ofer de 19 ani din Boto\u0219ani, prins \u00een timp ce oferea mit\u0103 poli\u021bi\u0219tilor ca s\u0103-l ierte c\u0103 a circulat cu vitez\u0103<\/a><\/p>\n<\/blockquote>\n\n<p>\u00a0<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Prim\u0103ria municipiului Suceava a lansat licita\u021biapentru ultimul tronson al rutei alternative Suceava- Boto\u0219ani. Procedura de achizi\u021bie are ca scop contractarea firmelor care s\u0103 asigure at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia pentru etapa a treia a \u201cRute alternativ\u0103 Suceava- Boto\u0219ani, pe tronsonul de la pod peste r\u00e2ul Suceava p\u00e2n\u0103 la DN29), respectiv drum, canalizare pluvial\u0103 \u0219i pasaj [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[174],"class_list":["post-1048207","post","type-post","status-publish","format-standard","hentry","category-romania","tag-suceavanews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1048207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1048207"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1048207\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1048207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1048207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1048207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}