{"id":1047906,"date":"2025-12-12T11:33:38","date_gmt":"2025-12-12T08:33:38","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1047906"},"modified":"2025-12-12T11:33:38","modified_gmt":"2025-12-12T08:33:38","slug":"incepe-reabilitarea-podului-iuliu-maniu","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1047906","title":{"rendered":"\u00cencepe reabilitarea Podului Iuliu Maniu"},"content":{"rendered":"<div class=\"pf-content\">\n<div id=\"attachment_57317\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2025\/01\/Pod-Iuliu-Maniu-Timisoara-Foto-PMT.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-57317\" loading=\"lazy\" title=\"Pod Iuliu Maniu Timisoara Foto PMT\" alt width=\"900\" height=\"600\" class=\"wp-image-57317 size-full lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2025\/01\/Pod-Iuliu-Maniu-Timisoara-Foto-PMT.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-57317\" loading=\"lazy\" class=\"wp-image-57317 size-full\" title=\"Pod Iuliu Maniu Timisoara Foto PMT\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2025\/01\/Pod-Iuliu-Maniu-Timisoara-Foto-PMT.jpg\" alt width=\"900\" height=\"600\"><\/a><\/p>\n<p id=\"caption-attachment-57317\" class=\"wp-caption-text\">Surs\u0103 foto: Prim\u0103ria Timi\u015foara<\/p>\n<\/div>\n<p><strong>Primarul Timi\u015foarei, Dominic Fritz, a semnat contractul pentru execu\u021bia lucr\u0103rilor de reabilitare a Podului Iuliu Maniu (fost Podul Muncii), una dintre cele mai importante conexiuni dintre Gara de Nord \u0219i Calea \u0218agului.<\/strong><\/p>\n<p>\u00a0<\/p>\n<p>Investi\u021bia Municipalit\u0103\u021bii include, printre altele, consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii, \u0219i r\u0103spunde cerin\u021belor de trafic \u0219i siguran\u021b\u0103 din prezent. Primele interven\u021bii sunt programate de c\u0103tre firma c\u00e2\u0219tig\u0103toare, Tehnodomus, \u00een perioada ianuarie-februarie, \u00een func\u021bie de condi\u021biile meteo.<\/p>\n<p><em>\u201cEste primul \u0219antier nou al anului viitor \u0219i o investi\u021bie pe care o preg\u0103tim de mult timp. Podul de la fosta Fabric\u0103 de \u021aig\u0103ri, construit \u00een anii \u201970, este \u00eentr-o stare avansat\u0103 de degradare \u0219i avea nevoie urgent\u0103 de aceast\u0103 investi\u021bie pentru a r\u0103spunde cerin\u021belor actuale de trafic \u0219i siguran\u021b\u0103. M\u0103 bucur c\u0103 am reu\u0219it s\u0103 atragem fonduri europene consistente pentru aceast\u0103 lucrare \u0219i c\u0103 putem moderniza una dintre cele mai importante leg\u0103turi dintre Gara de Nord \u0219i Calea \u0218agului\u201d,<\/em> a declarat primarul <strong>Dominic Fritz<\/strong>.<\/p>\n<p>Investi\u021bia Prim\u0103riei Timi\u0219oara vizeaz\u0103 consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii cu o structur\u0103 mixt\u0103 o\u021bel-beton, cu p\u0103strarea a c\u00e2te dou\u0103 benzi pe sens, cu l\u0103\u021bimea de 3,50 metri fiecare. Totodat\u0103, trotuarele vor fi l\u0103rgite p\u00e2n\u0103 la 1,75 m, pentru a oferi mai mult spa\u021biu pietonilor, \u0219i vor fi amenajate piste pentru biciclete. Proiectul include \u0219i reabilitarea rampelor, refacerea sc\u0103rilor de acces cu elemente metalice, instalarea unui iluminat arhitectural modern, consolidarea malului Canalului Bega, precum \u0219i plantarea de arbori, pentru \u00eembun\u0103t\u0103\u021birea calit\u0103\u021bii aerului \u0219i a aspectului urban. Dup\u0103 finalizarea lucr\u0103rilor, municipalitatea va putea reintroduce circula\u021bia troleibuzelor pe pod.<\/p>\n<p>Valoarea total\u0103 a proiectului este de aproape 10 milioane de euro, din care aproximativ 7,4 milioane de euro reprezint\u0103 fonduri europene nerambursabile, prin Programul Regional Vest 2021 \u2013 2027, Interven\u021bia regional\u0103 4.1 Mobilitate Urban\u0103 Sustenabil\u0103. Lucr\u0103rile de reabilitare a Podului Iuliu Maniu se ridic\u0103 la valoarea de aproximativ 8 milioane de euro (TVA inclus) \u0219i sunt programate s\u0103 fie finalizate p\u00e2n\u0103 \u00een februarie 2027.<\/p>\n<div id=\"metaslider-id-56545\" class=\"ml-slider-3-18-9 metaslider metaslider-responsive metaslider-56545 ml-slider nav-hidden nav-hidden nav-hidden\">\n<div id=\"metaslider_container_56545\">\n<ul id=\"metaslider_56545\" class=\"rslides\">\n<li><a href=\"https:\/\/iuliustown.ro\/ro\" target=\"_blank\"><img decoding=\"async\" width=\"610\" height=\"260\" alt loading=\"lazy\" title=\"Banner Iulius Town - decembrie 2025 - 610x260\" class=\"slider-56545 slide-60736 lazyload\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2025\/12\/Banner-Iulius-Town-decembrie-2025-610x260-1.png\"><img decoding=\"async\" width=\"610\" height=\"260\" src=\"https:\/\/timpolis.ro\/wp-content\/uploads\/2025\/12\/Banner-Iulius-Town-decembrie-2025-610x260-1.png\" class=\"slider-56545 slide-60736\" alt loading=\"lazy\" title=\"Banner Iulius Town - decembrie 2025 - 610x260\"><\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"printfriendly pf-alignright\"><a href=\"https:\/\/timpolis.ro\/incepe-reabilitarea-podului-iuliu-maniu\/\" rel=\"nofollow\" title=\"Printer Friendly, PDF &amp; Email\"><img decoding=\"async\" alt=\"Print Friendly, PDF &amp; Email\" class=\"lazyload\" src=\"https:\/\/cdn.printfriendly.com\/buttons\/print-button.png\"><img decoding=\"async\" src=\"https:\/\/cdn.printfriendly.com\/buttons\/print-button.png\" alt=\"Print Friendly, PDF &amp; Email\"><\/a><\/div>\n<\/div>\n<p> Source URL: https:\/\/timpolis.ro\/incepe-reabilitarea-podului-iuliu-maniu\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Surs\u0103 foto: Prim\u0103ria Timi\u015foara Primarul Timi\u015foarei, Dominic Fritz, a semnat contractul pentru execu\u021bia lucr\u0103rilor de reabilitare a Podului Iuliu Maniu (fost Podul Muncii), una dintre cele mai importante conexiuni dintre Gara de Nord \u0219i Calea \u0218agului. \u00a0 Investi\u021bia Municipalit\u0103\u021bii include, printre altele, consolidarea structurii de rezisten\u021b\u0103 \u0219i \u00eenlocuirea complet\u0103 a suprastructurii, \u0219i r\u0103spunde cerin\u021belor de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[202],"class_list":["post-1047906","post","type-post","status-publish","format-standard","hentry","category-romania","tag-timpolis-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1047906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1047906"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1047906\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1047906"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1047906"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1047906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}